Permit Information
Permit NumberBLD04-01722
StatusFinaled
Name BERGEY CONSTRUCTION
Site Address 516 S 9TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
(ESTHER SIMPLOT PERFORMING ARTS ACADEMY - DOOR AND WINDOWS AT STAIRWAY) This building is fire sprinklered to substitute for 1-hr fire-resistance-rated construction. To construct nonbearing walls and install a door and several windows on the first story of an existing building. The new construction will be at the top of a stairway that serves the 09th Street entrance to this building. This stairway serves only the basement and first story. Work is to include 2x4 walls with 5/8" gypsum board, a 36 inch wide door, and several windows with safety glass all per the approved drawings and the plan review report on file. Within the remodel area, the location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  12/19/2008  
FIRE-Final Inspection9/21/20049/22/20049/22/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 9/21/2004 at 10:09:12 AM. Contact: ###-####. Sprinkler spacing not affected by new wall; okay for final 9/22/2004 11:05:19 AM
BLD-Final9/20/20049/21/20049/21/2004APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 9/20/2004 at 11:52:24 AM. Contact: ###-####. ok after fire life saftey sign off 9/21/2004 10:18:55 AM
BLD-Framing/Rough-in8/30/20048/30/20048/30/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 8/30/2004 at 11:09:15 AM. Contact: ###-####.
Inspection Record Card- Bld  8/13/2004 DONE
Permit Ready to Issue  8/13/2004 DONE
Telephone call  8/13/2004 DONE
left a message for Tim -- permit is ready.
Issue PAID IN FULL permit  8/13/2004 DONE
Plan assigned to (CJW)8/3/20048/3/20048/12/2004 PASS
8/12/2004 13:50:50 CJW - activity updated through activity BLDA022 from case BLD04-01722.
Routing - FIRE8/9/2004 8/12/2004 PASS
Plan Review Completed(1st rev)  8/12/2004 PASS
Routing - PLAN CHECK8/12/2004 8/12/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  8/12/2004 DONE
Routing - PLAN CHECK7/29/2004 8/9/2004 PASS
IBC plan review started August 6, 2004 and was finished August 9, 2004. The drawings were approved with clarifications. See the plan review report.
Application received  7/29/2004  
Recd Pcfee & Taken To Pln CK  7/29/2004 DONE
Fee Review-notes7/29/20047/29/2004