Permit Information
Permit NumberBLD04-01724
StatusExpired
Name ELDORADO DEVELOPMENT
Site Address 6671 W MORRIS HILL LN
Project NameWEXBURG VILLAGE SUB DUPLEX
Customer Number 
ePlanReviewNo
Description
To construct a new 3,010 sq.ft. two story, duplex. Each unit is 1505 sq.ft two bedroom and one and one-half baths, the second floor is 740 sq.ft the first floor is 475 sq.ft. with an attached 290 sq.ft. single car garage. All construction per the approved plans and attached comment list. MJP CUP 03-0080 DRH 04-00006
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/28/200512/28/200512/28/2005 CANC
DetailsTom Arcoraci
DOC - Permit Expired12/28/200512/28/200512/28/2005PPASS
DetailsTom Arcoraci
BLD-Aging Inspection10/24/200510/24/200510/24/2005 CANC
DetailsTom Arcoraci
BLD-Aging Inspection8/24/20058/24/20058/24/2005 NR
DetailsTom Arcoraci
on temp
BLD-Aging Inspection6/22/20056/22/20056/22/2005 CANC
DetailsTom Arcoraci
on temp
Temporary occupancy  1/31/2005 DONE
Temp. Occ. Cert. # 5202 issued 1-31-05 to Wexburg Village.
BLD-Final1/27/20051/27/20051/27/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/27/2005 at 11:13:47 AM. Contact: ###-####.
Inspection Record Card- Bld  1/13/2005 DONE
BLD-Framing/Rough-in1/6/20051/6/20051/6/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/6/2005 at 7:13:14 AM. Contact: ###-####.
BLD-Energy code compliance1/6/20051/6/20051/6/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/6/2005 at 9:49:42 AM. Contact: ###-####.
BLD-Framing/Rough-in1/4/20051/5/20051/5/2005ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/4/2005 at 5:16:21 PM. Contact: ###-####.
BLD-Energy code compliance1/4/20051/5/20051/5/2005PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/4/2005 at 5:17:03 PM. Contact: ###-####.
BLD-Foundation10/14/200410/15/200410/15/2004PPASS
DetailsTom Arcoraci
Ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Foundation10/13/200410/14/200410/14/2004APASS
DetailsTom Arcoraci
###-#### - steve
Inspection Record Card- Bld  10/13/2004 DONE
Permit Ready to Issue  10/13/2004  
Telephone call  10/13/2004 DONE
left mess with bob unger that permit is ready
Issue PAID IN FULL permit  10/13/2004 DONE
Plan assigned to (M_P)8/26/20048/26/200410/8/2004 PASS
10/8/2004 16:36:25 M_P - activity updated through activity BLDA022 from case BLD04-01724.
Routing - PLAN CHECK9/21/2004 10/8/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/8/2004 DONE
Print Pending Permit.LaserJet4  10/8/2004 DONE
Case Summary (BLD)  10/8/2004 DONE
Plan resubmittals received  9/24/2004 DONE
Received Transmittal Letter, & Sheets S3 , A3 Taken to Mike P..
Plan resubmittals received  9/22/2004 DONE
Received 2 United Water Sheets , 2 Copys of Master Plan Sheet # 1 Taken to Mike Phillips...
Plan resubmittals received  9/22/2004 DONE
Received United Water flow sheet and two 5/6 sheets taken to Mike P.
Routing - PLAN CHECK9/15/2004 9/21/2004 FAIL
Waiting for new REScheck compliance statement that passes.
Routing - PLANNING Land Div9/16/2004 9/16/2004 PASS
Lot 17 Wexburg Village
Routing - PLANNING9/10/2004 9/14/2004 PASS
Approved per CUP03-80 and DRH04-6.
Routing - PLAN CHECK8/26/2004 9/10/2004  
Routing to Planning
Plan resubmittals received  9/10/2004 DONE
Received response letter with plan review report, two S1 sheets for duplex.Taken to Mike P.
Plan resubmittals received  9/9/2004 DONE
Received Transmittal Letter, & 1 Set of A4,A6,A9,A11, & 1 Set of A4,A6,,A9 Taken to Mike Phillips
Plan resubmittals received  9/9/2004 DONE
Received Transmittal Letter, & 2 Sets of A2,S3,6/6 Taken to Mike Phillips....
Plan Review Completed(1st rev)  8/26/2004 FAIL
Additional information required for further review.
Routing - PLAN CHECK8/19/2004 8/26/2004 FAIL
Plan review completed, sent correction report to developer requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING8/17/2004 8/19/2004 FAIL
Landscape plan does not comply with DRH04-9, condition of approval #1c. Please note south yard does not indicate tree planting in accordance with the condition.

Failed applicant failed to comply with conditions of approval (CUP03-00080) as noted.

1.The applicant shall provide a minimum of five (5) handicap accessible parking spaces of which three (3) shall be van accessible.

3. The applicant shall provide a minimum of six (6) bicycle parking spaces.
Routing - Erosion and Sediment8/16/2004 8/17/2004 PASS
ESC approved with attached conditions.
Routing - PUBLIC WORKS8/11/2004 8/16/2004 PASS
Routing - PLANNING Land Div8/4/2004 8/10/2004 FAIL
Do not issue building permit until Plat is recorded.
Plans ACCEPTED BY PLAN TECH  8/4/2004 DONE
Mike Phillips will contact Architect about RES Check & MEC...
Plan routing begun/NEW & ADDTN  8/4/2004  
Application received  7/29/2004