Permit Information
Permit NumberBLD04-01729
StatusFinaled
Name RUSSELL CORPORATION
Site Address 8854 W EMERALD ST
Project NameW BOISE PROF COMPLEX
Customer Number 
ePlanReviewNo
Description
(HEALTHSOUTH SLEEP CENTER LAB)(W BOISE PROF COMPLEX) To construct a 3,851sq.ft. medical office with 4 sleep rooms per approved plans work to include, construction of accessible restrooms, one accessible shower stall, interior partitions, installation of a rated door and side lite in an existing corridor, construction of a medical gas closet and related piping, installation or miscelaneous counters and cabinets in exam rooms and nurses station. Miscelaneous related finishes throughout tenat space. This building is fully fire sprinklered any alterations or modifications to the sprinkler sytem shall be per NFPA #13 as regulated by the fire department. Rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 12/23/20044/26/2005 DONE
Permanent Occupancy 12/23/200412/23/2004 DONE
Details
BLD-Final12/22/200412/23/200412/23/2004APASS
DetailsLane Manuel
Don, ###-####

perm c of o ok 12/23/2004 11:20:03 AM
Permanent occupancy  12/23/2004 DONE
Perm. Occ. Cert. # 10397 issued 12-23-04 to Healthsouth Sleep Center Lab.
BLD-Final12/21/200412/22/200412/22/2004APART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/21/2004 at 11:36:50 AM. Contact: ###-####.
temp c of o ok.

need ada signage, and wrap copper lavatory lines 12/22/2004 10:27:00 AM
FIRE-Final Inspection12/16/200412/17/200412/17/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled 12/17/2004 3:54:46 PM
BLD-Other12/3/200412/6/200412/6/2004AFAIL
DetailsTroy James
Scheduled by a contractor via Hello! on 12/3/2004 at 1:15:16 PM. Contact: ###-####. need seismic pods in two large rooms, ok to lay tile, leave ceiling exposed at location for reinspection. 12/6/2004 9:28:18 AM
BLD-Framing/Rough-in10/28/200410/28/200410/28/2004APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/28/2004 at 6:23:18 AM. Contact: ###-####. ok pending all othr inspectors 10/28/2004 10:11:19 AM
FIRE-Conference10/25/200410/25/200410/25/2004ADONE
DetailsTroy Cobbley
I found backboxes and conduit installed on this project for the fire alarm system. I posted a stop work order for the installation of the fire alarm system and the installation of sheet rock (which will cover the conduit and backboxes). I don't know at this time who started to install the fire alarm system.
Issue PAID IN FULL permit  9/29/2004 DONE
Inspection Record Card- Bld  9/10/2004 DONE
Print Occupancy Form  9/10/2004 DONE
Permit Ready to Issue  9/10/2004 DONE
Telephone call  9/10/2004 DONE
permit ready and fee due
(F) Reprint permit  9/10/2004 DONE
Plan resubmittals received  9/9/2004 DONE
Received Transmittal Letter, & 2 sets of A-3,E2.1L Taken to Ron Hill....
PLANS/APPL TAKEN TO FRONT DESK  9/9/2004 DONE
Routing - PLAN CHECK9/9/2004 9/9/2004 PASS
Plan assigned to (R_H)8/5/2004 9/9/2004 PASS
9/9/2004 13:28:53 RMH - activity updated through activity BLDA022 from case BLD04-01729.
Routing - FIRE8/31/2004 9/3/2004 PASS
approved with conditions and annotations.
Plan Review Completed(1st rev)  9/3/2004 FAIL
failed plan check
Routing - PLAN CHECK8/25/2004 8/31/2004 FAIL
Routing - PLUMBING8/18/2004 8/25/2004 PASS
building needs premise backflow protection, water heater will require thermol expantion protection, make up water to chilled water will need r.p.. min. standards for the level 3 med gas system will be NFPA99 2002 edition.
Routing - PUBLIC WORKS8/5/2004 8/18/2004 PASS
Plan resubmittals received  8/9/2004 DONE
Received Transmittal Letter, & 3 Sets of A-1,A-2,A-2.1,A3.1,A-4 ...Taken to Ron Hill...
Plan Reviewer's activity  8/5/2004 DONE
Marty Santoyo said there are not issues with zoning for a sleep center.
Plans ACCEPTED BY PLAN TECH  8/4/2004 DONE
Application received  7/29/2004  
Recd Pcfee & Taken To Pln CK  7/29/2004 DONE
Fee Review-notes7/29/20047/29/2004