Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/6/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/20/2005 | 9/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/26/2005 | 9/20/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 3/17/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10488 issued 3-17-05 to the Wexburg Village Apts.
|
Permanent Occupancy | | 3/16/2005 | 3/16/2005 | | DONE |
|
|
|
|
Temporary occupancy | | | 1/21/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5195 issued 1-21-05 to Wexburg Village.
|
BLD-Final | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 11:32:55 AM. Contact: ###-####. ok when others sign perm 1/20/2005 9:16:05 AM
|
FIRE-Final Inspection | 1/19/2005 | 1/19/2005 | 1/19/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers, apartment numbers and fix the two smoke detectors that did not operate in the north and south apartments 1/19/2005 9:59:31 AM
|
FIRE-Final Inspection | 1/19/2005 | 1/19/2005 | 1/19/2005 | P | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled 1/19/2005 1:57:57 PM
|
BLD-Energy code compliance | 12/28/2004 | 12/28/2004 | 12/28/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/28/2004 at 9:46:45 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/17/2004 | 12/17/2004 | 12/17/2004 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 12/17/2004 at 7:26:53 AM. Contact: ###-####. needs to have eng explain where 2nd story shear panels belong and what they are 12/17/2004 10:39:00 AM
|
BLD-Foundation | 10/26/2004 | 10/26/2004 | 10/26/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/26/2004 at 9:59:15 AM. Contact: ###-####.
|
BLD-Footing | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 8:48:02 AM. Contact: ###-####. 10/25/2004 10:10:27 AM
|
Permit Ready to Issue | | | 10/19/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/19/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/19/2004 | | DONE |
|
|
|
Spoke with Bob Unger and told him that permit is ready & fees///10/19/04 11:45am BAS
|
Issue PAID IN FULL permit | | | 10/19/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 8/4/2004 | 8/4/2004 | 10/15/2004 | | PASS |
|
|
|
10/15/2004 16:40:28 M_P - activity updated through activity BLDA022 from case BLD04-01731.
|
Routing - PLAN CHECK | 10/11/2004 | | 10/15/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/15/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 10/15/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/15/2004 | | DONE |
|
|
|
|
Routing - FIRE | 10/6/2004 | | 10/11/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/7/2004 | | DONE |
|
|
|
Received Transmittal Letter, 3 Booklets of Structural Calcs, & 3 Copys of of Sheets S3,S7 Taken to Mike Phillips.
|
Routing - PLAN CHECK | 10/5/2004 | | 10/6/2004 | | |
|
|
|
Routing to fire for review.
|
Routing - PLAN CHECK | 9/24/2004 | | 10/5/2004 | | FAIL |
|
|
|
Waiting for new plans to be submitted, reflecting chenge in sesign professional and engineer.
Set up meeting with Bob Unger, He is getting architect, engineer and Steve White to come in to discuss the project.
|
Plan resubmittals received | | | 9/28/2004 | | DONE |
|
|
|
Received Rescheck complicance,2 copies of structural calculations, six copies of sheet A2, two sets of sheets A1,A4,A6,A7,A9,A10,A11,S3,S5,S6,S7,S8,S9,E1,M1,P1,P2, taken to Mike P.
|
Plan Reviewer's activity | | | 9/24/2004 | | |
|
|
|
Gave two copies of the structural calculations to Reese Leavitt, retained one copy for our records. Reese said he will be faxing and providing an original letter stating he is not the StructuralEngineer of Record.
|
Plan resubmittals received | | | 9/24/2004 | | |
|
|
|
Received Transmittal Letter & Sheets 6,A1,A9 Taken to Mike Phillips..
|
Routing - FIRE | 9/23/2004 | | 9/24/2004 | | |
|
|
|
Removed from fire pending submittal of new plans.
|
Routing - PLAN CHECK | 9/23/2004 | | 9/23/2004 | | FAIL |
|
|
|
Second review failed sent correction report to owner requesting additional information be submitted for further review. Routing to Fire.
|
Plan resubmittals received | | | 9/22/2004 | | DONE |
|
|
|
Received 2 United Water Sheets , 2 Copys of Master Plan Sheet # 1 Taken to Mike Phillips...
|
Routing - PLAN CHECK | 9/15/2004 | | 9/15/2004 | | |
|
|
|
Routing to Land Division
|
Routing - PLANNING Land Div | 9/15/2004 | | 9/15/2004 | | PASS |
|
|
|
Lot 6 Wexburg Village
|
Routing - PLANNING | 9/10/2004 | | 9/14/2004 | | PASS |
|
|
|
Approved per CUP03-80 and DRH04-6.
|
Plan Review Completed(1st rev) | | | 9/10/2004 | | FAIL |
|
|
|
failed planning Land div, planning, plan check and fire
|
Routing - FIRE | 9/3/2004 | | 9/10/2004 | | FAIL |
|
|
|
lacks hyd location and flow.
|
Print Pending Permit.LaserJet4 | | | 9/3/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 8/25/2004 | | 9/3/2004 | | FAIL |
|
|
|
Plan review complete, sent correction report to contractor requesting additional information be submitted for further review, prior to issuing permit.
|
Routing - PLANNING | 8/25/2004 | | 8/25/2004 | | FAIL |
|
|
|
Landscape plan does not comply with DRH04-9, condition of approval #1c. Please note south yard does not indicate tree planting in accordance with the condition.
Failed applicant failed to comply with conditions of approval (CUP03-00080) as noted.
1.The applicant shall provide a minimum of five (5) handicap accessible parking spaces of which three (3) shall be van accessible.
3. The applicant shall provide a minimum of six (6) bicycle parking spaces.
|
Routing - PLUMBING | 8/17/2004 | | 8/25/2004 | | PASS |
|
|
|
see bld04-01727
|
Routing - Erosion and Sediment | 8/16/2004 | | 8/17/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/11/2004 | | 8/16/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/4/2004 | | 8/10/2004 | | FAIL |
|
|
|
Do not issue building permit until Final Plat of Wexburg is recorded.
|
Plan routing begun/NEW & ADDTN | | | 8/4/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/4/2004 | | DONE |
|
|
|
Mike Phillips will contact Architect about RES Check & MEC...
|
Application received | | | 7/30/2004 | | |
|
|
|
|