Permit Information
Permit NumberBLD04-01732
StatusFinaled
Name ELDORADO DEVELOPMENT
Site Address 6720 W MORRIS HILL LN
Project NameWEXBURG VILLAGE SUB 4 PLEX
Customer Number 
ePlanReviewNo
Description
(Lot 7) To construct a new 3,804 sq.ft. two story, four unit apartment building, each unit is two bedroom and has a separate entry and is two stories. The Type "A" unit has two full bathrooms and is 989 sq.ft. the Type "B" unit one and one half bathrooms and is 913 sq.ft. All construction per the approved plans and attached comment list. MJP DRH 04-0006 CUP 03-00080.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/6/2005 DONE
Second Notice has not been responded to.
Second Notice BLD9/20/20059/20/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 4/26/20059/20/2005 DONE
Permanent occupancy  3/17/2005 DONE
Perm. Occ. Cert. # 10490 issued 3-17-05 to the Wexburg Village Apts.
Permanent Occupancy 3/16/20053/16/2005 DONE
Details
Temporary occupancy  1/25/2005 DONE
Temp. Occ. Cert. # 5198 issued 1-25-05 to Wexburg Village.
FIRE-Final Inspection1/20/20051/21/20051/21/2005APASS
DetailsTroy Cobbley
Fire life safety finaled 1/21/2005 10:45:28 AM
BLD-Final1/20/20051/21/20051/21/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/20/2005 at 6:28:12 PM. Contact: ###-####. ok for perm when others sign perm 1/21/2005 2:32:38 PM
BLD-Framing/Rough-in1/11/20051/11/20051/11/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/11/2005 at 11:21:25 AM. Contact: ###-####.
BLD-Energy code compliance1/1/20051/3/20051/3/2005PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/1/2005 at 12:57:12 PM. Contact: ###-####.
BLD-Framing/Rough-in12/29/200412/30/200412/30/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 12/29/2004 at 6:20:21 PM. Contact: ###-####.
BLD-Foundation10/28/200410/28/200410/28/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/28/2004 at 10:28:33 AM. Contact: ###-####.
BLD-Footing10/27/200410/27/200410/27/2004PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/27/2004 at 10:24:27 AM. Contact: ###-####.
BLD-Footing10/26/200410/26/200410/26/2004PCANC
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 10/26/2004 at 10:16:04 AM. Contact: ###-####.
Permit Ready to Issue  10/19/2004 DONE
Inspection Record Card- Bld  10/19/2004 DONE
Print Occupancy Form  10/19/2004 DONE
Telephone call  10/19/2004 DONE
Spoke with Bob Unger and told him that permit is ready & fees///10/19/04 11:45am BAS
Issue PAID IN FULL permit  10/19/2004 DONE
Routing - PLAN CHECK10/11/2004 10/15/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/15/2004 DONE
Print Pending Permit.LaserJet4  10/15/2004 DONE
Case Summary (BLD)  10/15/2004 DONE
Plan assigned to (M_P)8/2/2004 10/15/2004 PASS
10/15/2004 16:42:31 M_P - activity updated through activity BLDA022 from case BLD04-01732.
Routing - FIRE10/6/2004 10/11/2004 PASS
Plan resubmittals received  10/7/2004 DONE
Received Transmittal Letter, 3 Booklets of Structural Calcs, & 3 Copys of of Sheets S3,S7 Taken to Mike Phillips.
Routing - PLAN CHECK10/5/2004 10/6/2004  
Routing to fire for review.
Routing - PLAN CHECK9/24/2004 10/5/2004 FAIL
Waiting for new plans to be submitted, reflecting chenge in sesign professional and engineer.
Set up meeting with Bob Unger, He is getting architect, engineer and Steve White to come in to discuss the project.
Plan resubmittals received  9/28/2004 DONE
Received Rescheck complicance,2 copies of structural calculations, six copies of sheet A2, two sets of sheets A1,A4,A6,A7,A9,A10,A11,S3,S5,S6,S7,S8,S9,E1,M1,P1,P2, taken to Mike P.
Plan Reviewer's activity  9/24/2004  
Gave two copies of the structural calculations to Reese Leavitt, retained one copy for our records. Reese said he will be faxing and providing an original letter stating he is not the StructuralEngineer of Record.
Plan resubmittals received  9/24/2004  
Received Transmittal Letter & Sheets 6,A1,A9 Taken to Mike Phillips..
Routing - FIRE9/23/2004 9/24/2004  
Removed from fire pending submittal of new plans.
Routing - PLAN CHECK9/23/2004 9/23/2004 FAIL
Second review failed sent correction report to owner requesting additional information be submitted for further review. Routing to Fire.
Plan resubmittals received  9/22/2004 DONE
Received 2 United Water Sheets , 2 Copys of Master Plan Sheet # 1 Taken to Mike Phillips...
Routing - PLAN CHECK9/15/2004 9/15/2004  
Routing to Land Division
Routing - PLANNING Land Div9/15/2004 9/15/2004 PASS
Lot 7 Wexburg Village
Routing - PLANNING9/10/2004 9/14/2004 PASS
Approved per CUP03-80 and DRH04-6.
Plan Review Completed(1st rev)  9/10/2004 FAIL
failed planning Land div, planning, plan check and fire
Routing - FIRE9/3/2004 9/10/2004 FAIL
lacks hydrant flow and location.
Routing - PLAN CHECK8/25/2004 9/3/2004 FAIL
Plan review complete, sent correction report to contractor requesting additional information be submitted for further review, prior to issuing permit.
Print Pending Permit.LaserJet4  9/3/2004  
Routing - PLUMBING8/17/2004 8/25/2004 PASS
see notes bld04-01727
Routing - PLANNING  8/25/2004 FAIL
Landscape plan does not comply with DRH04-9, condition of approval #1c. Please note south yard does not indicate tree planting in accordance with the condition.

Failed applicant failed to comply with conditions of approval (CUP03-00080) as noted.

1.The applicant shall provide a minimum of five (5) handicap accessible parking spaces of which three (3) shall be van accessible.

3. The applicant shall provide a minimum of six (6) bicycle parking spaces.
Routing - Erosion and Sediment8/16/2004 8/17/2004 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS8/13/2004 8/16/2004 PASS
Routing - PLANNING Land Div8/4/2004 8/10/2004 FAIL
Do not issue building permit until Final Plat of Wexburg is recorded.
Plans ACCEPTED BY PLAN TECH  8/4/2004 DONE
Mike Phillips will contact Architect about RES Check & MEC...
Plan routing begun/NEW & ADDTN  8/4/2004  
Application received  7/30/2004  
Recd Pcfee & Taken To Pln CK  7/30/2004 DONE
Fee Review-notes7/30/20047/30/2004