Third Notice BLD | 12/6/2005 | 12/6/2005 | 3/15/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/14/2005 | 9/14/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/11/2005 | 9/14/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/11/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10661 issued 7-11-05 to Looks Unlimited.
|
BLD-Final | 6/21/2005 | 6/22/2005 | 6/22/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 6/21/2005 at 11:35:38 AM. Contact: ###-####. ok for perm occ
|
Permanent Occupancy | | 6/22/2005 | 6/22/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | 6/17/2005 | 6/17/2005 | 6/17/2005 | P | PASS |
Dena Gambrel
|
|
|
Pass Final Occupancy. Bike rack is in and posts removed. Bond can be released.
|
FIRE-Final Inspection | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | CANC |
Forrest France
|
|
|
Duplicate inspection, not required.
|
Temporary occupancy | | | 4/13/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5230 issued 4-13-05 to Looks Unlimited.
|
FIRE-Final Inspection | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled, HVAC units shut down properly as required.
|
FIRE-Final Inspection | 4/11/2005 | 4/12/2005 | 4/12/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection, HVAC units did not shut down immediately upon smoke test.
|
FIRE-Final Inspection | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | FAIL |
Troy Cobbley
|
|
|
Duct smoke detectors are not wired for immediate shutdown of the hvac units. Need to rewire and retest.
|
BLD-Final | 4/8/2005 | 4/11/2005 | 4/11/2005 | P | PART |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 4:28:36 PM. Contact: ###-####. cn posted ok for temp occ 4/11/2005 4:25:11 PM 4/11/2005 4:25:35 PM
|
BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 5:23:56 PM. Contact: ###-####.
|
FIRE-Final Inspection | 4/6/2005 | 4/7/2005 | 4/7/2005 | P | FAIL |
Forrest France
|
|
|
Remove thumbturn from south exit, provide approved hardware on the pocket door on the restroom, provide duct smoke detectors on the two hvac units
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 9:28:59 AM. Contact: ###-####. ok to cover all but stairs to basement 2/16/2005 10:02:13 AM
|
BLD-Footing | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - corwin
|
Override - Parcel Holds | | | 12/20/2004 | | |
|
|
|
|
Plan resubmittals received | | | 12/8/2004 | | DONE |
|
|
|
Received 3 sets P1,P2,P2.1, taken to Jason B
|
Override - Parcel Holds | 1/1/1900 | 1/1/1900 | 12/3/2004 | | |
|
|
|
|
BLD-Concrete | 12/1/2004 | 12/1/2004 | 12/1/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 8:08:29 AM. Contact: ###-####.
Doing new footing work in phases.
Intermittent sections ok. To recall for other sections when ready for insp. 12/1/2004 12:38:30 PM
|
Issue PAID IN FULL permit | | | 11/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/23/2004 | | DONE |
|
|
|
left mess fir sheryl yochum at ###-#### that permit is ready
|
Routing - PLUMBING | 11/17/2004 | | 11/18/2004 | | PASS |
|
|
|
approved per letter from architect. Architect will submit plumbing plan as a re-submittal to the plumbing division by november 26th.
|
Routing - PLAN CHECK | 11/18/2004 | | 11/18/2004 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/18/2004 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 11/18/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/18/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/18/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/18/2004 | | DONE |
|
|
|
talked to sheryl yochum that permit is ready
|
Plan assigned to (JCB) | 8/6/2004 | | 11/18/2004 | | PASS |
|
|
|
11/18/2004 10:26:47 JCB - activity updated through activity BLDA022 from case BLD04-01752.
|
Routing - PLAN CHECK | 11/12/2004 | | 11/17/2004 | | PEND |
|
|
|
Pending Plumbing approval. Plumbing plan will be a deferred submittal. Plans to route to Plumbing for approval.
|
Routing - PLAN CHECK | 11/9/2004 | | 11/12/2004 | | PEND |
|
|
|
Pending Planning and Plumbing approval. Plans to route to Marty in Planning.
|
Routing - PLANNING | 11/12/2004 | | 11/12/2004 | | PASS |
|
|
|
Approved per DRH04-15.
|
Routing - PLUMBING | 11/8/2004 | | 11/9/2004 | | FAIL |
|
|
|
please provide a plumbing plan showing the above listed items
|
Routing - PLANNING | 11/4/2004 | | 11/8/2004 | | FAIL |
|
|
|
Parking requirements not met. Left phone message with applicant. DRH03-15.
|
Routing - PUBLIC WORKS | 11/2/2004 | | 11/4/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/4/2004 | | DONE |
|
|
|
Received 2 Floor rating system sheets, 2 sealed calcs for the floor joist & columns, & 3 Structural Calcs Taken to Jason B.
|
Routing - PLAN CHECK | 10/21/2004 | | 11/2/2004 | | FAIL |
|
|
|
A few items still need to be addressed. Called architect discussing issues. He said he would address and provide additional information. Plans to route to Public Works, Planning, and Plumbing for review with new use (hair salon/day spa) and new plumbing fixtures.
|
Telephone call | | | 11/1/2004 | | |
|
|
|
Called architect concerning some missing structural calculations and clarification of some bearing points for new headers. He said he would address and provide the information.
|
Plan resubmittals received | | | 10/28/2004 | | DONE |
|
|
|
Received Transmittal Letter , & 2 Copys of sheets A0.1,A2.1,A4.0 Taken to Jason B.
|
Telephone call | | | 10/21/2004 | | DONE |
|
|
|
Spoke to Dana Kauffman (architect) for the project. He informed me that the 1st floor and 2nd floor will be hair salon. The basement will be massage therapy and manicure/pedicure. Plans are to be redrawn and resubmitted by architect to accurately depict what the building is to be used for along with all new plumbing fixtures to be installed. Do not route to PW and Planning until plans have been resubmitted. (MSouthard)
|
Routing - PLAN CHECK | 9/21/2004 | | 10/21/2004 | | HOLD |
|
|
|
Use of structure has changed. Plans need to be resubmitted to accurately depict what is to happen. See full notes under "telephone call" on 10/21/2004. (MSouthard)
|
Plan resubmittals received | | | 10/15/2004 | | DONE |
|
|
|
Received response letter with two sets of sheets A1.0,A2.1,A3.0,A4.0,M1.0,M2.0, taken to Jason
|
Routing - FIRE | 9/13/2004 | | 9/21/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/21/2004 | | FAIL |
|
|
|
failed plan check
|
Plan resubmittals requested | | | 9/13/2004 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Routing - PLAN CHECK | 8/27/2004 | | 9/13/2004 | | FAIL |
|
|
|
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
|
Routing - PLANNING | 8/25/2004 | | 8/27/2004 | | PASS |
|
|
|
Approved.
|
Routing - PLUMBING | 8/17/2004 | | 8/25/2004 | | PASS |
|
|
|
1. need premise backflow and expansion protection 2. water heaters may need pans with drains and t&p drains to approved locations 3. building sewer needs to be 4 inch from inside foundation to street and building must meet cross sectional area venting
|
Routing - Erosion and Sediment | 8/16/2004 | | 8/17/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 8/11/2004 | | 8/16/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/4/2004 | | 8/10/2004 | | PASS |
|
|
|
Approved one-time lot split of Lot 15 of Baker Subdivision.
|
Plans ACCEPTED BY PLAN TECH | | | 8/4/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/4/2004 | | DONE |
|
|
|
|
Application received | | | 8/2/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/2/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/2/2004 | 8/2/2004 | | | |
|
|
|
|