Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01771
StatusFinaled
Name BOISE CITY BUILDING CO
Site Address 813 W IOWA ST
Project NameBrooklyn Place
Customer Number 
ePlanReviewNo
Description
To construct a new 1,325 sq.ft.two bedroom, two and half bathroom two story townhome on a zero lot line (630 sq. ft. first floor/695 sq. ft. second floor with a detached 242 sq. ft. one car garage. Per approved plans and comment list. CAA 04-0006 MJP PC # 658
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/18/20054/18/20054/18/2005PPASS
DetailsTom Arcoraci
nate; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
DOC - Permit Finaled4/18/20054/18/20054/18/2005PPASS
DetailsTom Arcoraci
Finaled by inspector at 4/18/2005 2:17:21 PM
BLD-Framing/Rough-in3/10/20053/11/20053/11/2005APASS
DetailsJim Storey
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Energy code compliance3/3/20053/3/20053/3/2005PPASS
DetailsJim Storey
nate; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need fire wall nail insp. 3/3/2005 3:28:21 PM
BLD-Framing/Rough-in3/2/20053/2/20053/2/2005PPASS
DetailsJim Storey
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in2/23/20052/23/20052/23/2005PNR
DetailsJim Storey
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in2/8/20052/8/20052/8/2005PPART
DetailsDave Hannah
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice fire wall for garage ok to stand 2/8/2005 1:06:39 PM
BLD-Framing/Rough-in2/2/20052/3/20052/3/2005APASS
DetailsJim Storey
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in1/27/20051/28/20051/28/2005PPART
DetailsJim Storey
###-#### - nate fire wall ok 1/28/2005 1:53:25 PM
BLD-Foundation1/27/20051/28/20051/28/2005APASS
DetailsJim Sly
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice
FIRE-Conference1/27/20051/28/20051/27/2005PCANC
DetailsRick Jackson
Nate; Phone #: ###-#### Internet Inspection Request from: Jan Rice Note: wrong inspection
BLD-Footing1/25/20051/26/20051/26/2005APASS
DetailsJim Storey
NAT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Foundation1/10/20051/10/20051/10/2005PPASS
DetailsAlan Hauser
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing1/6/20051/7/20051/7/2005APART
DetailsJim Storey
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  12/9/2004 DONE
Telephone call  12/3/2004 DONE
called secretary that permit and fees are ready to be picked up - cmc
Plan assigned to (M_P)8/3/20048/3/200412/2/2004 PASS
12/2/2004 08:40:55 M_P - activity updated through activity BLDA022 from case BLD04-01771.
Routing - PLANNING11/30/2004 12/2/2004 PASS
Routing - PLAN CHECK11/30/2004 12/2/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/2/2004 DONE
Case Summary (BLD)  12/2/2004 DONE
Inspection Record Card- Bld  12/2/2004 DONE
Permit Ready to Issue  12/2/2004 DONE
Routing - PLAN CHECK11/29/2004 11/30/2004  
Routed to Scott Spjute to review roof changes to the front of the buildings.
Routing - FIRE11/19/2004 11/29/2004 PASS
Resubmittal acceptable.
Routing - PLAN CHECK10/22/2004 11/19/2004  
Routing to fire.
Plan resubmittals received  11/15/2004 DONE
2 new complete set of plans resubmitted and forwarded to Mike Phillips. No additional information provided on fire issues.
Telephone call  11/15/2004 DONE
received from Richard Beck at request of David Hale, ###-####, three different sub reviews by D Miller all of which indicate no hyd's were shown and 1-2 will probably be needed. I called David Hale, he says there are existing hyd's which DM approved. I indicated the hydrant locations need to be shown on bldg plans and we need current UW letter verifying available fire flows. He is apparently trying to provide this info himself rather than thru the architect; he said he'd come in tomorrow with the UW info and mark hydrants on our plan sets.
Routing - FIRE10/20/2004 10/22/2004 FAIL
No fire related information resubmitted. Refaxed comments to architect.
Routing - PLAN CHECK10/18/2004 10/20/2004 FAIL
Second review failed, called David Hale and left message for him to call m. Need REScheck report for single family and multi-family, need to cut back roofs at property lines, need to remove roof over hangs within two feet of property lines, one hour walls must be continuous to roof decks on the inside and out sides of walls. Talked to architect he said he will be in.
Routing - PLANNING Land Div10/15/2004 10/18/2004 PASS
Lot 1, Block 2 of Brooklyn Place
Routing - PLAN CHECK9/17/2004 10/15/2004 HOLD
Route to Land Div.
Routing - FIRE9/10/2004 9/17/2004 FAIL
lacks hydrant location and flow info. faxed review to applicant.
Plan Review Completed(1st rev)  9/17/2004 FAIL
failed panning, planning land div., plan check and fire.
Routing - PLAN CHECK8/26/2004 9/10/2004 FAIL
Plan review completed, sent correction report to owner requesting additional information be submitted for further review prior to issuing permit.
Routing - PLANNING Land Div8/26/2004 8/26/2004 FAIL
Must record final plat of Brooklyn Place.
Routing - PUBLIC WORKS8/24/2004 8/24/2004 PASS
Routing - PLANNING8/24/2004 8/24/2004 PASS
Routing - PLANNING8/3/2004 8/4/2004 FAIL
Applicant failed to meet condition 2 of CAA04-00006 Conditions of Approval. Plans located in fail drawer.
Application received  8/3/2004