Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-01806
StatusFinaled
Name TRUAX COMPANY
Site Address 907 N 29TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"1/31/2005 THIS PERMIT IS MODIFIED TO REFLECT THAT THE GARAGE WILL NOT BE CONSTRUCTED BUT THE MINIMUM REQUIRED 19'-0" X 22'-0" PAVED PARKING PAD WILL BE PLACED AT SAME LOCATION. 1/31/2005" PEP To build a new 988slfl 2-story single famly dwelling with 424s.f. on each level and a 418s.f. detached garage at the rear. "THE PERMIT HOLDER IS RESPONSIBLE TO COMPLY WITH CURRENT WALL BRACING REQUIREMENTS AS ADOPTED BY BOISE CITY" R-3D setbacks ok per daa land division and Carl Miller planning per CVA04-00014. Upper bedroom window to be moved to the rear. All per the approved plans as marked, attached REScheck and plan review notes. PC#458 pep
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/1/20052/1/20052/1/2005APASS
DetailsTroy James
DOC - Permit Finaled2/1/20052/1/20052/1/2005APASS
DetailsTroy James
Finaled by inspector at 2/1/2005 9:43:57 AM
Case Summary (BLD)  1/31/2005  
BLD-Final1/27/20051/27/20051/27/2005PFAIL
DetailsTroy James
Justin; Phone #: ###-#### Internet Inspection Request from: Jan Rice permit shows garage to be built, need to build garage 1/27/2005 3:25:07 PM
BLD-Energy code compliance12/21/200412/21/200412/21/2004PPASS
DetailsDave Hannah
Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in12/20/200412/20/200412/20/2004PPASS
DetailsTony Young
Justin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Foundation9/14/20049/15/20049/15/2004APASS
DetailsDave Hannah
manual; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Footing9/14/20049/14/20049/14/2004PPASS
DetailsDave Hannah
justin- ###-####
Issue PAID IN FULL permit  9/14/2004 DONE
Permit Ready to Issue  9/10/2004 DONE
Telephone call  9/10/2004 DONE
called and talked to Robert that is permit is ready and the fee
Plan assigned to (PEP)9/8/2004 9/9/2004 PASS
9/9/2004 13:25:01 PEP - activity updated through activity BLDA022 from case BLD04-01806.
Plan Review Report  9/9/2004  
Case Summary (BLD)  9/9/2004  
PLANS/APPL TAKEN TO FRONT DESK  9/9/2004 DONE
Inspection Record Card- Bld  9/9/2004 DONE
Pending Assignment by DJO8/5/2004 9/8/2004 DONE
9/8/2004 13:01:26 PEP - activity updated through activity BLDA176 from case BLD04-01806.
Routing - PLANNING8/9/2004 9/1/2004 PASS
Routed to Carl Miller per CVA04-00014.
Bedroom #1 on 2nd floor should have window facing rear yard.
Routing - PUBLIC WORKS9/1/2004 9/1/2004 PASS
Routing - PLANNING Land Div8/6/2004 8/9/2004 PASS
Lot 7, Block 13 of Frank Davis Addition.
Application received  8/5/2004  
Routing - PLAN CHECK9/1/2004