Case Summary (BLD) | | | 6/21/2006 | | |
|
|
|
|
BLD-Final | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
DOC - Permit Finaled | 4/27/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Storey
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 4/25/2005 | 4/26/2005 | 4/26/2005 | P | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 4/25/2005 at 4:28:58 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/4/2005 | 2/7/2005 | 2/7/2005 | A | PASS |
Jim Storey
|
|
|
sheet rock/shear inspection please///brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore gyp sheer ok for cover.
|
BLD-Energy code compliance | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 4:50:50 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 1:35:35 PM. Contact: ###-####. all c/n items completed ok to insulate 1/25/2005 8:52:47 AM
|
BLD-Framing/Rough-in | 1/19/2005 | 1/20/2005 | 1/20/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 4:34:51 PM. Contact: ###-####. c/n posted 1/20/2005 4:41:29 PM
|
BLD-Footing | 11/5/2004 | 11/8/2004 | 11/8/2004 | A | PASS |
Jim Storey
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Jan Rice east half ok. 11/8/2004 8:42:03 AM
|
BLD-Footing | 11/4/2004 | 11/5/2004 | 11/5/2004 | A | CANC |
Jim Storey
|
|
|
Eric; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Foundation | 10/29/2004 | 11/1/2004 | 11/1/2004 | A | PASS |
Jim Storey
|
|
|
Eric-; Phone #: ###-#### Internet Inspection Request from: Jan Rice basement tar aplied ok for back fill. 11/1/2004 10:44:43 AM
|
BLD-Foundation | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 9:42:28 AM. Contact: ###-####.
|
BLD-Footing | 10/15/2004 | 10/18/2004 | 10/18/2004 | A | PART |
Jim Storey
|
|
|
ERIC; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles basment ft ok 10/18/2004 9:45:35 AM
|
Issue PAID IN FULL permit | | | 10/8/2004 | | |
|
|
|
|
Plan assigned to (SAM) | 8/17/2004 | | 8/30/2004 | | PASS |
|
|
|
8/30/2004 11:42:35 SAM - activity updated through activity BLDA022 from case BLD04-01824.
|
Case Summary (BLD) | | | 8/30/2004 | | |
|
|
|
|
Plan Review Report | | | 8/30/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/30/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/26/2004 | | 8/30/2004 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 8/30/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/30/2004 | | DONE |
|
|
|
|
Telephone call | | | 8/30/2004 | | DONE |
|
|
|
PERMIT READY AND FEE DUE
|
Pending Assignment by DJO | 8/9/2004 | | 8/18/2004 | | DONE |
|
|
|
8/17/2004 08:14:08 SAM - activity updated through activity BLDA183 from case BLD04-01824.
|
Routing - PLAN CHECK | 8/11/2004 | | 8/17/2004 | | FAIL |
|
|
|
|
Plan Reviewer's activity | | | 8/17/2004 | | DONE |
|
|
|
14:55 I talked to Bryan with Doug Lasher Construction. I let him know that I need header sizes for the basement windows, lateral and gravity engineering for the tall walls and shear nailing schedule. Plans are on hold.
|
Routing - PUBLIC WORKS | 8/10/2004 | | 8/11/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 8/10/2004 | | 8/10/2004 | | PASS |
|
|
|
O.K. per revised site plan which moved circular driveway out of the front setback.
|
Routing - PLANNING | 8/9/2004 | | 8/9/2004 | | FAIL |
|
|
|
Driveway exceeds 33' wide in front setback. Spoke w/ Bryan Murdock requesting new/revised site plan. CER-11:00 a.m. on 8/9/04.
|
Application received | | | 8/9/2004 | | |
|
|
|
|