Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/16/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 9/14/2005 | 9/14/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/8/2005 | 9/14/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/8/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10660 issued 7-8-05 to the J. Crist Gallery.
|
BLD-Final | 7/5/2005 | 7/6/2005 | 7/6/2005 | A | PASS |
Dave Hannah
|
|
|
mark ###-#### ok for perm occ
|
Permanent Occupancy | | 7/6/2005 | 7/6/2005 | | DONE |
|
|
|
|
BLD-Final | 6/28/2005 | 6/28/2005 | 6/29/2005 | P | FAIL |
Dave Hannah
|
|
|
mark vangulik needs hand rail mens restroom grabbar
|
Code Occupancy Approval | 6/20/2005 | 6/20/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
|
Code Occupancy Approval | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
inspection complete - officer satisfied with landscaping and parking
|
DOC - Permit Finaled | 6/22/2005 | 6/22/2005 | 6/22/2005 | P | PASS |
Michael Garner
|
|
|
|
BLD-Final | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | PART |
Troy James
|
|
|
temp. occ. , need grab bar at mens and reinstall soff at front door 4/13/2005 3:05:54 PM
|
Temporary occupancy | | | 4/13/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5231 issued 4-13-05 to the J. Crist Gallery.
|
BLD-Final | 4/12/2005 | 4/12/2005 | 4/12/2005 | P | FAIL |
Troy James
|
|
|
mark; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
grab bar in restroom and signage, need bond for exterior landscape 4/12/2005 4:33:30 PM
|
FIRE-Final Inspection | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 4/6/2005 | 4/6/2005 | 4/6/2005 | P | FAIL |
Forrest France
|
|
|
Still need duct detectors to be provided/tested on the two hvac units
|
FIRE-Final Inspection | 4/4/2005 | 4/4/2005 | 4/5/2005 | P | FAIL |
Troy Cobbley
|
|
|
Mount fire extinguishers, Provide ada approved hardware on the pocket door and provide duct smoke detectors per approved drawings and test
|
FIRE-Final Inspection | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | FAIL |
Forrest France
|
|
|
Contact: (###-####) Fail inspection per items defficient including; Provide max occupant load sign, mount address, repair exit discharge light at door #2 and #3, test all emergency lights, provide exit discharge lighting at door #7.
|
BLD-Final | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 7:56:32 AM. Contact: ###-####.
|
BLD-Wall cover | 12/27/2004 | 12/28/2004 | 12/28/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/27/2004 at 5:08:01 PM. Contact: ###-####.ok to cover insulated and hold downs installed 12/28/2004 9:56:24 AM
|
BLD-Energy code compliance | 12/20/2004 | 12/22/2004 | 12/22/2004 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 5:00:06 PM. Contact: ###-####.seal package ok to insulate 12/22/2004 12:44:05 PM
|
BLD-Wall cover | 12/20/2004 | 12/22/2004 | 12/22/2004 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 5:00:47 PM. Contact: ###-####. not insulated 12/22/2004 12:44:27 PM
|
BLD-Framing/Rough-in | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/20/2004 at 4:59:18 PM. Contact: ###-####. ok to start insulating needs to install two replacment hold downs 12/21/2004 10:00:24 AM
|
CHANGE STATUS TO (ISS) | | | 11/22/2004 | | |
|
|
|
|
(F) Reprint permit | | | 11/22/2004 | | |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 11/17/2004 | | DONE |
|
|
|
for a plan modification -will change back to issued status when they pickup
|
Inspection Record Card- Bld | | | 11/17/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2004 | | DONE |
|
|
|
let mess with dwane carver at ###-#### that permit is ready
|
Plan assigned to (MLO) | 10/25/2004 | 10/25/2004 | 11/15/2004 | | PASS |
|
|
|
11/15/2004 11:06:00 MLO - activity updated through activity BLDA022 from case BLD04-01880.
|
Routing Off Site - STRUCTURAL | 10/28/2004 | | 11/15/2004 | | PASS |
|
|
|
Contacted PDQ to take supplemental calcs. of 10/28/04 and resubmitted plans to outside engineering. kmm
|
Routing - PLAN CHECK | 11/1/2004 | | 11/15/2004 | | PASS |
|
|
|
waiting for structural approval 11/1 Structural Review Passed 11/15
|
Case Summary (BLD) | | | 11/15/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/15/2004 | | DONE |
|
|
|
|
Routing - FIRE | 10/27/2004 | | 11/1/2004 | | PASS |
|
|
|
Review comments revised to reflect modifications.
|
Plan resubmittals received | | | 10/28/2004 | | DONE |
|
|
|
Received two copies of supplemental structural calculations. Routed to Mike O. kmm
|
Routing - PLAN CHECK | 10/25/2004 | | 10/27/2004 | | PEND |
|
|
|
no structural calculations provided for changes. architect contacted MLO
|
Routing - PLANNING | 10/27/2004 | | 10/27/2004 | | PASS |
|
|
|
Approved per building plans, and as noted on sheet A4.1.
|
CHANGE STATUS TO (REV) | | | 10/25/2004 | | DONE |
|
|
|
Plan Mod. accepted.
|
Plan Modification Accepted | | | 10/25/2004 | | DONE |
|
|
|
Plan Modification excepted for bld04-01880 for the redesign of additional exit added to gallery, fire sprinkler and sprinkler riser room removed, one toilet removed from women's room on sheets C1,A1.0,A2.1,A4.1,A5.1,A6.1,S0.1,S1.0S2.0,S3.0,S4.1,S4.2,S5.1,E1.0,E2F,E2T,E2P,E2L,E2L1,E3,M0,M1,P1,P2,P3 Routed to Mike Otto.
|
BLD-Foundation | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 7:44:29 AM. Contact: ###-####.
|
BLD-Footing | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 4:23:19 PM. Contact: ###-####.
|
(F) Reprint permit | | | 9/27/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 9/24/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/24/2004 | | |
|
|
|
|
Print Occupancy Form | | | 9/24/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/24/2004 | | DONE |
|
|
|
left mess for steve trout at ###-#### that permit is ready
|
Issue PAID IN FULL permit | | | 9/24/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/23/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 8/16/2004 | | 9/23/2004 | | PASS |
|
|
|
9/23/2004 14:57:38 MLO - activity updated through activity BLDA022 from case BLD04-01880.
|
Routing - PLANNING Land Div | 9/22/2004 | | 9/22/2004 | | PASS |
|
|
|
Parcels have been combined into one parcel.
|
Routing - FIRE | 9/20/2004 | | 9/21/2004 | | PASS |
|
|
|
resubmittal acceptable
|
Routing - PLAN CHECK | 9/17/2004 | | 9/20/2004 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/17/2004 | | 9/20/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 9/16/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Booklets Structural calcs,2 Legacy report booklets, 2 Sets of COVER SHEET,C-1,L1.0,A5.1,A2.1,S0.1,S0.2,S0.3,S1.0,S2.0,S3.0,S4.0,S4.1,S4.2,S5.0,S5.1,E2L,M4, & EXTRA S1.0,S2.0,S3.0,S4.0,S4.1,S4.2,S5.0,S5.1, & S0.1,S0.2,S0.3 Taken to Mike Otto.... @ 5:00 PM
|
Routing - FIRE | 9/2/2004 | | 9/3/2004 | | FAIL |
|
|
|
lacks fire hydrant, fire flow, sprinkler flow, sprinkler piping and valve locations, 2nd exit sign. Review faxed to architect.
|
Plan Review Completed(1st rev) | | | 9/3/2004 | | FAIL |
|
|
|
failed Planning Land, structural, plan check and fire.
|
Routing - PLAN CHECK | 9/3/2004 | | 9/3/2004 | | |
|
|
|
hold for resubs
|
Routing Off Site - STRUCTURAL | 8/16/2004 | | 9/2/2004 | | FAIL |
|
|
|
Contacted PDQ for outside delivery to engineering.
|
Plan resubmittals requested | | | 9/2/2004 | | DONE |
|
|
|
IBC structural and non-structural items
|
Routing - PLAN CHECK | 9/1/2004 | | 9/2/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 8/31/2004 | | 9/1/2004 | | PASS |
|
|
|
Approved per DRH04-149 and as noted on sheet L1.0 & A-4.1.
|
Routing - PLUMBING | 8/26/2004 | | 8/26/2004 | | PASS |
|
|
|
approved per plan and 2003 upc
|
Routing - PUBLIC WORKS | 8/18/2004 | | 8/26/2004 | | PASS |
|
|
|
Address changed from 1713 W. Front St. to 1723 S. 17th St.
|
Routing - Erosion and Sediment | 8/26/2004 | | 8/26/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 8/16/2004 | | 8/17/2004 | | FAIL |
|
|
|
Need new deed and new tax parcel #. Talked to Dwaine Carver at Trout Architects on 8/16/04 at ###-####.
|
Plans ACCEPTED BY PLAN TECH | | | 8/16/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/16/2004 | | DONE |
|
|
|
|
Application received | | | 8/13/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/13/2004 | | |
|
|
|
|
Fee Review-notes | 8/13/2004 | 8/13/2004 | | | |
|
|
|
|