Third Notice BLD | 1/29/2009 | 1/29/2009 | 1/30/2009 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 1/2/2009 | 1/2/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 12/3/2008 | 12/3/2008 | 1/2/2009 | | DONE |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 12/3/2008 | 12/3/2008 | 12/3/2008 | | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 12/3/2008 | 12/3/2008 | 12/3/2008 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/15/2008 | 8/15/2008 | 8/15/2008 | P | PASS |
Dave Hannah
|
|
|
randy Phone #: ###-#### ok for perm occ
|
BLD-Aging Inspection | 8/14/2008 | 8/14/2008 | 8/15/2008 | | PASS |
Dave Hannah
|
|
|
|
BLD-Aging Inspection | 2/1/2008 | 2/1/2008 | 2/4/2008 | P | PASS |
Forrest France
|
|
|
Okay for final.
|
BLD-Aging Inspection | 1/29/2008 | 1/29/2008 | 2/1/2008 | | DEFR |
Dave Hannah
|
|
|
sent to fire
|
BLD-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/15/2007 | | DEFR |
Dave Hannah
|
|
|
|
BLD-Final | 4/11/2006 | 4/12/2006 | 4/17/2006 | A | DONE |
Forrest France
|
|
|
wip, pending alarm and sprinkler permit finals.
|
Plan resubmittals received | | | 5/27/2005 | | |
|
|
|
Received (2) copies of sheet A0.1 and A2.2. Routed to Carl W.
|
BLD-Final | 5/19/2005 | 5/20/2005 | 5/23/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/19/2005 at 12:14:56 PM. Contact: ###-####. ok to occ ground level
|
FIRE-Alarm Testing | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | CANC |
Forrest France
|
|
|
Cancel per. Dave, the general contractor. Duplicate inspection.
|
FIRE-Final Inspection | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Forrest France
|
|
|
Fail inspection due to several issues, all of which are indicated on the correction notice. Some items are; install fire ext. in basement and 2nd floors, provide suite address, verify door hardware not yet installed, provide approved hardware on teller d
|
Plan resubmittals received | | | 5/20/2005 | | |
|
|
|
Received (2) copies of sheet A0.1, A2.0, A2.1, A2.2 and A3.0. Routed to Carl W.
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy Cobbley
|
|
|
Temp occupancy is ok for the second floor tenant area only. Area just south of the new lobby is unfinished. Door security items are in the process of being added to two doors. Their operation will need to be verified prior to finaling. Emergency lighting
|
FIRE-Final Inspection | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given for the second floor. The fire alarm system passed in the finished areas. The area to the south of the new lobby is unfinished and will require a separate FIR permit if not finished by the time the building is finaled
|
BLD-Final | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 11:44:24 AM. Contact: ###-####. ok to occ the second floor 4/22/2005 1:59:58 PM
|
BLD-Final | 4/21/2005 | 4/22/2005 | 4/22/2005 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/21/2005 at 11:44:24 AM. Contact: ###-####.
|
BLD-Other | 4/19/2005 | 4/19/2005 | 4/19/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/19/2005 at 9:05:26 AM. Contact: ###-####.
|
BLD-Other | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 7:38:42 AM. Contact: ###-####.ceiling grid ok to cover 4/11/2005 2:58:49 PM
|
BLD-Framing/Rough-in | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 9:08:10 AM. Contact: ###-####. ceiling grid prim wires not 1 in 6 4/8/2005 1:21:30 PM
|
BLD-Other | 4/1/2005 | 4/1/2005 | 4/1/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 8:13:01 AM. Contact: ###-####. ceiling grid ok 4/1/2005 1:19:31 PM
|
FIRE-Conference | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | DONE |
Troy Cobbley
|
|
|
For temporary occupancy for the 6th floor I need a letter stating full functionability of the emergency lighting system, two emergency lights added on the sixth floor, signage in the stairs, a barrier at ground level landing to keep people from continuing to the basement, fire extinguisher for the first floor main lobby and sprinkler protection in the mechanical closet on the first floor.
|
BLD-Conference | 2/17/2005 | 2/18/2005 | 2/18/2005 | A | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 4:01:22 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 4:17:50 PM. Contact: ###-####. ok to cover walls only at first floor teller area and second level framing if all trades have approved cover. Need bracing at existing office area walls. 2/16/2005 10:20:33 AM 2/16/2005 10:22:07 AM
|
BLD-Conference | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | DONE |
Troy James
|
|
|
contractor wanted to know if they need to protect existing steel beams at third level roof assembly. I talked to Carl and he said that the existing beams need to be protected. I informed Dave with Kincaid that he needs to protect the beams. 2/16/2005 3:06:13 PM 2/16/2005 3:06:45 PM
|
BLD-Aging Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | PASS |
Dave Hannah
|
|
|
work in progress 12/21/2004 9:33:48 AM
|
Issue PAID IN FULL permit | | | 9/21/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2004 | | DONE |
|
|
|
Spoke with Maria and told her that permit is ready & fees///9/17/04 8:15am BAS
|
Routing - PLAN CHECK | 9/3/2004 | | 9/16/2004 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/16/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 8/17/2004 | | 9/16/2004 | | PASS |
|
|
|
9/16/2004 12:29:26 CJW - activity updated through activity BLDA022 from case BLD04-01885.
|
Plan resubmittals received | | | 9/13/2004 | | DONE |
|
|
|
Received letter of transmittal with plan review response letter and two sets of sheets A0.1,A2.2,A3.0,taken to Carl W.
|
Routing - FIRE | 8/31/2004 | | 9/3/2004 | | PASS |
|
|
|
|
Plan Review Completed(1st rev) | | | 9/3/2004 | | FAIL |
|
|
|
failed Plan check
|
Routing - PLAN CHECK | 8/20/2004 | | 8/31/2004 | | |
|
|
|
Failed 1st IBC plan review. IBC plan review started August 30, 2004 and finished the next day. A revision to the drawings was required. See the plan review report.
|
Routing - PUBLIC WORKS | 8/17/2004 | | 8/20/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/17/2004 | | DONE |
|
|
|
|
Application received | | | 8/13/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/13/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/13/2004 | 8/13/2004 | | | |
|
|
|
|