Third Notice BLD | 12/6/2005 | 12/6/2005 | 10/20/2006 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/25/2005 | 7/13/2005 | | DONE |
|
|
|
|
BLD-Final | 5/24/2005 | 5/25/2005 | 5/25/2005 | A | PASS |
Dave Hannah
|
|
|
harry; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for perm occ
|
Permanent Occupancy | | 5/25/2005 | 5/25/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 5/25/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10596 issued 5-25-05 to the Bledsoe Group.
|
FIRE-Final Inspection | 5/23/2005 | 5/24/2005 | 5/24/2005 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 4/18/2005 | 4/19/2005 | 4/19/2005 | P | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 4/18/2005 at 3:35:02 PM. Contact: ###-####. need fire approval 4/19/2005 1:44:15 PM
|
BLD-Final | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire alarm and fire sprinkler modifications.
|
FIRE-Final Inspection | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire sprinkler modifications in spray booth and compressor room.
|
FIRE-Alarm Testing | 4/19/2005 | 4/19/2005 | 4/19/2005 | A | PART |
Forrest France
|
|
|
Temp. occupancy given per. Dave Lokker, pending fire alarm modifications to include addition of three tamper switches and one flow switch addressed to 2990 Wise Way.
|
BLD-Conference | 3/15/2005 | 3/16/2005 | 3/16/2005 | A | CANC |
Troy James
|
|
|
Steven; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
FIRE-Final Inspection | 3/16/2005 | 3/16/2005 | 3/16/2005 | P | FAIL |
Troy Cobbley
|
|
|
Need to complete items 2, 3 and 4 on the correction notice. This includes fire alarm and fire sprinkler permits. Also need approved door hardware on doors in the office and repair the emergency light in the office corridor. 3/16/2005 4:52:14 PM
|
BLD-Final | 3/9/2005 | 3/10/2005 | 3/10/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 9:53:47 AM. Contact: ###-####. need fire life and electrical final approval 3/10/2005 10:23:37 AM
|
FIRE-Final Inspection | 3/9/2005 | 3/10/2005 | 3/9/2005 | A | CANC |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 9:45:18 AM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Mar 9 2005 9:50AM.
|
FIRE-Final Inspection | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | FAIL |
Troy Cobbley
|
|
|
See correction notice for items remaining. They include fire alarm and fire sprinkler permits for work to be done. 3/9/2005 12:39:26 PM
|
BLD-Final | 1/3/2005 | 1/3/2005 | 1/3/2005 | P | FAIL |
Troy James
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need all trades signed off final 1/3/2005 3:03:13 PM
|
BLD-Framing/Rough-in | 12/20/2004 | 12/21/2004 | 12/21/2004 | A | CANC |
Dave Hannah
|
|
|
ceiling grid inspection please///steven; Phone #: ###-#### Internet Inspection Request from: Barbara Moore out of time 12/21/2004 11:54:58 AM
|
BLD-Framing/Rough-in | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PART |
Dave Hannah
|
|
|
ceiling grid inspection please///steven; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Conference | 11/19/2004 | 11/19/2004 | 11/19/2004 | A | PART |
Rick Jackson
|
|
|
Met with owner after meeting with Sam Rogers - the paint booth shall comply with IFC 1504, the PIV and anti-freeze comtrol valves aren't supervised and a flow switch shall be installed on riser and monitored at FACP in Shakespeare as the fire pump is monitored at this panel, sprinkler plans needed for addition of heads under overhead doors and to replace heads near unit heaters, remove deadbolts at man doors in shop area, need extinguishers, sprinkler system requires annual inspection, left correction notice on front window 11/19/2004 11:09:16 AM
|
BLD-Framing/Rough-in | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | PART |
Troy James
|
|
|
steve cole ###-#### for cover inspection please
ok to cover walls, need to have ceiling engineered at restroom in wharehouse for 30 gallon water heater. 11/3/2004 9:34:19 AM
|
(F) Reprint permit | | | 11/2/2004 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/2/2004 | | DONE |
|
|
|
Re-issue permit from plan modification///11/02/04 BAS
|
BLD-Framing/Rough-in | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | CANC |
Troy James
|
|
|
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM
|
BLD-Framing/Rough-in | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | CANC |
Troy James
|
|
|
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM
|
BLD-Framing/Rough-in | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | CANC |
Troy James
|
|
|
steven ###-#### Not ready need trades rough approval. 10/18/2004 1:33:11 PM
|
Override - Parcel Holds | | | 10/18/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 10/1/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/1/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2004 | | DONE |
|
|
|
left mess for chad slichter at ###-#### is ready
|
Override - Parcel Holds | | | 10/1/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 10/1/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/27/2004 | | 9/29/2004 | | PASS |
|
|
|
Ron Hill
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/29/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 9/29/2004 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/27/2004 | | DONE |
|
|
|
Plan Modification accecpted for BLD04-01896 for the redesign of addinging (2) urinals to the Mens restroom and increase restroom size. On sheetA2.1 . Routed to Public Works & Ron Hill .
|
Routing - PUBLIC WORKS | 9/27/2004 | | 9/27/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/22/2004 | | 9/22/2004 | | FAIL |
|
|
|
ESC plan waiver request approved but no rp on application, contractor has been identified. Informed architect, Chad. Will process when rp information is faxed.
|
Override - Parcel Holds | | | 9/20/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 9/20/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/17/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/17/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 9/17/2004 | | DONE |
|
|
|
|
Override - Parcel Holds | | | 9/17/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 9/17/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/17/2004 | | DONE |
|
|
|
left a message with the Bledsoe group -- permit is ready.
|
Routing - PLAN CHECK | 9/13/2004 | | 9/15/2004 | | PASS |
|
|
|
|
Plan assigned to (R_H) | 8/19/2004 | | 9/15/2004 | | PASS |
|
|
|
9/15/2004 14:13:12 RMH - activity updated through activity BLDA022 from case BLD04-01896.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/15/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
Received ESC application with waiver request and two sets of plan sheets A0.1,DR-1,A1.1,A2.0,A2.1,A3.1,A7.1,A8.1,taken to Ron Hill
|
Routing - PLANNING | 9/8/2004 | | 9/13/2004 | | PASS |
|
|
|
Sara Signed off on plans.
|
Plan Review Completed(1st rev) | | | 9/13/2004 | | PASS |
|
|
|
|
Routing - FIRE | 9/8/2004 | | 9/13/2004 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 9/8/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 8/23/2004 | | 9/8/2004 | | PEND |
|
|
|
|
Routing - PLANNING | 8/23/2004 | | 8/24/2004 | | FAIL |
|
|
|
Needs DR Zoning Certificatre see Sara Schafer
|
Routing - PUBLIC WORKS | 8/19/2004 | | 8/23/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/18/2004 | | DONE |
|
|
|
No Mechanical Compliance
|
Application received | | | 8/17/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/17/2004 | | |
|
|
|
|
Fee Review-notes | 8/17/2004 | 8/17/2004 | | | |
|
|
|
|