Permit Information
Permit NumberBLD04-01909
StatusFinaled
Name TRINITY PRESBYTERIAN CHURCH
Site Address 4601 S SURPRISE WAY
Project NameTRINITY PRESBYTERIAN CHURCH
Customer Number 
ePlanReviewNo
Description
To construct a 28,556 sq. ft. one story Type IIIB fully fire sprinklered church building. Other work includes all site improvements, paving and landscaping per approved plans and attachments. Fire sprinklers are used for area. A two hour fire barrier wall will provide for two separate fire areas for fire alarm purposes only. This building will also house a Group I-4 daycare for 118 children which will have a separate certificate of occupancy issued under MIS04-00274 .
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD9/29/20059/29/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 9/14/20059/29/2005 DONE
BLD-Final9/13/20059/14/20059/14/2005APASS
DetailsJim Storey
bill ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok
Permanent occupancy  9/14/2005  
Perm. Occ. Cert. # 10720 issued 9-14-05 to Trinity Presbyterian Church.
FIRE-Final Inspection9/12/20059/13/20059/13/2005APASS
DetailsForrest France
ADA hardware at the previously noted locations has been installed, fire life safety finaled.
Permanent Occupancy 9/12/20059/12/2005 DONE
Details
FIRE-Final Inspection9/7/20059/8/20059/8/2005APART
DetailsForrest France
All fire life safety issues are satisfactory except for two doors, one at the mechanical room and one at an exterior storage room, which have non ADA approved hardware. Per Ken the GC the parts are on order and an inspection will be called in when installed, a temporary occupancy has been approved.
BLD-Final9/1/20059/2/20059/2/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/1/2005 at 3:29:07 PM. Contact: ###-####.temp ok final pending fire.
Code Occupancy Approval9/1/20059/1/20059/2/2005PPASS
DetailsDena Gambrel
FIRE-Final Inspection9/1/20059/2/20059/2/2005APART
DetailsForrest France
Temporary occupancy approved with Sam Rogers permission pending completion of permanent dual phone lines for final of fire alarm permit. Life safety approved when fire alarm, door hardware, emergency light, and one exit sign are repaired as discussed.
FIRE-Final Inspection8/31/20059/1/20059/1/2005AFAIL
DetailsForrest France
Emergency lighting and exit signs in some locations failed to operate, provide building address at Surprise Way, provide covers and keys for knox boxes, install missing door hardware.
BLD-Final8/31/20058/31/20058/31/2005PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/31/2005 at 11:14:24 AM. Contact: ###-####. fire stop wall behind stage right/adjudest fire doors w/cordenators/instal ada sink pootection/missing two panic bars at exits of chapal// recieved si ok
PubWorks Occupancy Approval8/25/20058/25/20058/25/2005 DONE
Drainage project complete, signed permanent occupancy 8/25/05. G.Fitts
BLD-Framing/Rough-in8/22/20058/23/20058/23/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/22/2005 at 3:52:09 PM. Contact: ###-####.
FIRE-Conference8/11/20058/11/20058/11/2005PDONE
DetailsTroy Cobbley
I marked up sheet C1.0 on the approved drawings in red for the curbing that needs to be painted to show the fire dept access routes.
BLD-Energy code compliance7/8/20057/11/20057/11/2005APASS
DetailsJim Storey
kim scags; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Framing/Rough-in7/1/20057/5/20057/5/2005APASS
DetailsJim Storey
ken; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa sanchuary soffit framing ok
BLD-Energy code compliance6/24/20056/27/20056/27/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/24/2005 at 1:06:17 PM. Contact: ###-####.c/n rfi not all areas are fured out to meet ec have arch address configuration on plan to complet envolpe.
BLD-Framing/Rough-in6/9/20056/10/20056/10/2005APASS
DetailsJim Storey
ken; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa kitchen ceilling ok/ storage floor and behind stage framing ok.
BLD-Framing/Rough-in5/25/20055/25/20055/25/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/25/2005 at 10:44:05 AM. Contact: ###-####.hard ciellings in wing b ok for cover.
BLD-Framing/Rough-in5/14/20055/16/20055/16/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/14/2005 at 9:00:03 AM. Contact: ###-####.over build at sancawary ok
BLD-Framing/Rough-in4/27/20054/28/20054/28/2005ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/27/2005 at 2:43:37 PM. Contact: ###-####.
BLD-Energy code compliance4/26/20054/27/20054/27/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/26/2005 at 5:03:35 PM. Contact: ###-####. all gyp walls ok area b
BLD-Framing/Rough-in4/22/20054/25/20054/25/2005APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/22/2005 at 3:29:47 PM. Contact: ###-####.east side of area b ok for interior framing.
BLD-Foundation12/20/200412/20/200412/20/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/20/2004 at 8:23:01 AM. Contact: ###-####. placed w/si 12/20/2004 4:12:25 PM
BLD-Foundation12/16/200412/17/200412/17/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/16/2004 at 3:48:03 PM. Contact: ###-####.pwsi. 12/17/2004 3:59:13 PM
BLD-Foundation12/15/200412/16/200412/16/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/15/2004 at 12:48:58 PM. Contact: ###-####. wip/psi 12/16/2004 10:00:29 AM
BLD-Footing12/13/200412/14/200412/14/2004APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/13/2004 at 9:00:09 AM. Contact: ###-####. ft on b ufer in place wip si pending. 12/14/2004 10:52:01 AM
BLD-Foundation12/8/200412/9/200412/9/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/8/2004 at 12:52:46 PM. Contact: ###-####.
MTI to provide special inspection/ take cylinder samples. 12/9/2004 3:48:22 PM
BLD-Foundation12/7/200412/8/200412/8/2004PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/7/2004 at 11:39:40 AM. Contact: ###-####.
BLD-Footing12/3/200412/6/200412/6/2004PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/3/2004 at 9:25:08 AM. Contact: ###-####.
BLD-Footing12/2/200412/3/200412/3/2004PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/2/2004 at 2:50:27 PM. Contact: ###-####.
BLD-Footing12/1/200412/2/200412/2/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/1/2004 at 12:30:16 PM. Contact: ###-####. crew is still working on placing rebar crew using cold weather protection MTI will be onsite to do rebar inspection and test concrete 12/2/2004 2:08:16 PM
BLD-Footing11/30/200412/1/200412/1/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/30/2004 at 3:05:59 PM. Contact: ###-####.
contractor not ready. MTI to be on site for insp. 12/1/2004 4:14:43 PM
BLD-Footing11/29/200411/30/200411/30/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2004 at 3:17:05 PM. Contact: ###-####.mti pending report. 11/30/2004 4:43:28 PM
BLD-Footing11/29/200411/30/200411/30/2004PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/29/2004 at 3:17:05 PM. Contact: ###-####. placed with mti pending report. 11/30/2004 4:41:15 PM
BLD-Footing11/23/200411/24/200411/24/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/23/2004 at 12:40:45 PM. Contact: ###-####.
partial footings ok. (see markings on plans)
MTI to provide reports. 11/24/2004 4:14:42 PM
BLD-Foundation10/23/200410/25/200410/25/2004ANR
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/23/2004 at 10:03:59 AM. Contact: ###-####.
(F) Reprint permit  10/21/2004  
Issue & PRINT permit  10/20/2004 DONE
Permit Ready to Issue  10/18/2004 DONE
Telephone call  10/18/2004 DONE
left mess for scott wendell at ###-#### achd fees due
Inspection Record Card- Bld  10/15/2004 DONE
Print Occupancy Form  10/15/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/14/2004 DONE
Plans taken to front desk to issue.
Plan assigned to (MLO)8/23/2004 10/14/2004 PASS
10/14/2004 07:52:30 MYS - activity updated through activity BLDA022 from case BLD04-01909.
Routing Off Site - STRUCTURAL9/30/2004 10/13/2004 PASS
Received approved review from outside engineer. MSouthard
Plan Reviewer's activity  10/8/2004 DONE
waiting for structural review contacted engineer and will not be done until 10/15. MLO
Routing - PLAN CHECK10/5/2004 10/7/2004 PASS
Routing - PUBLIC WORKS10/7/2004 10/7/2004 PASS
added plumbing fixture fees redone ok
Routing - PLUMBING10/7/2004 10/7/2004 PASS
added plumbing fixture
Plan resubmittals received  10/5/2004 DONE
Received letter of transmittal with, child care plan review and approval form, response letter, letter from ACHD, two sets of sheets A2.12,A2.14,A5.01,A4.02, one sets of sheets E3.1,E5.2 taken to Mike Otto.
Routing - PLANNING10/4/2004 10/5/2004 PASS
Routing - PLANNING9/3/2004 10/5/2004 PASS
The applicant is submitting a staff level modification as they revised the site plan and elevations. I will fast track the modification application once it is submitted.

Application submitted & approved. Appeal date over, can now approve. Submitted a modified landscape plan which has been inserted into the plans for building permit.
Plan resubmittals received  9/29/2004 DONE
Received letter of transmittal with two copies of supplemental structural calculations two sets of sheets S1.0,S2.1,S2.2,S3.2,S4.0,S5.0,S5.2, taken to Mike Otto.
Routing - PLAN CHECK9/27/2004 9/28/2004 PEND
resubs do not address all corrections. Will have changes to plumbing with added fixtures per CDH. Architect will provide revised sheets. MIS permit for day care CO still needs to be provided as modification approved for the incidental use separations. MLO
Plan resubmittals received  9/27/2004 DONE
Received 2 Trandsmittal Letters, & 2 Sets of C4.0,C5.0,A1.01,A2.01,A2.12,A2.30,A2.32,A3.01 & 1of the transmittal letters Taken to Mike Otto... The other transmittal letter went to Jenifer Gilliland....
Plan Review Completed(1st rev)  9/23/2004 FAIL
failed structural, ESC, Plan check and Planning.
Routing - PLAN CHECK9/23/2004 9/23/2004 PEND
Routing - FIRE9/17/2004 9/23/2004 PASS
Plan resubmittals received  9/22/2004 DONE
Steve Webb received response letter, two esc narratives, two esc plans taken to Mike Otto
Routing - Erosion and Sediment9/22/2004 9/22/2004 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK9/9/2004 9/17/2004 FAIL
corrections sent to architect Mike Otto
Routing Off Site - STRUCTURAL8/20/2004 9/17/2004 FAIL
CALLED PDQ FOR PICK-UP corrections sent to architect
Plan resubmittals requested  9/17/2004 DONE
IBC corrections
Plan resubmittals received  9/15/2004 DONE
2 - L1.0 sheet added to plan set by Susan Riggs
Routing - PLUMBING9/2/2004 9/3/2004 PASS
move grease interceptor vent downstream of discharge, use boise city approved grease interceptor detail, attached.
Routing - Erosion and Sediment9/1/2004 9/2/2004 FAIL
Does not meet requirements set forth in BCC 8-17, notified PD.
Routing - PUBLIC WORKS8/24/2004 9/1/2004 PASS
Plans ACCEPTED BY PLAN TECH  8/24/2004 DONE
Called Bud Fulleton with Central District Health Dept, to see if they needed to look at these plans, they do NOT need to see them. If any questions please give Bud a call ( office ###-#### cell ###-#### ) . This project requires CDH approval for the daycare and applicant has been sent back to CDH. MLO
Plan routing begun/NEW & ADDTN  8/24/2004  
Routing - PLANNING Land Div8/24/2004 8/24/2004 PASS
Site is over 5 acres in size.
Application received  8/18/2004  
Recd Pcfee & Taken To Pln CK  8/18/2004 DONE