BLD-Final | 9/15/2005 | 9/16/2005 | 9/16/2005 | P | PASS |
Mike Jordan
|
|
|
skip; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Recieved all required paper work.
|
DOC - Permit Finaled | 9/16/2005 | 9/16/2005 | 9/16/2005 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Grading Inspection | 9/15/2005 | 9/15/2005 | 9/15/2005 | | BOND |
|
|
|
Rough grading is complete. Fine grading, revegetation of the slope on the south side of the lot, and placement of a berm at the top of the slope on the west side of the lot are not complete. For this the engineer has recommended a $1,000.00 bond. Upon receipt of this bond the grading and drainage is conditionally approved
|
BLD-Energy code compliance | 4/27/2005 | 4/28/2005 | 4/28/2005 | P | PART |
Tony Young
|
|
|
skip- --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
need fireplace permit and inspections,,, ok to sheet rock un-affected areas 4/28/2005 12:30:12 PM
|
BLD-Energy code compliance | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | CANC |
Tony Young
|
|
|
skip- --call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 4/26/2005 12:31:26 PM
|
BLD-Framing/Rough-in | 4/25/2005 | 4/26/2005 | 4/26/2005 | A | PART |
Tony Young
|
|
|
skip- draft stops--call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 4/13/2005 | 4/13/2005 | 4/13/2005 | P | FAIL |
Troy James
|
|
|
###-#### - SKIP NOTE: please call 1/2 hr prior to inspection
need rough plumbing, drafstopping at duct chase, furred out walls in basement, energy seal done, approval from engineer on missing holddowns in basement exterior west wall, fireplace installed and inspected 4/13/2005 2:44:02 PM
|
BLD-Framing/Rough-in | 3/15/2005 | 3/16/2005 | 3/16/2005 | A | FAIL |
Troy James
|
|
|
Don-call before you go out ; Phone #: ###-#### Internet Inspection Request from: Jan Rice
need fix from designer for missed PHD22's at basement west wall, ok to cover exterior 3/16/2005 10:00:38 AM
|
BLD-Foundation | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | PART |
Tony Young
|
|
|
Brent; Phone #: ###-#### Internet Inspection Request from: Jan Rice
stem walls and columns 12/20/2004 11:25:39 AM
|
BLD-Footing | 12/13/2004 | 12/14/2004 | 12/14/2004 | A | PART |
Tony Young
|
|
|
brent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
upper ftgs, column ftgs, wing retaining wall ftgs,,, ok , pending confirmation of compaction papers from M. T. I. 12/14/2004 11:30:39 AM
|
BLD-Foundation | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | PASS |
Tony Young
|
|
|
Brent-around 11:00 if possible-Foundation basement wall; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Footing | 11/1/2004 | 11/1/2004 | 11/1/2004 | P | PART |
Tony Young
|
|
|
Skip ; Phone #: ###-#### Internet Inspection Request from: Jan Rice
wip 11/1/2004 2:28:18 PM
|
BLD-Grading Inspection | 10/27/2004 | 10/27/2004 | 10/27/2004 | | DONE |
|
|
|
Footing subgrade approved by the geotechnical engineer
|
Issue PAID IN FULL permit | | | 10/20/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2004 | | |
|
|
|
|
Case Summary (BLD) | | | 10/18/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/1/2004 | | |
|
|
|
Called builder about the address change. AEM 10/1/04
|
Inspection Record Card- Bld | | | 10/1/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/1/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/29/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/29/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 9/29/2004 | | DONE |
|
|
|
|
Telephone call | | | 9/29/2004 | | DONE |
|
|
|
talked to skip & left him that the permit and fees are ready to be picked up 9/29/2004
|
Plan assigned to (DJO) | 9/28/2004 | 9/28/2004 | 9/28/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 9/28/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 9/28/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 8/18/2004 | | 9/28/2004 | | DONE |
|
|
|
9/28/2004 11:55:19 DJO - activity updated through activity BLDA169 from case BLD04-01910.
|
Routing - PLAN CHECK | 9/24/2004 | | 9/28/2004 | | PASS |
|
|
|
Dan O.
|
Routing - PLANNING | 9/22/2004 | | 9/23/2004 | | PASS |
|
|
|
Approved as redlined.
|
Routing - Erosion and Sediment | 9/23/2004 | | 9/23/2004 | | PASS |
|
|
|
approved with attached conditions.
|
Routing - FIRE | 9/23/2004 | | 9/23/2004 | | PASS |
|
|
|
A 13D automatic fire sprinkler system is required for this house, based on FD access issues, per review by Fire Marshall.
|
Routing - PLANNING Land Div | 9/21/2004 | | 9/22/2004 | | PASS |
|
|
|
Parcel B on ROS 6469. Approved as one-time lot split.
|
Routing - PUBLIC WORKS GRADING | 9/21/2004 | | 9/21/2004 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS | 9/21/2004 | | 9/21/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/18/2004 | | 8/18/2004 | | FAIL |
|
|
|
Foundation plan and grading plan must be in same datum. eepage bed must be a minimum of ten feet from the property line, as required by geotech report. Frank Jones was told when plans were originally left in mid July and again in a phone message on 8/13.
|
Application received | | | 8/18/2004 | | |
|
|
|
|