BLD-Final | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/16/2005 at 7:03:18 AM. Contact: ###-####.
|
DOC - Permit Finaled | 6/16/2005 | 6/16/2005 | 6/16/2005 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 6/14/2005 | 6/14/2005 | 6/14/2005 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 6/14/2005 at 7:36:35 AM. Contact: ###-####. c/n posted
|
BLD-Grading Inspection | 6/8/2005 | 6/8/2005 | 6/8/2005 | | DONE |
|
|
|
Final grading and drainage approved.
|
BLD-Energy code compliance | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 10:30:42 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/3/2005 | 2/4/2005 | 2/4/2005 | A | CANC |
Troy James
|
|
|
dave-- ###-#### Disp set to [CANC] by a contractor via Hello! on Feb 4 2005 7:18AM.
|
BLD-Framing/Rough-in | 2/4/2005 | 2/4/2005 | 2/4/2005 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/4/2005 at 7:19:45 AM. Contact: ###-####.
|
BLD-Foundation | 12/8/2004 | 12/9/2004 | 12/9/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/8/2004 at 10:40:43 AM. Contact: ###-####.
walls ,,, wip 12/9/2004 3:39:03 PM
|
BLD-Foundation | 12/7/2004 | 12/8/2004 | 12/8/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 10:58:02 AM. Contact: ###-####.
|
BLD-Footing | 11/15/2004 | 11/16/2004 | 11/16/2004 | A | PART |
Tony Young
|
|
|
R J ###-####,, wip 11/16/2004 12:59:11 PM
|
BLD-Footing | 11/12/2004 | 11/15/2004 | 11/15/2004 | P | NR |
Tony Young
|
|
|
###-####
|
BLD-Grading Inspection | 11/12/2004 | 11/12/2004 | 11/12/2004 | | DONE |
|
|
|
Footing subgrade has been approved by the geotechnical engineer.
|
PubWorks Subgrade Approval | 10/18/2004 | 10/18/2004 | 11/12/2004 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling the footing inspection. Call Terry Records at ###-####
|
Telephone call | | | 11/9/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Telephone call | | | 11/9/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Activity Holds | | | 11/9/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 11/9/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 11/9/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/9/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/9/2004 | | |
|
|
|
|
Routing - PLANNING | 10/18/2004 | | 11/8/2004 | | PASS |
|
|
|
|
Pending Assignment by DJO | 8/19/2004 | | 11/8/2004 | | DONE |
|
|
|
11/8/2004 09:47:20 DJO - activity updated through activity BLDA169 from case BLD04-01924.
|
Plan Reviewer's activity | | | 11/8/2004 | | DONE |
|
|
|
received revised plans and calculations on 11/05/2004. will start review on 11/08/2004.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/8/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/8/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 11/8/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 11/8/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 11/8/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/3/2004 | | DONE |
|
|
|
10/27/2004 met with mark waldorf from ram-tech and went over marked plan set and engineered calculations which he took for revisions.
|
Plan assigned to (DJO) | 10/27/2004 | 10/27/2004 | 10/27/2004 | | FAIL |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 10/27/2004 | | FAIL |
|
|
|
|
Routing - PLANNING | 10/22/2004 | | 10/22/2004 | | PASS |
|
|
|
Do not issue until appeal period ends. See parcel hold.
|
Routing - Erosion and Sediment | 10/20/2004 | | 10/20/2004 | | PASS |
|
|
|
plan approved with attached conditions.
|
Routing - FIRE | 10/20/2004 | | 10/20/2004 | | PASS |
|
|
|
No fire sprinklers required (Eyrie Canyon #2 sub)
|
Routing - PUBLIC WORKS GRADING | 10/18/2004 | | 10/18/2004 | | PASS |
|
|
|
Approved as Category 1-CFH04-00030
|
Routing - PUBLIC WORKS | 10/18/2004 | | 10/18/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 8/23/2004 | | 8/24/2004 | | FAIL |
|
|
|
Grading needs commission level approval. Hearing tentatively scheduled for October.
|
Application received | | | 8/19/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 10/22/2004 | | | | |
|
|
|
|