Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/14/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///singed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 9/20/2005 | 9/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 7/5/2005 | 9/20/2005 | | DONE |
|
|
|
|
BLD-Final | 6/30/2005 | 7/5/2005 | 7/5/2005 | A | PASS |
Tom Arcoraci
|
|
|
joshsua; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for perm occ
|
Permanent Occupancy | | 7/5/2005 | 7/5/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 7/5/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10850 issued 7-5-05 to Richardson & O'Leary Law Offices.
|
BLD-Final | 6/22/2005 | 6/22/2005 | 6/23/2005 | P | FAIL |
Dave Hannah
|
|
|
nina; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ada ramp needs toe kick
|
Code Occupancy Approval | 6/9/2005 | 6/9/2005 | 6/9/2005 | P | PASS |
Michael Garner
|
|
|
|
FIRE-Final Inspection | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | PASS |
Rick Jackson
|
|
|
joshua; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 12/29/2004 | 12/30/2004 | 12/30/2004 | P | PART |
Dave Hannah
|
|
|
joshua; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp occ needs other traders sign off to perm also crew is finishing up hand rail need to check finished 12/30/2004 2:28:19 PM
|
BLD-Final | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | NR |
Dave Hannah
|
|
|
Joshua; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Final | 12/28/2004 | 12/29/2004 | 12/29/2004 | P | NR |
Dave Hannah
|
|
|
Joshua; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
FIRE-Final Inspection | 12/29/2004 | 12/29/2004 | 12/29/2004 | P | FAIL |
Rick Jackson
|
|
|
Joshua; Phone #: ###-#### Internet Inspection Request from: Jan Rice Need extinguisher with tags; door openable from the inside without special knowledge per plan review notes; sign above door 12/29/2004 1:47:32 PM
|
BLD-Framing/Rough-in | 12/17/2004 | 12/20/2004 | 12/20/2004 | A | PART |
Jim Storey
|
|
|
Joshua; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok pending plm. 12/20/2004 10:04:35 AM
|
Issue PAID IN FULL permit | | | 12/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/15/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/15/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 12/8/2004 | | 12/14/2004 | | PASS |
|
|
|
Rezone finaled on 12/13/2004.
Approved: 12-14-04 per DRH04-181.
|
Plan assigned to (CJW) | 8/27/2004 | | 12/14/2004 | | PASS |
|
|
|
12/14/2004 16:11:18 CJW - activity updated through activity BLDA022 from case BLD04-01937.
|
Plan resubmittals received | | | 12/9/2004 | | DONE |
|
|
|
Received two copies of revised sheets L1.1, A1.1 and two copies of small L1.1, A1.1. Sheet A1.1 is stamped but not signed. One letter of transmittal. Routed to Cw. kmm
|
Routing - PLAN CHECK | 12/7/2004 | | 12/8/2004 | | PASS |
|
|
|
Drawings approved after 2nd resubmittal review.
|
Routing - FIRE | 11/30/2004 | | 12/7/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Plan resubmittals received | | | 12/1/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets A3.0, A5.0 Taken to Carl W.
|
Routing - PLAN CHECK | 9/16/2004 | | 11/30/2004 | | FAIL |
|
|
|
Items #27 and #29 need to be resolved.
|
Plan resubmittals received | | | 11/24/2004 | | DONE |
|
|
|
Received Transmittal Letter, 1 United Water Sheet, 1 ESC Plan , 1 Drainage Calcs & 2 Sets of A0.0,A1.0,A1.1,A2.0,A3.0,A3.1,A4.0,A5.0, A6.0 Taken to Carl W.
|
Routing - PLAN CHECK | 9/15/2004 | | 9/16/2004 | | |
|
|
|
Sent back to ESC or resubmittal reveiw.
|
Routing - Erosion and Sediment | 9/16/2004 | | 9/16/2004 | | PASS |
|
|
|
ESC plan approved with attached conditons.
|
Routing - FIRE | 9/10/2004 | | 9/15/2004 | | FAIL |
|
|
|
lacks fire hyd flow and location info.
|
Plan Review Completed(1st rev) | | | 9/15/2004 | | FAIL |
|
|
|
failed planning land div, planning, plan check and fire.
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
Received transmittal letter with 2-ESC Narratives and 2- C-3 sheets taken to Carl W.
|
Routing - PLAN CHECK | 9/3/2004 | | 9/10/2004 | | FAIL |
|
|
|
Failed first IBC plan review. IBC plan review started September 10, 2004 and finished the same day. Resubmitted drawings were required from the architect. See the plan review report. A copy was E-mailed to the architect.
|
Routing - PLANNING | 9/3/2004 | | 9/3/2004 | | FAIL |
|
|
|
P & Z Entitlements-Design Review applications are pending.
Marty Santoyo DRH04-00181
Carl Miller CAR04-00029
|
Routing - Erosion and Sediment | 9/3/2004 | | 9/3/2004 | | FAIL |
|
|
|
ESC plan not per BCC 8-17. notified PD.
|
Routing - PUBLIC WORKS | 9/1/2004 | | 9/3/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 8/30/2004 | | 9/1/2004 | | PASS |
|
|
|
Block 2A of Citizens Right of Way and Lots 1 and 2 of Block 2 of West Side Subdivision. The three parcels have been combined into one parcel.
|
Plans ACCEPTED BY PLAN TECH | | | 8/25/2004 | | DONE |
|
|
|
No Registerd Design Sheet...
|
Application received | | | 8/23/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/23/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/23/2004 | 8/23/2004 | | | |
|
|
|
|