Permit Information
Permit NumberBLD04-01963
StatusFinaled
Name THORNTON-OLIVER KELLER
Site Address 3243 N COLE RD
Project NameCOLE VILLAGE
Customer Number 
ePlanReviewNo
Description
(ACE HARDWARE)(COLE VILLAGE SHOPPING CENTER) To remodel a 20,331 sq.ft. space for new retail tenant per approved plans. Work to include upgrade of existing restrooms for accessibility, new finishes, new storefront doors on front and two new roll up overhead doors on rear of building. Suspended ceiling, lighting an Hvac system is existing and will remain as is. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be per NFPA #13 as regulated by the fire department. (pc#555-04) rmh
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/19/2005 DONE
Second Notice has not been responded to.
Second Notice 5/20/200512/6/2005 DONE
Telephone call  11/16/2005 DONE
Left voice message for Todd w/ Primary Electric that I need to verify final value and or copy of contract due to final value discrepancies///11/16/05 BAS
Telephone call  10/21/2005 DONE
Left voice message for Mike Dahlberg that I discrepencies in final values and to please call me////10/21/05 BAS
First Notice 3/9/20054/26/2005 DONE
Print Occupancy Form  3/9/2005 DONE
Permanent occupancy  3/9/2005 DONE
Perm. Occ. Cert. # 10467 issued 3-9-05 to Ace Hardware in the Cole Village Shopping Center.
BLD-Final3/4/20053/7/20053/7/2005APASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/4/2005 at 3:16:19 PM. Contact: ###-####. OK for Perm Occ. :) 3/7/2005 10:39:58 AM
Permanent Occupancy 3/7/20053/7/2005 DONE
Details
BLD-Final3/2/20053/3/20053/3/2005PNH
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/2/2005 at 10:06:36 AM. Contact: ###-#### call before you go out so he can meet you. Called contractor....He did not return call today. 3/3/2005 5:18:59 PM
BLD-Final3/1/20053/2/20053/2/2005PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 3/1/2005 at 1:08:06 PM. Disp set to [CANC] by a contractor via Hello! on Mar 2 2005 10:04AM.
FIRE-Final Inspection12/14/200412/15/200412/15/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 12/15/2004 9:55:31 AM
BLD-Final12/14/200412/15/200412/15/2004PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/14/2004 at 12:29:35 PM. Contact: ###-####. ok for temp occ needs ada signs at restrooms and a letter from mti signing off spec inspection work 12/15/2004 12:49:41 PM
BLD-Final12/10/200412/14/200412/14/2004ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/10/2004 at 3:57:50 PM. Contact: ###-####. Need fire approval. 12/14/2004 11:05:05 AM
FIRE-Final Inspection12/10/200412/13/200412/13/2004PFAIL
DetailsTroy Cobbley
New overhead door in existing storage room obstructs upright sprinkler heads, provide one more fire extinguisher near the storage room entrance, provide approved door hardware on the restrooms and remove thumbturns at the main exits 12/13/2004 4:21:47 PM
BLD-Final12/8/200412/10/200412/10/2004ANR
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2004 at 2:07:17 PM. Contact: ###-####.
FIRE-Final Inspection12/8/200412/9/200412/9/2004PCANC
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/8/2004 at 2:06:37 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Dec 9 2004 10:17AM.
BLD-Framing/Rough-in11/15/200411/15/200411/15/2004PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/15/2004 at 9:57:21 AM. Contact: ###-####.
BLD-Framing/Rough-in11/1/200411/2/200411/2/2004APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/1/2004 at 5:37:27 PM. Contact: ###-####. Sch a contractor via Hello! on 11/1/2004 at 5:37:27 PM. Contact: ###-####. 11/2/2004 4:03:34 PM OK to cover framing in S/W room....would like to see better support of small section of existing ceiling in West room. 11/2/2004 4:07:23 PM
BLD-Framing/Rough-in10/29/200410/29/200410/29/2004PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 10/29/2004 at 9:15:53 AM. Contact: ###-####. No electr or plans on site. 10/29/2004 4:23:50 PM
Issue PAID IN FULL permit  10/14/2004 DONE
Inspection Record Card- Bld  10/11/2004 DONE
Print Occupancy Form  10/11/2004 DONE
Permit Ready to Issue  10/11/2004 DONE
Telephone call  10/11/2004 DONE
left mess for trent koci at ###-#### that permit is ready
Plan assigned to (R_H)8/30/2004 10/7/2004 PASS
10/7/2004 14:08:06 RMH - activity updated through activity BLDA022 from case BLD04-01963.
Routing - FIRE10/4/2004 10/7/2004 PASS
1st review completed  10/7/2004 PASS
Routing - PLAN CHECK10/7/2004 10/7/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/7/2004 DONE
Routing - PUBLIC WORKS10/4/2004 10/4/2004 PASS
Plan Reviewer's activity  10/4/2004 PEND
Routed plans back to public works, architect added new sink in breakroom on resubmitted plans.
Plan resubmittals received  9/30/2004 DONE
Received letter of transmittal with three sets of sheets A-1,A-1.2, taken to Ron Hill.
Case Summary (BLD)  9/17/2004 DONE
Routing - PLAN CHECK9/2/2004 9/17/2004 PEND
No corrections required by building department review, A Call from BRS Arcitects on 9/18/04 indicated a change to plans, I held plans waiting for new plan sheets, Will route to fire after changes have been received.
Routing - PLANNING9/1/2004 9/2/2004 PASS
The two overhead doors on the rear of the building, removal of a sliding door and replacement with storefront is approved by Design Review through the Tenant Improvement plans. No zoning certificate required.
Routing - PUBLIC WORKS8/30/2004 9/1/2004 PASS
Plans ACCEPTED BY PLAN TECH  8/29/2004  
Application received  8/25/2004  
Recd Pcfee & Taken To Pln CK  8/25/2004 DONE
Fee Review-notes8/25/20048/25/2004