Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/15/2005 | | DONE |
|
|
|
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
|
Second Notice BLD | 11/21/2005 | 11/21/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/10/2005 | 11/21/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 11/10/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10798 issued 11-10-05 to the Boise City Airport for the airfield electrical lighting bldg.
|
FIRE-Final Inspection | 11/7/2005 | 11/7/2005 | 11/7/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety is satisfactory.
|
BLD-Final | 10/27/2005 | 10/28/2005 | 10/28/2005 | A | PASS |
Jim Storey
|
|
|
final ok
|
Permanent Occupancy | | 10/28/2005 | 10/28/2005 | | DONE |
|
|
|
|
BLD-Final | 10/26/2005 | 10/27/2005 | 10/27/2005 | A | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/26/2005 at 1:22:19 PM. Contact: ###-####.
|
BLD-Energy code compliance | 8/29/2005 | 8/30/2005 | 8/30/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/29/2005 at 1:54:33 PM. Contact: ###-####.
|
BLD-Concrete | 6/28/2005 | 6/29/2005 | 6/29/2005 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/28/2005 at 8:23:36 AM. Contact: ###-####.peirs to south ok as well as slab on grade.
|
BLD-Footing | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 12:04:01 PM. Contact: ###-####.
|
(F) Reprint permit | | | 5/17/2005 | | |
|
|
|
|
Issue & PRINT to be Invoiced | | | 5/13/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/20/2005 | | DONE |
|
|
|
called left message on Larry voicemail permit is ready 4/20/05 2:00 pm
|
Telephone call | | | 1/12/2005 | | DONE |
|
|
|
left mess for larry klurstic at ###-#### is ready for pickup
|
Telephone call | | | 10/26/2004 | | DONE |
|
|
|
left mess with brett librie at ###-#### that permit is ready
|
Routing - PUBLIC WORKS | 10/21/2004 | | 10/22/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/22/2004 | | 10/22/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/22/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/22/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/22/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/22/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/22/2004 | | DONE |
|
|
|
talked brett at ###-#### that permit is ready
|
Plan assigned to (JCM) | 8/30/2004 | | 10/22/2004 | | PASS |
|
|
|
10/22/2004 09:05:11 JCM - activity updated through activity BLDA022 from case BLD04-01966.
|
Routing - PLAN CHECK | 10/20/2004 | | 10/21/2004 | | |
|
|
|
|
Routing - FIRE | 10/19/2004 | | 10/20/2004 | | PASS |
|
|
|
acceptable per resubmittal and follow-up clarification emails from architect and D. Miller.
|
Routing - FIRE | 10/12/2004 | | 10/14/2004 | | FAIL |
|
|
|
response letter does not clarify the access roadway; information is not complete on the diesel fuel. Called B. Larie, he expalained the problem with the way the access is shown on plans, I annotated in "red" to clarify. He will call back tomorrow with additional information on the diesel fuel storage tanks.
|
Routing - PLAN CHECK | 9/22/2004 | | 10/12/2004 | | |
|
|
|
|
Plan resubmittals received | | | 10/11/2004 | | DONE |
|
|
|
Received response letter with fire flow and two copies of sheets B1 and B5 taken to John M.
|
Plan Review Completed(1st rev) | | | 9/22/2004 | | FAIL |
|
|
|
failed public works and fire.
|
Routing - FIRE | 9/15/2004 | | 9/22/2004 | | FAIL |
|
|
|
lacks fire flow, FD access and fuel information
|
Routing - PLAN CHECK | 9/14/2004 | | 9/15/2004 | | PASS |
|
|
|
John M.
|
Plan Reviewer's activity | | | 9/15/2004 | | PASS |
|
|
|
Plans reviewed and approved as submitted with attached comment list. JCM
|
Routing - PLUMBING | 9/14/2004 | | 9/14/2004 | | PASS |
|
|
|
use boise city approved flammable liquids interceptor detail attached.
|
Routing - PUBLIC WORKS | 9/8/2004 | | 9/14/2004 | | FAIL |
|
|
|
NEEDS DOCUMENTATION FROM AIRPORT ENGINEER. CONTACT BRIAN MURPHY ###-####
|
Routing - AIRPORT | 8/30/2004 | | 9/3/2004 | | PASS |
|
|
|
Nicole Hortness
|
Plan resubmittals received | | | 8/31/2004 | | DONE |
|
|
|
Received via fax the united water volume flow sheet.
|
Telephone call | | | 8/30/2004 | | DONE |
|
|
|
Called Brett to let him know we need the flow rate from United Water.
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2004 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 8/30/2004 | | DONE |
|
|
|
|
Application received | | | 8/25/2004 | | |
|
|
|
|
Fee Review-notes | 8/25/2004 | 8/25/2004 | | | |
|
|
|
|