Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01966
StatusFinaled
Name LAYTON CONSTRUCTION
Site Address 2299 W COMMERCE AVE
Project NameAirfield Lighting Electrical
Customer Number 
ePlanReviewNo
Description
Boise Airport - Airfield Lighting Electrical Building - To construct a new 2900 square foot, one story, masonry and steel electrical equipment building and related site improvements. This building consists of a 765 square foot, service/parts room, a 1665 square foot, electrical equipment room and a 470 square foot, roof cover concrete slab for an emergency generation. All construction per the approved plans and attached comment list. #04-556/JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/15/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD11/21/200511/21/200512/6/2005 DONE
First Notice has not been responded to.
First Notice 11/10/200511/21/2005 DONE
Permanent occupancy  11/10/2005 DONE
Perm. Occ. Cert. # 10798 issued 11-10-05 to the Boise City Airport for the airfield electrical lighting bldg.
FIRE-Final Inspection11/7/200511/7/200511/7/2005PPASS
DetailsForrest France
Fire life safety is satisfactory.
BLD-Final10/27/200510/28/200510/28/2005APASS
DetailsJim Storey
final ok
Permanent Occupancy 10/28/200510/28/2005 DONE
Details
BLD-Final10/26/200510/27/200510/27/2005ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/26/2005 at 1:22:19 PM. Contact: ###-####.
BLD-Energy code compliance8/29/20058/30/20058/30/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 8/29/2005 at 1:54:33 PM. Contact: ###-####.
BLD-Concrete6/28/20056/29/20056/29/2005PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/28/2005 at 8:23:36 AM. Contact: ###-####.peirs to south ok as well as slab on grade.
BLD-Footing6/6/20056/7/20056/7/2005APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 6/6/2005 at 12:04:01 PM. Contact: ###-####.
(F) Reprint permit  5/17/2005  
Issue & PRINT to be Invoiced  5/13/2005 DONE
Telephone call  4/20/2005 DONE
called left message on Larry voicemail permit is ready 4/20/05 2:00 pm
Telephone call  1/12/2005 DONE
left mess for larry klurstic at ###-#### is ready for pickup
Telephone call  10/26/2004 DONE
left mess with brett librie at ###-#### that permit is ready
Routing - PUBLIC WORKS10/21/2004 10/22/2004 PASS
Routing - PLAN CHECK10/22/2004 10/22/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/22/2004 DONE
Permit Ready to Issue  10/22/2004 DONE
Inspection Record Card- Bld  10/22/2004 DONE
Print Occupancy Form  10/22/2004 DONE
Telephone call  10/22/2004 DONE
talked brett at ###-#### that permit is ready
Plan assigned to (JCM)8/30/2004 10/22/2004 PASS
10/22/2004 09:05:11 JCM - activity updated through activity BLDA022 from case BLD04-01966.
Routing - PLAN CHECK10/20/2004 10/21/2004  
Routing - FIRE10/19/2004 10/20/2004 PASS
acceptable per resubmittal and follow-up clarification emails from architect and D. Miller.
Routing - FIRE10/12/2004 10/14/2004 FAIL
response letter does not clarify the access roadway; information is not complete on the diesel fuel. Called B. Larie, he expalained the problem with the way the access is shown on plans, I annotated in "red" to clarify. He will call back tomorrow with additional information on the diesel fuel storage tanks.
Routing - PLAN CHECK9/22/2004 10/12/2004  
Plan resubmittals received  10/11/2004 DONE
Received response letter with fire flow and two copies of sheets B1 and B5 taken to John M.
Plan Review Completed(1st rev)  9/22/2004 FAIL
failed public works and fire.
Routing - FIRE9/15/2004 9/22/2004 FAIL
lacks fire flow, FD access and fuel information
Routing - PLAN CHECK9/14/2004 9/15/2004 PASS
John M.
Plan Reviewer's activity  9/15/2004 PASS
Plans reviewed and approved as submitted with attached comment list. JCM
Routing - PLUMBING9/14/2004 9/14/2004 PASS
use boise city approved flammable liquids interceptor detail attached.
Routing - PUBLIC WORKS9/8/2004 9/14/2004 FAIL
NEEDS DOCUMENTATION FROM AIRPORT ENGINEER. CONTACT BRIAN MURPHY ###-####
Routing - AIRPORT8/30/2004 9/3/2004 PASS
Nicole Hortness
Plan resubmittals received  8/31/2004 DONE
Received via fax the united water volume flow sheet.
Telephone call  8/30/2004 DONE
Called Brett to let him know we need the flow rate from United Water.
Plans ACCEPTED BY PLAN TECH  8/30/2004 DONE
Plan routing begun/NEW & ADDTN  8/30/2004 DONE
Application received  8/25/2004  
Fee Review-notes8/25/20048/25/2004