Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-01997
StatusFinaled
Name TOTAL MERCHANT SERVICES
Site Address 6485 W INTERCHANGE LN
Project NameINTERCHANGE LOT #10
Customer Number 
ePlanReviewNo
Description
(TOTAL MERCHANGE SERVICES OFFICE BUILDING) To construct a new 4,428 sq.ft. single story, wood framed, office building. Work to include completion of interior office space, restrooms onsite landscaping and parking lot construction. MJP DRH 04-00136 CUP 03-00014 (Modified 3/31/05 MJP) Refer to MIS 05-00039 for the Certificate of Occupancy for the 2,943 sq.ft. portion of the building. for TOTAL MERCHANT'S SERVICES. There is 1,485 sq.ft. of unfinished office space, this space will require a separate permit and Certificate of Occupancy to be obtained to finish and occupy this area of the building.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Override - Parcel Holds  4/6/2005  
Letter of compliance  4/6/2005 DONE
Letter of Compliance issued 4-6-05.
BLD-Final4/5/20054/5/20054/5/2005PPASS
DetailsTom Arcoraci
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm 4/5/2005 3:30:57 PM
Override - Parcel Holds1/1/19001/1/19004/5/2005  
final inspection
FIRE-Final Inspection3/31/20054/1/20054/1/2005APASS
DetailsForrest France
Fire life safety finaled. HVAC units under 2000 cfm per glen at dave evans construction.
FIRE-Final Inspection3/30/20053/31/20053/31/2005AFAIL
DetailsForrest France
GLEN; Phone #: ###-#### Fail inspection. No review notes on site.
Override - Parcel Holds1/1/19001/1/19003/31/2005  
Plan Reviewer's activity  3/31/2005 DONE
Permit modifies to reflect floor plan change of October 13th 2004. The floor area was changed to reflect 1485 sq.ft. of unfinished office space dor future tenant.
BLD-Final3/25/20053/30/20053/30/2005PCANC
DetailsTom Arcoraci
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection3/30/20053/30/20053/30/2005PFAIL
DetailsTroy Cobbley
Wrong plans on site. Floor plans do not match what is built
Code Occupancy Approval4/1/20053/30/20053/30/2005PPASS
DetailsScott M.Brown
FIRE-Final Inspection3/24/20053/25/20053/25/2005PFAIL
DetailsTroy Cobbley
No approved plans on site. No inspection performed. 3/25/2005 3:35:11 PM
FIRE-Final Inspection3/22/20053/23/20053/23/2005AFAIL
DetailsTroy Cobbley
glenn; Phone #: ###-#### Provide approved plans for inspection, Repair exit lights and provide building address and suite numbers 3/23/2005 12:57:52 PM
BLD-Energy code compliance3/18/20053/21/20053/21/2005APART
DetailsTom Arcoraci
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Framing/Rough-in12/22/200412/23/200412/23/2004APASS
DetailsLane Manuel
glenn; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
rough framing ok

r-19 in walls ok 12/23/2004 9:17:59 AM
BLD-Framing/Rough-in12/17/200412/20/200412/20/2004APART
DetailsLane Manuel
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice

c/n on site

ok to insulate walls 12/20/2004 10:17:46 AM
BLD-Framing/Rough-in11/22/200411/23/200411/23/2004APART
DetailsLane Manuel
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
shear nailing ok 11/23/2004 2:28:39 PM
BLD-Framing/Rough-in11/22/200411/22/200411/22/2004PDONE
DetailsLane Manuel
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
conference with contractor. I informed him that they must resubmit plans for modification to the floor plan, (added long wall through center of bldg.) 11/22/2004 1:30:42 PM
BLD-Framing/Rough-in11/16/200411/17/200411/17/2004AFAIL
DetailsDave Hannah
glen - Note: shear wall; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no city apro plans on site and strapes not nailed no inspection done at this time 11/17/2004 9:24:53 AM
BLD-Footing11/1/200411/1/200411/1/2004PPASS
DetailsJim Sly
Steve; Phone #: ###-#### Internet Inspection Request from: Jan Rice Wall OK. 11/1/2004 3:51:43 PM
BLD-Footing10/28/200410/29/200410/29/2004ANR
DetailsJim Storey
Glen; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing10/29/200410/29/200410/29/2004PPASS
DetailsTroy James
Steve; Phone #: ###-#### Internet Inspection Request from: Jan Rice
(F) Reprint permit  10/26/2004  
Issue PAID IN FULL permit  10/25/2004 DONE
Permit Ready to Issue  10/22/2004  
Inspection Record Card- Bld  10/22/2004 DONE
Print Occupancy Form  10/22/2004 DONE
Telephone call  10/22/2004 DONE
called dave evans const at ###-#### that permit is ready
Routing - PLAN CHECK10/19/2004 10/21/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/21/2004 DONE
Print Pending Permit.LaserJet4  10/21/2004 DONE
Case Summary (BLD)  10/21/2004 DONE
Plan assigned to (M_P)8/31/2004 10/21/2004 PASS
10/21/2004 14:08:06 M_P - activity updated through activity BLDA022 from case BLD04-01997.
Routing - PLAN CHECK10/18/2004 10/19/2004  
Routing to Land Division
Routing - PLANNING Land Div10/19/2004 10/19/2004 PASS
Approved, two lots have been combined into one parcel.
Routing - FIRE10/14/2004 10/18/2004 PASS
Resubmittal acceptable with plot plan obtained from Addressing.
Routing - PLAN CHECK9/28/2004 10/14/2004  
Routing to fire.
Plan resubmittals received  10/14/2004 DONE
Received Transmittal Letter, & 2 Copys of Sheets 3,5,7,EN-3,Sheet 1of 1 Taken to Mike Phillips.....
Routing - PLAN CHECK9/23/2004 9/28/2004  
Routing to ESC.
Routing - Erosion and Sediment9/28/2004 9/28/2004 PASS
ESC plan approved with attached conditions.
Routing - PLANNING9/23/2004 9/27/2004 PASS
Rout to Sarah for further review.

Approved per DRH04-00136. Documents passed on to Mark P. for review.
Plan Review Completed(1st rev)  9/23/2004 FAIL
failed planning land div, planning, plan check ESC and fire.
Routing - FIRE9/20/2004 9/23/2004 FAIL
plans lack FD access roads. review faxed to architect.
Routing - PLAN CHECK9/13/2004 9/20/2004 FAIL
Plan review completed, sent correction report to architect requesting additional information be submitted for futher review prior to issuing permit.
Case Summary (BLD)  9/20/2004  
Routing - PLANNING9/8/2004 9/13/2004 FAIL
Sara S. DRH04-00136 - Does not meet the requirements of the conditions on the DR. There is no landscape plan in the site. Not air conditioning units are shown and no bike rack location is shown.

Mark P. CUP03-00014 Mod 1

Failed Erosion Control, a condition of approval and DR Approval.
Routing - PLUMBING9/7/2004 9/8/2004 PASS
Plan resubmittals received  9/8/2004 DONE
Received Transmittal Letter, and 2 Copys of ESC Control Plan ...Taken to Mike Phillips......
Routing - PUBLIC WORKS9/1/2003 9/7/2004 PASS
Routing - Erosion and Sediment9/7/2004 9/7/2004 FAIL
ESC plan not per BCC 8-17, notified PD.
Routing - PLANNING Land Div8/31/2004 9/1/2004 FAIL
Need to combine Lots 10 and 11 with new deed with metes and bounds description around outer perimeter. After deed is recorded, obtain new tax parcel number. Called and left voice mail for Dave Evans on 9/1/04. ###-####
Plans ACCEPTED BY PLAN TECH  8/31/2004 DONE
Vicinity map is on last page...
Plan routing begun/NEW & ADDTN  8/31/2004  
Fee Review-notes8/30/20048/30/20048/30/2004 DONE
Recd Pcfee & Taken To Pln CK  8/30/2004 DONE
Application received  8/27/2004