Permit Information
Permit NumberBLD04-02003
StatusFinaled
Name QUALITY QUARTZ ENGINEERING
Site Address 11566 W PRESIDENT DR
Project NameBENTE BLDG
Customer Number 
ePlanReviewNo
Description
(QUALITY QUARTZ ENGINEERING)(BENTE BLDG) A "Certificate of Occupancy is required. The building is fully sprinklered. To remodel and finish a 6,000 sq.ft. area on the west side of the building for a fabrication facility for glass products per approved plans. Work includes construction & finish of interior walls to create stock, packaging, cleaning and hot fabrication areas with access doors between areas; to remove portion of storefront glazing and enlarge opening per attached engineering detail, installing C10x15.3 steel channel as structural reinforcing support above opening with 3/4" threaded support rods W/ Hilti Hit HY-150 adhesive anchor (ER-5193), layout as shown, for new overhead door; to install cylinder 6-pack's of Hydrogen & Oxygen with process piping, process piping and non-combustible barrier between H2 & O2 cylinders, all per hazardous materials technical report attached to plans; to install or modify electrical, mechanical, plumbing, fire sprinkler & alarm systems to meet tenant needs and comply with adopted codes & ordinances.Use of hazardous materials within this tenant space are within allowable limits per code based on hazardous materials inventory provided by approved haz mat technical report attached. PC04-563/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/7/200512/7/200512/8/2005 DONE
Too old no good #'s to reach anyone on
Second Notice 5/20/200512/7/2005 DONE
First Notice 12/16/20044/26/2005 DONE
BLD-Final12/16/200412/16/200412/16/2004PPASS
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/16/2004 at 9:47:23 AM.
permanent c of o ok 12/16/2004 3:03:55 PM
Permanent Occupancy 12/16/200412/16/2004 DONE
Details
Permanent occupancy UNPAID FEE  12/16/2004 DONE
Perm. Occ. Cert. # 10387 issued 12-16-04 to Quality Quartz Engineering.
BLD-Final12/15/200412/15/200412/15/2004PCANC
DetailsLane Manuel
Scheduled by a contractor via Hello! on 12/15/2004 at 10:31:33 AM. Contact: ###-####.
still needs plumbing final. 12/15/2004 2:13:27 PM
BLD-Final12/13/200412/13/200412/13/2004PPART
DetailsLane Manuel
signed for temp. c of o.
need to install emergency illumination @ exterior of bldg
Plan Reviewer's activity  12/13/2004 DONE
Received written request from Cornel Larson concerning inspectors concern for previously existing 1-hour tenant separation wall constructed under the 1997 UBC. This requirement does not existi under the IBC and in reviewing the entire building for mixed occupancies with non-separated uses (no fire wall requirements), it was determined that the different occupancies didnot require fire separation. This was noted in plan review comment #1. I reviewed with with Layne Manuel, structural inspector, by phone, that the wall did not require a rated door or fire dampers at duct penetrations. I also called Cornel and reviewed this with him.
FIRE-Final Inspection12/9/200412/10/200412/10/2004APASS
DetailsTroy Cobbley
Fire life safety finaled 12/10/2004 9:10:18 AM
BLD-Final12/9/200412/10/200412/10/2004PFAIL
DetailsLane Manuel
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n left on site. No temp c of o. 12/10/2004 2:25:51 PM
FIRE-Final Inspection12/6/200412/6/200412/6/2004PFAIL
DetailsTroy Cobbley
Provide correct hardware on two of the west facing exit doors. Provide correct light level on face of exit sign or provide another type of approved exit sign at south (west facing) exit
BLD-Framing/Rough-in9/21/20049/22/20049/22/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 9/21/2004 at 2:20:22 PM. Contact: ###-####.
6" walls ok for cover @ inter. portion of project 9/22/2004 3:11:35 PM
Plan resubmittals received  9/20/2004 PASS
Revised plan resubmitted showing excess flow control valve to be installed on hydrogen manifold piping. Copy sent to Cobbley for field verification at final inspection and to records for scanning.
Plan assigned to (DRS)8/30/2004 9/10/2004 PASS
9/10/2004 11:32:49 DRS - activity updated through activity BLDA022 from case BLD04-02003.
Routing - FIRE9/8/2004 9/10/2004 PASS
Plan Review Completed(1st rev)  9/10/2004 FAIL
failed plan check
Routing - PLAN CHECK9/10/2004 9/10/2004 PASS
Approved as noted on and all attached documents & plan review conditions.
PLANS/APPL TAKEN TO FRONT DESK  9/10/2004 PASS
To permit desk to issue.
Inspection Record Card- Bld  9/10/2004 DONE
Print Occupancy Form  9/10/2004 DONE
Permit Ready to Issue  9/10/2004 DONE
Telephone call  9/10/2004 DONE
permit ready and fee due
Issue PAID IN FULL permit  9/10/2004 DONE
Routing - PLAN CHECK9/2/2004 9/8/2004 PEND
DetailsDan Stuart
No further re-submittals required. Routing to fire code analyst for review.
Plan resubmittals received  9/8/2004 DONE
Received two new sheets of M-1.
Telephone call  9/7/2004 DONE
Call from Rich Miller, Hazardous Materials Code Consultant, telling me the shalls for H2 sensors in item 1 of report should have been 'should' . Sensor is not required but is recommended.
Plan resubmittals requested  9/2/2004 FAIL
Phone conversation with Cornel Larson. Mechanical sheet M-1 clarification forthcoming & copy of code data.
Routing - PLUMBING8/31/2004 9/2/2004 PASS
Routing - PUBLIC WORKS8/30/2004 8/31/2004 PASS
Routing - PLANNING8/31/2004 8/31/2004 PASS
Approved. Removing two parking spaces. There will still be 89 parking spaces available.
Plans ACCEPTED BY PLAN TECH  8/30/2004  
Application received  8/27/2004  
Recd Pcfee & Taken To Pln CK  8/27/2004 DONE
Fee Review-notes8/27/20048/27/2004