BLD-Final | 11/22/2005 | 11/23/2005 | 11/23/2005 | A | PASS |
Tony Young
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
DOC - Permit Finaled | 11/23/2005 | 11/23/2005 | 11/23/2005 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 11/16/2005 | 11/16/2005 | 11/16/2005 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 8/18/2005 | 8/19/2005 | 8/19/2005 | A | PASS |
Dave Hannah
|
|
|
late am please////jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok to cover after mec c/n is oked
|
BLD-Framing/Rough-in | 8/15/2005 | 8/16/2005 | 8/17/2005 | P | PASS |
Dave Hannah
|
|
|
jim boyd construction inc; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | PART |
Dave Hannah
|
|
|
jim Note: shear paneling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles shear ok to cover ext
|
BLD-Foundation | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | PART |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 5/5/2005 | 5/5/2005 | 5/5/2005 | P | PASS |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore last sec of basement wall
|
BLD-Concrete | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PART |
Dave Hannah
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore garage and part of bootom wall ok to pour
|
BLD-Footing | 4/18/2005 | 4/18/2005 | 4/18/2005 | P | PASS |
Troy James
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 4/12/2005 | 4/13/2005 | 4/13/2005 | A | PART |
Troy James
|
|
|
tim ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 4/12/2005 | 4/12/2005 | 4/12/2005 | | DONE |
|
|
|
footing subgrade has been approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 11/22/2004 | 11/22/2004 | 4/12/2005 | | DONE |
|
|
|
A letter from the applicants geotechical engineer indicting that the footing subgrade is acceptable must be approved by PublicWorks prior to calling for a footing inspection. Call Terry Records at ###-####.
|
Override - Activity Holds | | | 3/22/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 3/22/2005 | | DONE |
|
|
|
|
Override - Activity Holds | | | 12/15/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 12/15/2004 | | |
|
|
|
|
Override - Activity Holds | | | 12/15/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/15/2004 | | |
|
|
|
|
Print Occupancy Form | | | 12/15/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/15/2004 | | DONE |
|
|
|
left mess for jim boyd at ###-#### permit is ready
|
Plan assigned to (DJO) | 12/14/2004 | 12/14/2004 | 12/14/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/14/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 12/14/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 12/14/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2004 | | DONE |
|
|
|
|
Pending Assignment by DJO | 8/30/2004 | | 12/14/2004 | | DONE |
|
|
|
12/14/2004 14:04:47 DJO - activity updated through activity BLDA169 from case BLD04-02018.
|
Routing - PLAN CHECK | 11/24/2004 | | 12/13/2004 | | PEND |
|
|
|
Placed plans in hold drawer awaiting esc approval. rad
|
Routing - Erosion and Sediment | 12/13/2004 | | 12/13/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - FIRE | 11/23/2004 | | 11/24/2004 | | PASS |
|
|
|
No fire sprinklers required. (Boise Heights # 1 sub)
|
Routing - Erosion and Sediment | 11/23/2004 | | 11/23/2004 | | FAIL |
|
|
|
RP listed does not have day to day control over project throughout entire project. Per telephone conversation on 11/23/04 contractor will get certified as rp and become attached to esc permit.
|
Routing - PLANNING | 11/22/2004 | | 11/23/2004 | | PASS |
|
|
|
Height o.k. as measured from adjacent grade, per conversation with Scott Spjute.
|
Routing - PUBLIC WORKS | 11/22/2004 | | 11/22/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 11/22/2004 | | 11/22/2004 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PLANNING Land Div | 11/22/2004 | | 11/22/2004 | | PASS |
|
|
|
Approved as Parcel A on ROS03-00069. ROS 6411 recorded on February 11, 2004.
|
Routing - PUBLIC WORKS GRADING | 8/30/2004 | | 8/31/2004 | | FAIL |
|
|
|
Footings don't meet setback required by geotechnical engineer. Garage footing is 4 feet above existing grade.
|
Application received | | | 8/30/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 12/13/2004 | | | | |
|
|
|
|