Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02020
StatusFinaled
Name HEINZ DEVELOPMENT
Site Address 11580 W FAIRVIEW AVE
Project NameCOLTRIN BUILDING
Customer Number 
ePlanReviewNo
Description
Coltrin Building (Shell) -To construct a 18,490 sq. ft. two story type VB fully fire sprinklered office/retail shell building. Other work inlcudes all site improvements, paving and landscaping per approved plans and attachments, DRH04-124. No occupancy is authorized by this permit. Separate plans and permits are required for each tenant space. Fire sprinklers are used for area and story increase. First floor 14,000 sq. ft, 2nd floor 4,490 sq. ft.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  3/13/2006 DONE
Letter of Compliance issued 3-13-06.
BLD-Final3/10/20063/10/20063/10/2006PPASS
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
OK for Perm Occ :)
FIRE-Final Inspection2/16/20062/16/20062/16/2006PPASS
DetailsTroy Cobbley
life safety finaled
PubWorks Occupancy Approval2/5/20062/5/20062/13/2006 DONE
inspection completed by R.Rokovitz
Temporary occupancy  2/9/2006 DONE
Temp. Occ. Cert. # 5365 issued 2-9-06 to the Coltrin Bldg. shell
BLD-Final2/7/20062/8/20062/8/2006APART
DetailsJim Sly
mike ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
OK for Temp Occ. Need Perm Occ fromElectr, Fire, Code Enf and ..........
FIRE-Final Inspection2/7/20062/8/20062/7/2006APART
DetailsTroy Cobbley
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
BLD-Final2/3/20062/6/20062/6/2006ANR
DetailsMike Jordan
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs other finals prior to bldg. final.
BLD-Final2/2/20062/3/20062/3/2006PNR
DetailsJim Sly
requst 3 pm//final and conference//mike heinz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD-Conference1/10/20061/11/20061/12/2006PPASS
DetailsJim Sly
mike heinz -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Energy code compliance12/14/200512/15/200512/15/2005APASS
DetailsJim Sly
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/2/200511/3/200511/3/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 11/2/2005 at 5:36:12 PM.
Gave OK to Mike to cover up selected areas for prerock.
BLD-Framing/Rough-in9/22/20059/23/20059/23/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/22/2005 at 4:22:47 PM. Contact: ###-####. Shear nailing ok
BLD-Framing/Rough-in9/7/20059/8/20059/8/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 9/7/2005 at 4:02:28 PM. Contact: ###-####.
BLD-Framing/Rough-in8/31/20059/1/20059/2/2005APART
DetailsJim Sly
Scheduled by a contractor via Hello! on 8/31/2005 at 1:21:18 PM. Contact: ###-####.
Shear wall nailing OK at S. wall (front of bldg), East wall, and North wall. OK to cover these areas.
BLD-Foundation6/15/20056/15/20056/15/2005PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/15/2005 at 8:11:16 AM. Contact: ###-####.
All foundations passed.
BLD-Footing6/13/20056/14/20056/14/2005PPART
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/13/2005 at 4:50:01 PM. Contact: ###-####. Interior footing pads and Elevator shaft footing OK.
BLD-Footing6/10/20056/13/20056/13/2005PNR
DetailsJim Sly
Scheduled by a contractor via Hello! on 6/10/2005 at 3:03:15 PM. Contact: ###-####.
BLD-Foundation4/26/20054/27/20054/27/2005PPASS
DetailsJim Sly
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls and piers. 4/27/2005 2:27:11 PM
BLD-Footing4/22/20054/25/20054/25/2005PPASS
DetailsJim Sly
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  2/23/2005  
Override - People Holds  2/22/2005  
Issue PAID IN FULL permit  2/22/2005 DONE
OVERRIDE  1/6/2005  
OVERRIDE  1/6/2005  
OVERRIDE  1/6/2005  
OVERRIDE  1/6/2005  
OVERRIDE  1/6/2005  
Override - People Holds  1/6/2005  
Permit Ready to Issue  1/6/2005 DONE
Override - People Holds  1/6/2005  
Inspection Record Card- Bld  1/6/2005 DONE
Telephone call  1/6/2005 DONE
left mess for randy haverfield at ###-#### is ready & need achd
Routing - FIRE12/28/2004 1/5/2005 PASS
resubmittal acceptable.
PLANS/APPL TAKEN TO FRONT DESK  1/5/2005 DONE
Plan assigned to (MLO)9/1/2004 1/5/2005 PASS
1/5/2005 10:55:20 MLO - activity updated through activity BLDA022 from case BLD04-02020.
Routing - PLAN CHECK12/23/2004 12/28/2004 PASS
Routing - PLANNING12/23/2004 12/23/2004 PASS
Approve per DRH04-124 and as noted on sheet A1.0.
Routing - PUBLIC WORKS12/14/2004 12/21/2004 PASS
Plan resubmittals received  12/21/2004 DONE
Received two copies of revised sheetsA-1.1, A-3.0, A-3.1, one plan review report and one itemized response. Rouetd to Mike O. kmm
Routing Off Site - STRUCTURAL12/10/2004 12/13/2004 PASS
CALLED PDQ FOR PICK UP.
Routing - PLAN CHECK12/10/2004 12/10/2004 FAIL
minor item on elevator machine room faxed corrections and contacted architect by phone. MLO
Plan resubmittals requested  12/10/2004 DONE
elevator machine room .
Plan resubmittals received  12/10/2004 DONE
Received Transmittal Letter, 2 United Water ,1 Fire Code Review, 2 Structural Calcs, 5 Copys of Sheets A-0.0, A-1.1, A-2.0, A-2.1, A-2.2, A-3.0, A-3.1, A-4.0, A-5.0, A-5.3, A-6.0, A-8.0, A-8.1, M1.0, M1.1, P0.0, P1.0, P1.1, E-2.0, E-4.0, EN-1.1 Taken to Mike O.
Routing - Erosion and Sediment10/1/2004 10/1/2004 PASS
ESC plan approved with attached conditions.
Routing - PLAN CHECK10/1/2004 10/1/2004 PEND
Routing - FIRE9/24/2004 9/29/2004 FAIL
lacks hydrant and waterflow info.
Plan Review Completed(1st rev)  9/29/2004 FAIL
failed public works, ESC, planning, plan check and Fire.
Routing - PLAN CHECK9/29/2004 9/29/2004 PEND
Routing - PLAN CHECK9/15/2004 9/24/2004 FAIL
corrections sent to architect
Plan resubmittals requested  9/24/2004 DONE
IBC corrections
Routing Off Site - STRUCTURAL9/1/2004 9/24/2004 FAIL
Called PDQ for pick-up...
Routing - PLANNING9/13/2004 9/15/2004 FAIL
The landscape plan for the project has 15' shrubs growing in a 5' planter. Also, Japenese Maple won't survive the parking lot conditions. Need vegetation in planters on the east and southwest sides of the building. I will contact applicant with required changes.
Routing - PLUMBING9/10/2004 9/13/2004 PASS
use boise city approved grease interceptor detail attached. min. horizontal rain water piping is 3".
Routing - Erosion and Sediment9/9/2004 9/10/2004 FAIL
ESC plan not per BCC 8-17.
Routing - PUBLIC WORKS9/3/2004 9/9/2004 FAIL
Requires drainage plan revisions & Geotech Report. Contact Brian Murphy at ###-####.
Routing - PLANNING Land Div9/2/2004 9/3/2004 PASS
Approved. Legal parcel in Ada County prior to annexation in 1999.
Plans ACCEPTED BY PLAN TECH  9/2/2004  
Plan routing begun/NEW & ADDTN  9/2/2004  
Application received  8/30/2004  
Recd Pcfee & Taken To Pln CK  8/30/2004 DONE
Fee Review-notes8/30/20048/30/2004   
BLD-Grading Inspection