Letter of compliance | | | 3/13/2006 | | DONE |
|
|
|
Letter of Compliance issued 3-13-06.
|
BLD-Final | 3/10/2006 | 3/10/2006 | 3/10/2006 | P | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles OK for Perm Occ :)
|
FIRE-Final Inspection | 2/16/2006 | 2/16/2006 | 2/16/2006 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled
|
PubWorks Occupancy Approval | 2/5/2006 | 2/5/2006 | 2/13/2006 | | DONE |
|
|
|
inspection completed by R.Rokovitz
|
Temporary occupancy | | | 2/9/2006 | | DONE |
|
|
|
Temp. Occ. Cert. # 5365 issued 2-9-06 to the Coltrin Bldg. shell
|
BLD-Final | 2/7/2006 | 2/8/2006 | 2/8/2006 | A | PART |
Jim Sly
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa OK for Temp Occ. Need Perm Occ fromElectr, Fire, Code Enf and ..........
|
FIRE-Final Inspection | 2/7/2006 | 2/8/2006 | 2/7/2006 | A | PART |
Troy Cobbley
|
|
|
A temporary occupancy was given with Dave Hannemans permission until issues with the shell building have been corrected.
|
BLD-Final | 2/3/2006 | 2/6/2006 | 2/6/2006 | A | NR |
Mike Jordan
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Still needs other finals prior to bldg. final.
|
BLD-Final | 2/2/2006 | 2/3/2006 | 2/3/2006 | P | NR |
Jim Sly
|
|
|
requst 3 pm//final and conference//mike heinz; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Conference | 1/10/2006 | 1/11/2006 | 1/12/2006 | P | PASS |
Jim Sly
|
|
|
mike heinz -call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Energy code compliance | 12/14/2005 | 12/15/2005 | 12/15/2005 | A | PASS |
Jim Sly
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 11/2/2005 | 11/3/2005 | 11/3/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/2/2005 at 5:36:12 PM. Gave OK to Mike to cover up selected areas for prerock.
|
BLD-Framing/Rough-in | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/22/2005 at 4:22:47 PM. Contact: ###-####. Shear nailing ok
|
BLD-Framing/Rough-in | 9/7/2005 | 9/8/2005 | 9/8/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/7/2005 at 4:02:28 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 8/31/2005 | 9/1/2005 | 9/2/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 8/31/2005 at 1:21:18 PM. Contact: ###-####. Shear wall nailing OK at S. wall (front of bldg), East wall, and North wall. OK to cover these areas.
|
BLD-Foundation | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/15/2005 at 8:11:16 AM. Contact: ###-####. All foundations passed.
|
BLD-Footing | 6/13/2005 | 6/14/2005 | 6/14/2005 | P | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/13/2005 at 4:50:01 PM. Contact: ###-####. Interior footing pads and Elevator shaft footing OK.
|
BLD-Footing | 6/10/2005 | 6/13/2005 | 6/13/2005 | P | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 6/10/2005 at 3:03:15 PM. Contact: ###-####.
|
BLD-Foundation | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Jim Sly
|
|
|
clint; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Walls and piers. 4/27/2005 2:27:11 PM
|
BLD-Footing | 4/22/2005 | 4/25/2005 | 4/25/2005 | P | PASS |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
(F) Reprint permit | | | 2/23/2005 | | |
|
|
|
|
Override - People Holds | | | 2/22/2005 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/22/2005 | | DONE |
|
|
|
|
OVERRIDE | | | 1/6/2005 | | |
|
|
|
|
OVERRIDE | | | 1/6/2005 | | |
|
|
|
|
OVERRIDE | | | 1/6/2005 | | |
|
|
|
|
OVERRIDE | | | 1/6/2005 | | |
|
|
|
|
OVERRIDE | | | 1/6/2005 | | |
|
|
|
|
Override - People Holds | | | 1/6/2005 | | |
|
|
|
|
Permit Ready to Issue | | | 1/6/2005 | | DONE |
|
|
|
|
Override - People Holds | | | 1/6/2005 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/6/2005 | | DONE |
|
|
|
|
Telephone call | | | 1/6/2005 | | DONE |
|
|
|
left mess for randy haverfield at ###-#### is ready & need achd
|
Routing - FIRE | 12/28/2004 | | 1/5/2005 | | PASS |
|
|
|
resubmittal acceptable.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/5/2005 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/1/2004 | | 1/5/2005 | | PASS |
|
|
|
1/5/2005 10:55:20 MLO - activity updated through activity BLDA022 from case BLD04-02020.
|
Routing - PLAN CHECK | 12/23/2004 | | 12/28/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 12/23/2004 | | 12/23/2004 | | PASS |
|
|
|
Approve per DRH04-124 and as noted on sheet A1.0.
|
Routing - PUBLIC WORKS | 12/14/2004 | | 12/21/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/21/2004 | | DONE |
|
|
|
Received two copies of revised sheetsA-1.1, A-3.0, A-3.1, one plan review report and one itemized response. Rouetd to Mike O. kmm
|
Routing Off Site - STRUCTURAL | 12/10/2004 | | 12/13/2004 | | PASS |
|
|
|
CALLED PDQ FOR PICK UP.
|
Routing - PLAN CHECK | 12/10/2004 | | 12/10/2004 | | FAIL |
|
|
|
minor item on elevator machine room faxed corrections and contacted architect by phone. MLO
|
Plan resubmittals requested | | | 12/10/2004 | | DONE |
|
|
|
elevator machine room .
|
Plan resubmittals received | | | 12/10/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 United Water ,1 Fire Code Review, 2 Structural Calcs, 5 Copys of Sheets A-0.0, A-1.1, A-2.0, A-2.1, A-2.2, A-3.0, A-3.1, A-4.0, A-5.0, A-5.3, A-6.0, A-8.0, A-8.1, M1.0, M1.1, P0.0, P1.0, P1.1, E-2.0, E-4.0, EN-1.1 Taken to Mike O.
|
Routing - Erosion and Sediment | 10/1/2004 | | 10/1/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 10/1/2004 | | 10/1/2004 | | PEND |
|
|
|
|
Routing - FIRE | 9/24/2004 | | 9/29/2004 | | FAIL |
|
|
|
lacks hydrant and waterflow info.
|
Plan Review Completed(1st rev) | | | 9/29/2004 | | FAIL |
|
|
|
failed public works, ESC, planning, plan check and Fire.
|
Routing - PLAN CHECK | 9/29/2004 | | 9/29/2004 | | PEND |
|
|
|
|
Routing - PLAN CHECK | 9/15/2004 | | 9/24/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 9/24/2004 | | DONE |
|
|
|
IBC corrections
|
Routing Off Site - STRUCTURAL | 9/1/2004 | | 9/24/2004 | | FAIL |
|
|
|
Called PDQ for pick-up...
|
Routing - PLANNING | 9/13/2004 | | 9/15/2004 | | FAIL |
|
|
|
The landscape plan for the project has 15' shrubs growing in a 5' planter. Also, Japenese Maple won't survive the parking lot conditions. Need vegetation in planters on the east and southwest sides of the building. I will contact applicant with required changes.
|
Routing - PLUMBING | 9/10/2004 | | 9/13/2004 | | PASS |
|
|
|
use boise city approved grease interceptor detail attached. min. horizontal rain water piping is 3".
|
Routing - Erosion and Sediment | 9/9/2004 | | 9/10/2004 | | FAIL |
|
|
|
ESC plan not per BCC 8-17.
|
Routing - PUBLIC WORKS | 9/3/2004 | | 9/9/2004 | | FAIL |
|
|
|
Requires drainage plan revisions & Geotech Report. Contact Brian Murphy at ###-####.
|
Routing - PLANNING Land Div | 9/2/2004 | | 9/3/2004 | | PASS |
|
|
|
Approved. Legal parcel in Ada County prior to annexation in 1999.
|
Plans ACCEPTED BY PLAN TECH | | | 9/2/2004 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/2/2004 | | |
|
|
|
|
Application received | | | 8/30/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/30/2004 | | DONE |
|
|
|
|
Fee Review-notes | 8/30/2004 | 8/30/2004 | | | |
|
|
|
|
BLD-Grading Inspection | | | | | |
|
|
|
|