BLD-Final | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Tony Young
|
|
|
Kevin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
l of c issued 2/7/2005 3:01:20 PM
|
DOC - Permit Finaled | 2/7/2005 | 2/7/2005 | 2/7/2005 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 2/7/2005 3:00:18 PM
|
BLD-Energy code compliance | 11/2/2004 | 11/3/2004 | 11/3/2004 | A | PASS |
Tony Young
|
|
|
Kevin-; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Framing/Rough-in | 10/28/2004 | 10/28/2004 | 10/28/2004 | P | PASS |
Tony Young
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
ok to insulate 10/28/2004 2:30:00 PM
|
BLD-Foundation | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | CANC |
Tony Young
|
|
|
Kevin- NOTE: Shear nailing; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
|
BLD-Framing/Rough-in | 10/25/2004 | 10/25/2004 | 10/25/2004 | P | PART |
Tony Young
|
|
|
ext. shear ok 10/25/2004 3:27:01 PM
|
BLD-Framing/Rough-in | 10/21/2004 | 10/22/2004 | 10/22/2004 | A | FAIL |
Dave Hannah
|
|
|
shear nail inspection please///kevin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no plans on site 10/22/2004 10:21:04 AM
|
BLD-Foundation | 9/27/2004 | 9/28/2004 | 9/28/2004 | P | PART |
Tony Young
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 9/21/2004 | 9/22/2004 | 9/22/2004 | P | PART |
Tony Young
|
|
|
kevin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Grading Inspection | 9/22/2004 | 9/22/2004 | 9/22/2004 | | DONE |
|
|
|
footing subgrade is conditionally approved as noted. In one portion of the proposed addition fill soils were noted in association with a pre-existing drainage pipe. These fill soils must be excavated to a minimum depth of approximately 1 foot. Fill is very localized and is not anticipated to extend laterally for more that approximately 1 foot in either direction from the drainpipe
|
Plan assigned to (PEP) | 8/31/2004 | 8/31/2004 | 9/14/2004 | | PASS |
|
|
|
9/14/2004 07:58:56 PEP - activity updated through activity BLDA022 from case BLD04-02022.
|
Case Summary (BLD) | | | 9/14/2004 | | |
|
|
|
|
Plan Review Report | | | 9/14/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/14/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/14/2004 | | |
|
|
|
|
(F) Reprint permit | | | 9/14/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/14/2004 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 9/7/2004 | | 9/9/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 9/7/2004 | | 9/7/2004 | | PASS |
|
|
|
plans redlined to show new work within 30' setback and existing structure to remain. See redlined plans.
|
Routing - PLANNING | 9/2/2004 | | 9/7/2004 | | PASS |
|
|
|
requested additional information - no architectural drawings submitted and site plan does not have a complete building footprint. Rear setback issue. Left detailed message for Kevin Lynch Friday am. **see other planning review to pass.
|
Routing - PUBLIC WORKS GRADING | 9/2/2004 | | 9/2/2004 | | PASS |
|
|
|
Grading approved with conditions of approval in letter attached to the plans
|
Application received | | | 8/30/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 9/9/2004 | | | | |
|
|
|
Perry Paine
|