Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02031
StatusFinaled
Name BMC WEST
Site Address 720 E PARK BLVD
Project NameMK CENTRAL PLAZA
Customer Number 
ePlanReviewNo
Description
(BMC WEST - MK CENTRAL PLAZA - STE 200) This building is fire sprinklered for unlimited area. To divide a 426 square foot room into two (2) 166 square foot offices and to divide a 299 square foot room into two (2) 146 square foot offices. The remodel area is located within an existing 24,096 square foot tenant space. Work is to include interior nonbearing walls, interior doors, and interior windows all per the approved drawings and the plan review report on file. Within the remodel area, the location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  1/23/2013 DONE
FIRE-Final Inspection11/3/200411/4/200411/4/2004APASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 11/3/2004 at 3:50:23 PM. Contact: ###-####. Sprinkler spacing okay; fire/life safety okay 11/4/2004 8:24:41 AM
BLD-Final11/3/200411/4/200411/4/2004PPASS
DetailsTroy James
Scheduled by a contractor via Hello! on 11/3/2004 at 3:51:59 PM. Contact: ###-####.
DOC - Permit Finaled11/4/200411/4/200411/4/2004PPASS
DetailsTroy James
Finaled by inspector at 11/4/2004 1:51:35 PM
BLD-Framing/Rough-in10/14/200410/14/200410/14/2004PPASS
DetailsDave Hannah
Scheduled by a contractor via Hello! on 10/14/2004 at 9:11:06 AM. Contact: ###-####.
Inspection Record Card- Bld  9/29/2004 DONE
Issue PAID IN FULL permit  9/29/2004  
Routing - PLAN CHECK9/23/2004 9/27/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/27/2004 DONE
Permit Ready to Issue  9/27/2004 DONE
Inspection Record Card- Bld  9/27/2004 DONE
Telephone call  9/27/2004 DONE
Spoke with Lesa and told her that permit is ready & fees///9/27/04 3:45pm BAS
Plan assigned to (CJW)9/8/2004 9/27/2004 PASS
9/27/2004 08:13:28 CJW - activity updated through activity BLDA022 from case BLD04-02031.
Routing - FIRE9/21/2004 9/23/2004 PASS
Plan Review Completed(1st rev)  9/23/2004 PASS
Routing - PLAN CHECK9/9/2004 9/21/2004 PASS
IBC plan review started September 20, 2004 and finished the next day. The drawings were approved with clarifications. See the plan review report.
Routing - PUBLIC WORKS9/8/2004 9/9/2004 PASS
Plans ACCEPTED BY PLAN TECH  9/7/2004 DONE
Application received  8/31/2004  
Recd Pcfee & Taken To Pln CK  8/31/2004  
Fee Review-notes8/31/20048/31/2004