BLD-Final | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | PASS |
Jim Storey
|
|
|
|
Extend Permit 180 days | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Final | 4/7/2005 | 4/8/2005 | 4/8/2005 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/7/2005 at 7:25:20 AM. Contact: ###-####.
|
DOC - Permit Finaled | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | PASS |
Jim Storey
|
|
|
|
Code Occupancy Approval | | | 4/8/2005 | | PASS |
|
|
|
Compliance met.
|
BLD-Other | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | PASS |
Dave Hannah
|
|
|
fire wall nail inspection please///jay; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Energy code compliance | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 12:26:16 PM. Contact: ###-####.need nail insp on fire wall
|
BLD-Framing/Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 2:50:34 PM. Contact: ###-####. seal return air joist bay/remove foam from b-vent 1/27/2005 9:38:40 AM
|
BLD-Framing/Rough-in | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | NR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 12:31:56 PM. Contact: ###-####.
|
BLD-Conference | 1/4/2005 | 1/4/2005 | 1/4/2005 | P | CANC |
Aimee Hughes
|
|
|
|
BLD-Footing | 11/10/2004 | 11/10/2004 | 11/10/2004 | P | PART |
Lane Manuel
|
|
|
footings only ok
|
Inspection Record Card- Bld | | | 11/2/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Permit Ready to Issue | | | 11/2/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/2/2004 | | DONE |
|
|
|
|
Routing - PLANNING Land Div | 10/29/2004 | | 10/29/2004 | | PASS |
|
|
|
Final Plat of Triangle Park Condominiums recorded on 10/25/04.
|
Case Summary (BLD) | | | 10/29/2004 | | |
|
|
|
|
Plan Review Report | | | 10/29/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/29/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/25/2004 | | 10/29/2004 | | PASS |
|
|
|
Routed to Land Division for approval.
|
Plan assigned to (SAM) | 10/27/2004 | | 10/29/2004 | | PASS |
|
|
|
10/29/2004 14:36:15 SAM - activity updated through activity BLDA022 from case BLD04-02033.
|
Plan Reviewer's activity | | | 10/28/2004 | | DONE |
|
|
|
11:20 I called and talked to Jay Kelly about his plans. I let him know that I had some questions for the engineer and that Dave Abo is still waiting for the plat to be signed. (Dan O. listened)
I called and left a message for John Mortin. I need to know if holdowns are needed for the 8' wall of line 5 and recalc beam B5.
|
Pending Assignment by DJO | 9/1/2004 | | 10/27/2004 | | DONE |
|
|
|
10/27/2004 10:38:16 SAM - activity updated through activity BLDA183 from case BLD04-02033.
|
Routing - PLANNING | 10/25/2004 | | 10/25/2004 | | PASS |
|
|
|
Plans comply with CUP04-06 - approval from Drainage District #3 submitted. Condition of Approval includes compliance with Subdivision Division. Land Division to cover requirement to receive signed plat. kg
|
Routing - PLANNING Land Div | 9/16/2004 | | 9/16/2004 | | FAIL |
|
|
|
Plat needs to be recorded.
|
Routing - PUBLIC WORKS | 9/15/2004 | | 9/15/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 9/15/2004 | | 9/15/2004 | | FAIL |
|
|
|
Need to record Final Plat of Triangle Park Condominium.
|
Routing - PLANNING | 9/14/2004 | | 9/14/2004 | | FAIL |
|
|
|
Plans for buildings are ok, but still need Drainage District #3's approval of drainage plan.
|
Routing - PLANNING | 9/1/2004 | | 9/1/2004 | | FAIL |
|
|
|
CUP04-00006. Need modifications of windows to match approved elevations and garage dimensions to meet minimums. KGallagher
|
Application received | | | 8/31/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 10/25/2004 | | | | |
|
|
|
Routed to Plan check. Land Division approval still need. KG
|