Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02042
StatusFinaled
Name BAUMGART CONSTRUCTION
Site Address 1375 S BROADWAY AVE
Project NameMCDONALD'S
Customer Number 
ePlanReviewNo
Description
(MCDONALD'S) Some exterior and interior remodel, mostly in the dining room area, to an existing 4,892 sq. ft. restaurant building per approved plans. Work to include removing the existing glass solarium on the front of the building, new roof structure with new support beams and steel columns at front of the building, two new exterior shear walls at front of the building, new storefront glazing at front of building, some new roofing work and exterior brick veneer work, new exterior drive-thru windows, some new interior walls, new seating layout in the dining room, new interior finish in the dining room, new suspended ceiling and soffit work in the dining room, new self-service beverage station, some accessible upgrade work, mechanical work, plumbing work, and electrical work. Special Inspection is required for structural field welding, a certificate of compliance for any steel work done in fabricator shop to be provided to inspector in field, expansion and epoxy/adhesive bolts/anchors, and shear wall hold-down installations. A new Certificate of Occupancy is to be issued when completed and approved. NOTE: This building is not fire sprinklered. (PC#0573-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 5/20/200512/14/2005 DONE
Sign off 2004 permits per Jenifer & Rita
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice Sent 12/10/20044/26/2005 DONE
Permanent occupancy  2/24/2005 DONE
Perm. Occ. Cert. # 10460 issued 2-24-05 to McDonald's Restaurant.
BLD-Final2/22/20052/23/20052/23/2005PPASS
DetailsJim Storey
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok card on site.
Code Occupancy Approval2/22/20052/22/20052/22/2005PPASS
DetailsWm. Michael Meloy
Inspection noted that corrections have been made and project is now in compliance. 2/22/2005 4:26:02 PM
Permanent Occupancy 2/22/20052/22/2005 DONE
Details
Code Occupancy Approval  2/15/2005 FAIL
Inspection noted new access route from Broadway to building. Modification of front parking now included two planting areas on either side of the walkway. These planting area have a rock/gravel ground cover. A consultation with Planner Sarah Schafer confirmed that this is not acceptable as the rest of the lanscaping is bark dust. A second planting area where the walkway meets the building had the planting area disturbed leaving bare ground.

Correction notice left on building permit, which was posted on the inside of the lobby on the north glass wall. Also left, was copy of "landscaping" plan with the areas not in compliance circled in red.
BLD-Final2/10/20052/11/20052/11/2005ANR
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 2/10/2005 at 3:51:36 PM. Contact: ###-####. needs code enfor and cdhd 2/11/2005 10:48:35 AM
FIRE-Final Inspection12/21/200412/21/200412/21/2004PPASS
DetailsRick Jackson
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice Verify that a new emergency light is added in NW seating as shown on plans 12/21/2004 11:46:21 AM
BLD-Framing/Rough-in12/10/200412/10/200412/10/2004APART
DetailsDave Hannah
per dave hannah send back ceiling grid ok no notes on plan on spec for grid installer used 97 code with pods also insulation installed in ceiling ok to cover 12/10/2004 10:00:37 AM
DOC - Permit Finaled12/10/200412/10/200412/10/2004APASS
DetailsDave Hannah
Finaled by inspector at 12/10/2004 8:58:16 AM
BLD-Framing/Rough-in12/9/200412/10/200412/10/2004APASS
DetailsDave Hannah
phil Note: suspended ceilings; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--per dave hannah send out again for framing/12/10/04/mls/not done yet
CHANGE STATUS TO (ISS)  12/10/2004 DONE
per dave hannah change status back to "issued" was done in error/12/10/04/mls
BLD-Framing/Rough-in12/3/200412/3/200412/3/2004PPASS
DetailsJim Storey
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice
Issue PAID IN FULL permit  11/12/2004 DONE
Permit Ready to Issue  11/10/2004 DONE
Permit Ready to Issue  11/10/2004 DONE
Inspection Record Card- Bld  11/10/2004 DONE
Print Occupancy Form  11/10/2004 DONE
Telephone call  11/10/2004 DONE
left mess for chris collett at ###-#### that permit is ready
Routing - PLANNING10/28/2004 11/9/2004 PASS
Routing - PLAN CHECK11/9/2004 11/9/2004 PASS
Plans and permit approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/9/2004 PASS
Plan assigned to (JCB)9/8/2004 11/9/2004 PASS
11/9/2004 12:59:11 JCB - activity updated through activity BLDA022 from case BLD04-02042.
Routing - PLAN CHECK10/18/2004 10/28/2004 PEND
Permit approval dependent on approval by Planning for exterior site/parking changes. Plans to route to Sarah Schafer in Planning.
Routing - PLAN CHECK10/14/2004 10/18/2004 PEND
Plan and permit approval is dependent on Planning approval of a required Zoning Certificate for the exterior site changes.
Plan resubmittals received  10/15/2004 DONE
Received Transmittal Letter, 2 Structural Calcs, & 3 Copys of sheets SD1,A4,A5 Taken to Jason B.
Routing - PLANNING10/13/2004 10/14/2004 FAIL
Sarah Schafer.
Called Franklin Ng with Freiheit and Ho. They will be submitting a zoning certificate to address the changes to site design.
Plan resubmittals requested  10/13/2004  
Plan resubmittals and additional structural calculations required.
Routing - PLAN CHECK9/30/2004 10/13/2004 FAIL
Called architect representative Nora Ng concerning some issues to be addressed. Did not receive sheet SD-1 with the resubmittal package. Emergency Lighting was not adequately addressed. Roof insulation/envelope to be addressed. Interior lighting controls/bi-level switching not noted or shown on the plans. Structural calculations need to include calculations for the new steel columns and top and bottom connections and a calculation for the new 3x6 rafters. Plans to route back to Planning because of the exterior site/parking changes.
Plan resubmittals received  10/4/2004 DONE
Received transmittal letter, response letter, two copies of structural calculations and three sets of sheets CV,SP-2,A1,A4,A5, taken to Jason B.
Routing - FIRE9/28/2004 9/30/2004 PASS
1st review completed  9/30/2004 FAIL
failed plan check
Routing - PLUMBING9/24/2004 9/28/2004 PASS
Idaho requires two minimum under slab with an inch and one half vent
Routing - PLANNING9/23/2004 9/24/2004 PASS
Sara Schafer CZC04-00122

This set of building documents is approved. The final design submitted by I-5 in the zoning certificate file is recongnized as the final design which will need a seperate building certificate.
Routing - PLAN CHECK9/9/2004 9/23/2004 FAIL
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Planning, Plumbing, and to the Fire Dept. for review.
Plan resubmittals requested  9/23/2004  
Plan resubmittals and written response required for further review.
Plan resubmittals received  9/22/2004 DONE
Received ESC Permit Application & Waiver Request Taken to Jason B.
Routing - Erosion and Sediment9/22/2004 9/22/2004 PASS
ESC plan waiver request approved, see attached conditions.
Routing - PUBLIC WORKS9/8/2004 9/9/2004 PASS
Plans ACCEPTED BY PLAN TECH  9/7/2004 DONE
Called left voise message for Richard Freiheit that an ESC Application is needed with these plans, and if he had any question to please give me a call....
Application received  9/1/2004  
Recd Pcfee & Taken To Pln CK  9/1/2004  
Fee Review-notes9/1/20049/1/2004