Third Notice | | 5/20/2005 | 12/14/2005 | | DONE |
|
|
|
Sign off 2004 permits per Jenifer & Rita
|
Second Notice BLD | 4/26/2005 | 4/26/2005 | 5/20/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice Sent | | 12/10/2004 | 4/26/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 2/24/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10460 issued 2-24-05 to McDonald's Restaurant.
|
BLD-Final | 2/22/2005 | 2/23/2005 | 2/23/2005 | P | PASS |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore final ok card on site.
|
Code Occupancy Approval | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
Inspection noted that corrections have been made and project is now in compliance. 2/22/2005 4:26:02 PM
|
Permanent Occupancy | | 2/22/2005 | 2/22/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | | | 2/15/2005 | | FAIL |
|
|
|
Inspection noted new access route from Broadway to building. Modification of front parking now included two planting areas on either side of the walkway. These planting area have a rock/gravel ground cover. A consultation with Planner Sarah Schafer confirmed that this is not acceptable as the rest of the lanscaping is bark dust. A second planting area where the walkway meets the building had the planting area disturbed leaving bare ground.
Correction notice left on building permit, which was posted on the inside of the lobby on the north glass wall. Also left, was copy of "landscaping" plan with the areas not in compliance circled in red.
|
BLD-Final | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | NR |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/10/2005 at 3:51:36 PM. Contact: ###-####. needs code enfor and cdhd 2/11/2005 10:48:35 AM
|
FIRE-Final Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | P | PASS |
Rick Jackson
|
|
|
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice Verify that a new emergency light is added in NW seating as shown on plans 12/21/2004 11:46:21 AM
|
BLD-Framing/Rough-in | 12/10/2004 | 12/10/2004 | 12/10/2004 | A | PART |
Dave Hannah
|
|
|
per dave hannah send back ceiling grid ok no notes on plan on spec for grid installer used 97 code with pods also insulation installed in ceiling ok to cover 12/10/2004 10:00:37 AM
|
DOC - Permit Finaled | 12/10/2004 | 12/10/2004 | 12/10/2004 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 12/10/2004 8:58:16 AM
|
BLD-Framing/Rough-in | 12/9/2004 | 12/10/2004 | 12/10/2004 | A | PASS |
Dave Hannah
|
|
|
phil Note: suspended ceilings; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles--per dave hannah send out again for framing/12/10/04/mls/not done yet
|
CHANGE STATUS TO (ISS) | | | 12/10/2004 | | DONE |
|
|
|
per dave hannah change status back to "issued" was done in error/12/10/04/mls
|
BLD-Framing/Rough-in | 12/3/2004 | 12/3/2004 | 12/3/2004 | P | PASS |
Jim Storey
|
|
|
Phil; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Issue PAID IN FULL permit | | | 11/12/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/10/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/10/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/10/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/10/2004 | | DONE |
|
|
|
left mess for chris collett at ###-#### that permit is ready
|
Routing - PLANNING | 10/28/2004 | | 11/9/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/9/2004 | | 11/9/2004 | | PASS |
|
|
|
Plans and permit approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/9/2004 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 9/8/2004 | | 11/9/2004 | | PASS |
|
|
|
11/9/2004 12:59:11 JCB - activity updated through activity BLDA022 from case BLD04-02042.
|
Routing - PLAN CHECK | 10/18/2004 | | 10/28/2004 | | PEND |
|
|
|
Permit approval dependent on approval by Planning for exterior site/parking changes. Plans to route to Sarah Schafer in Planning.
|
Routing - PLAN CHECK | 10/14/2004 | | 10/18/2004 | | PEND |
|
|
|
Plan and permit approval is dependent on Planning approval of a required Zoning Certificate for the exterior site changes.
|
Plan resubmittals received | | | 10/15/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 Structural Calcs, & 3 Copys of sheets SD1,A4,A5 Taken to Jason B.
|
Routing - PLANNING | 10/13/2004 | | 10/14/2004 | | FAIL |
|
|
|
Sarah Schafer.
Called Franklin Ng with Freiheit and Ho. They will be submitting a zoning certificate to address the changes to site design.
|
Plan resubmittals requested | | | 10/13/2004 | | |
|
|
|
Plan resubmittals and additional structural calculations required.
|
Routing - PLAN CHECK | 9/30/2004 | | 10/13/2004 | | FAIL |
|
|
|
Called architect representative Nora Ng concerning some issues to be addressed. Did not receive sheet SD-1 with the resubmittal package. Emergency Lighting was not adequately addressed. Roof insulation/envelope to be addressed. Interior lighting controls/bi-level switching not noted or shown on the plans. Structural calculations need to include calculations for the new steel columns and top and bottom connections and a calculation for the new 3x6 rafters. Plans to route back to Planning because of the exterior site/parking changes.
|
Plan resubmittals received | | | 10/4/2004 | | DONE |
|
|
|
Received transmittal letter, response letter, two copies of structural calculations and three sets of sheets CV,SP-2,A1,A4,A5, taken to Jason B.
|
Routing - FIRE | 9/28/2004 | | 9/30/2004 | | PASS |
|
|
|
|
1st review completed | | | 9/30/2004 | | FAIL |
|
|
|
failed plan check
|
Routing - PLUMBING | 9/24/2004 | | 9/28/2004 | | PASS |
|
|
|
Idaho requires two minimum under slab with an inch and one half vent
|
Routing - PLANNING | 9/23/2004 | | 9/24/2004 | | PASS |
|
|
|
Sara Schafer CZC04-00122
This set of building documents is approved. The final design submitted by I-5 in the zoning certificate file is recongnized as the final design which will need a seperate building certificate.
|
Routing - PLAN CHECK | 9/9/2004 | | 9/23/2004 | | FAIL |
|
|
|
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Planning, Plumbing, and to the Fire Dept. for review.
|
Plan resubmittals requested | | | 9/23/2004 | | |
|
|
|
Plan resubmittals and written response required for further review.
|
Plan resubmittals received | | | 9/22/2004 | | DONE |
|
|
|
Received ESC Permit Application & Waiver Request Taken to Jason B.
|
Routing - Erosion and Sediment | 9/22/2004 | | 9/22/2004 | | PASS |
|
|
|
ESC plan waiver request approved, see attached conditions.
|
Routing - PUBLIC WORKS | 9/8/2004 | | 9/9/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/7/2004 | | DONE |
|
|
|
Called left voise message for Richard Freiheit that an ESC Application is needed with these plans, and if he had any question to please give me a call....
|
Application received | | | 9/1/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2004 | | |
|
|
|
|
Fee Review-notes | 9/1/2004 | 9/1/2004 | | | |
|
|
|
|