Third Notice BLD | 12/6/2005 | 12/6/2005 | 12/13/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/20/2005 | 9/20/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/11/2005 | 9/20/2005 | | DONE |
|
|
|
|
Code Occupancy Approval | 8/16/2005 | 8/16/2005 | 8/16/2005 | P | PASS |
Dena Gambrel
|
|
|
08-10-05 Passed Inspection
|
BLD-Final | 8/10/2005 | 8/11/2005 | 8/11/2005 | A | PASS |
Tom Arcoraci
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm
|
Permanent occupancy UNPAID FEE | | | 8/11/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10688 issued 8-11-05 to McDonald's Restaurant.
|
Permanent Occupancy | | 8/10/2005 | 8/10/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/8/2005 | 8/9/2005 | 8/9/2005 | A | PASS |
Forrest France
|
|
|
Life safety passed inspection.
|
BLD-Framing/Rough-in | 8/5/2005 | 8/8/2005 | 8/8/2005 | A | PASS |
Tom Arcoraci
|
|
|
grid inspection//rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Energy code compliance | 7/26/2005 | 7/27/2005 | 7/27/2005 | A | PASS |
Tom Arcoraci
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/20/2005 | 7/20/2005 | 7/20/2005 | P | PART |
Tom Arcoraci
|
|
|
ok to insulate after other rough ins are done
|
BLD-Framing/Rough-in | 7/19/2005 | 7/20/2005 | 7/20/2005 | A | CANC |
Tom Arcoraci
|
|
|
rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Framing/Rough-in | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PASS |
Jim Storey
|
|
|
sheer wall ok
|
BLD-Framing/Rough-in | 7/11/2005 | 7/12/2005 | 7/12/2005 | A | NR |
Jim Storey
|
|
|
shear wall//rod; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 6/27/2005 | 6/28/2005 | 6/28/2005 | A | PASS |
Tom Arcoraci
|
|
|
under slab insulation inspection//concrete is being poured at 10am///rod ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD-Foundation | 6/7/2005 | 6/7/2005 | 6/7/2005 | P | PASS |
Tom Arcoraci
|
|
|
rob ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Footing | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | PASS |
Tom Arcoraci
|
|
|
rod ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need change for door and roof from arch
|
BLD-Conference | 5/13/2005 | 5/16/2005 | 5/16/2005 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - rod Note: please 1/2 hr prior to conference ok for mono pour
|
(F) Reprint permit | | | 5/4/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 5/4/2005 | | DONE |
|
|
|
|
Print Occupancy Form | | | 5/4/2005 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 3/31/2005 | 3/31/2005 | 4/12/2005 | | PASS |
|
|
|
4/12/2005 09:54:22 CJW - activity updated through activity BLDA022 from case BLD04-02044.
|
Routing - PLANNING | 4/8/2005 | | 4/12/2005 | | PASS |
|
|
|
Sent to Sarah. - Appoved. Changes include the removal of the new office space. New drive up window is in the same basic configuration as originally proposed.
|
Routing - PLAN CHECK | 4/12/2005 | | 4/12/2005 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/12/2005 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 4/12/2005 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/12/2005 | | DONE |
|
|
|
changed back to issued because this is a plan mod/already pd/mls
|
Telephone call | | | 4/12/2005 | | DONE |
|
|
|
talked to chris collett at ###-#### is ready & need achd because of increase of s.f.
|
Routing - PLAN CHECK | 3/31/2005 | | 4/8/2005 | | PASS |
|
|
|
Plan modification approved.
|
Plan Modification Accepted | | | 3/31/2005 | | |
|
|
|
Plan Modification*** Plan Modification to change building addition to wood in lieu of block. Remove the office addition under tghe mansard by the existing drive thru window. Provide a stucco finish for the entire building.Sheet # CV,SP-2,A1,A2,A2.1,A2.2,A3,A4,A5,A6,A7,S1.0,S2.0,S3.0,S3.1,S3.2 Plans routed to Carl W.
|
BLD-Framing/Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 | P | PART |
Lane Manuel
|
|
|
###-#### Justin
bathroom framing ok 1/24/2005 2:49:46 PM
|
BLD-Framing/Rough-in | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PART |
Tom Arcoraci
|
|
|
justin; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie dinning areaok 1/7/2005 10:42:13 AM
|
Issue PAID IN FULL permit | | | 12/29/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/27/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/27/2004 | | |
|
|
|
|
Print Occupancy Form | | | 12/27/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/27/2004 | | DONE |
|
|
|
Left message for Chris that permit is ready & fees///11:10am 12/27/04 BAS
|
Plan assigned to (CJW) | 11/22/2004 | | 12/23/2004 | | PASS |
|
|
|
12/23/2004 10:33:25 CJW - activity updated through activity BLDA022 from case BLD04-02044.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/23/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/13/2004 | | 12/23/2004 | | PASS |
|
|
|
The drawings were approved after the resubmittal review.
|
Plan resubmittals received | | | 12/22/2004 | | |
|
|
|
Received Transmittal Letter, 2 Structural Calcs, 2 Copys of sheets A1,A2,A6 Taken to Carl Westfall
|
Routing - FIRE | 12/8/2004 | | 12/13/2004 | | PASS |
|
|
|
review faxed to architect.
|
1st review completed | | | 12/13/2004 | | FAIL |
|
|
|
failed Plan Tech and Plan check.
|
Routing - PLAN CHECK | 11/26/2004 | | 12/8/2004 | | FAIL |
|
|
|
Failed 1st IBC plan review. The IBC plan review was started on December 7, 2004 and was finished the next day. A response from the architect was required. See the plan review report.
|
Routing - PLANNING | 11/24/2004 | | 11/26/2004 | | PASS |
|
|
|
Scott Spjute CUP04-00121
Sarah Schafer CZC04-00121
Reviewed and approved per both CUP04-121 and CZC04-173. SMS
|
Routing - PUBLIC WORKS | 11/23/2004 | | 11/24/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 11/24/2004 | | 11/24/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLUMBING | 11/24/2004 | | 11/24/2004 | | PASS |
|
|
|
two inch minimum dwv under slab or underground with inch and one half vent---sht A7 pn-05
|
Plans ACCEPTED BY PLAN TECH | | | 11/22/2004 | | PASS |
|
|
|
Both conditional use and zoning certificate are now complete. Plans can not begin circulation.
|
Plans ACCEPTED BY PLAN TECH | | | 9/1/2004 | | FAIL |
|
|
|
FAILED. This building needs a conditional use and and approval from design review. Do not circulate until these items are completed by Planning.
|
Application received | | | 9/1/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2004 | | |
|
|
|
|
Fee Review-notes | 9/1/2004 | 9/1/2004 | | | |
|
|
|
|