Third Notice BLD | 12/7/2005 | 12/7/2005 | 12/29/2005 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice | | 5/20/2005 | 12/7/2005 | | DONE |
|
|
|
|
First Notice | | 4/28/2005 | 5/20/2005 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/28/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10561 issued 4-28-05 to Bishop Kelly High school for the concession bldg.
|
BLD-Final | 4/26/2005 | 4/27/2005 | 4/27/2005 | P | PASS |
Tom Arcoraci
|
|
|
randy; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm
|
FIRE-Final Inspection | 4/26/2005 | 4/27/2005 | 4/27/2005 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled
|
Code Occupancy Approval | 4/26/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Scott M.Brown
|
|
|
OK FINAL SIGNED OFF 4/26/2005 4:01:05 PM
|
Permanent Occupancy | | 4/26/2005 | 4/26/2005 | | DONE |
|
|
|
|
FIRE-Final Inspection | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | FAIL |
Troy Cobbley
|
|
|
Provide approved hardware on the restroom doors and mount/tag the fire extinguishers
|
BLD-Framing/Rough-in | 4/1/2005 | 4/4/2005 | 4/4/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/1/2005 at 2:28:53 PM. Contact: ###-####. pending mech 4/4/2005 9:44:02 AM
|
BLD-Foundation | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/22/2005 at 1:57:18 PM. Contact: ###-####.
|
BLD-Foundation | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | PASS |
Troy James
|
|
|
|
BLD-Footing | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 9:50:42 AM. Contact: ###-####.
|
BLD-Aging Inspection | 1/20/2005 | 1/20/2005 | 1/20/2005 | | NR |
Tom Arcoraci
|
|
|
|
(F) Reprint permit | | | 10/22/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/21/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/20/2004 | | DONE |
|
|
|
Left message for Scott Henson that permit is ready, fees, that we nned Rp Info and ACHD Info///10/20/04 9:00am BAS
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/19/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/19/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/19/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/8/2004 | | 10/19/2004 | | PASS |
|
|
|
10/19/2004 09:25:23 MLO - activity updated through activity BLDA022 from case BLD04-02049.
|
Routing - PLAN CHECK | 10/18/2004 | | 10/18/2004 | | PASS |
|
|
|
|
Routing - PLUMBING | 10/18/2004 | | 10/18/2004 | | PASS |
|
|
|
no blow out tees upstream of backflow preventors, use gravity drain below and blow out tee downstream of dcva. max water temp is 120 deg.
|
Routing - PLAN CHECK | 10/1/2004 | | 10/1/2004 | | PEND |
|
|
|
|
Routing - FIRE | 9/28/2004 | | 9/30/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 9/27/2004 | | 9/28/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 9/28/2004 | | DONE |
|
|
|
remaining corrections from 9-20
|
Plan resubmittals received | | | 9/24/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Sets of A2.0,A2.2,M1.1 & 3 Copys of A1.1 Taken to Mike Otto @ 4:10 PM...
|
Plan Review Completed(1st rev) | | | 9/23/2004 | | FAIL |
|
|
|
failed plan check, plumbing and fire.
|
Routing - FIRE | 9/20/2004 | | 9/23/2004 | | FAIL |
|
|
|
lacks hyd and FD access info.
|
Plan resubmittals received | | | 9/21/2004 | | DONE |
|
|
|
Received letter of transmittal,plumbin plan review sheet with, one C1.0 sheet taken to Mike O.
|
Plan resubmittals requested | | | 9/20/2004 | | FAIL |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 9/15/2004 | | 9/20/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 9/14/2004 | | 9/15/2004 | | PASS |
|
|
|
CZC04-00158 Susan Riggs
|
Routing - PLUMBING | 9/14/2004 | | 9/14/2004 | | FAIL |
|
|
|
provide mixing valves to limit hot water to public lavs to 120 deg. from the water heater that provides 140 deg water to the kitchen. provide a plan showing the size and location of the sewer and water services to verify sizing.
|
Routing - Erosion and Sediment | 9/13/2004 | | 9/14/2004 | | PASS |
|
|
|
ESC approved with attached conditions. Need to notify Boise City prior to start of construction with rp information.
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
Received letter of transmittal with two ESC narratives put with plans.
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
Received two esc plans taken to Mike Otto.
|
Routing - PUBLIC WORKS | 9/8/2004 | | 9/13/2004 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 9/8/2004 | | 9/8/2004 | | PASS |
|
|
|
Site is over 5 acres in size.
|
Plans ACCEPTED BY PLAN TECH | | | 9/8/2004 | | FAIL |
|
|
|
Needs ESC plan and narrative Architect is working on getting this done. Will start routing plans.
|
Plan routing begun/NEW & ADDTN | | | 9/8/2004 | | |
|
|
|
|
Application received | | | 9/1/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/1/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/1/2004 | 9/1/2004 | | | |
|
|
|
|
Routing - PLAN CHECK | 9/23/2004 | | | | PEND |
|
|
|
|