BLD-Final | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | PASS |
Troy James
|
|
|
|
DOC - Permit Finaled | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | PASS |
Troy James
|
|
|
Finaled by inspector at 2/16/2005 3:12:32 PM
|
BLD-Final | 2/13/2005 | 2/14/2005 | 2/14/2005 | P | FAIL |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: Greg Fisher
need plumbing permits and public works finaled. 2/14/2005 2:20:31 PM
|
BLD-Framing/Rough-in | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PASS |
Troy James
|
|
|
Contact Greg with any questions.; Phone #: ###-#### Internet Inspection Request from: Greg Fisher
ok to cover left c/n to complete nailing of truss hangers 12/2/2004 4:02:46 PM
|
BLD-Foundation | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 9:36:32 AM. Contact: ###-####.
|
BLD-Footing | 9/24/2004 | 9/27/2004 | 9/27/2004 | P | PART |
Troy James
|
|
|
Lee Centers Concrete has asked for a late afternoon inspection. They will try to pour about 4 if all is well. Thanks a bunch. Greg; Phone #: ###-#### Internet Inspection Request from: Greg Fisher
wip 9/27/2004 4:09:06 PM
|
BLD-Grading Inspection | 9/23/2004 | 9/23/2004 | 9/23/2004 | | DONE |
|
|
|
Subgrade soils have been approved by the geotechnical engineer provided that all loose soil disturbed during placemnt of forms is removed or recompacted
|
Plan assigned to (PEP) | 9/1/2004 | 9/1/2004 | 9/16/2004 | | PASS |
|
|
|
9/16/2004 13:32:39 PEP - activity updated through activity BLDA022 from case BLD04-02052.
|
Case Summary (BLD) | | | 9/16/2004 | | |
|
|
|
|
Plan Review Report | | | 9/16/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/16/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/16/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/16/2004 | | DONE |
|
|
|
|
Routing - PLANNING | 9/2/2004 | | 9/3/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/3/2004 | | 9/3/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan Reviewer's activity | | | 9/3/2004 | | |
|
|
|
called left message for Greg Fisher, 3-sets of plans are to be submitted, and foundation engineering is required for the hillside area. ###-#### pep 9/3/2004 9/3/2004....Greg returned call and requirements were explained that hillside engineering was a requirement subject to map placement. pep 9.3.2004
|
Routing - PUBLIC WORKS GRADING | 9/2/2004 | | 9/2/2004 | | PASS |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling the footing inspection
|
Application received | | | 9/1/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 9/3/2004 | | | | |
|
|
|
Perry P.
|