DOC - Permit Finaled | 3/18/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Dave Hannah
|
|
|
Finaled by inspector at 3/18/2005 9:42:07 AM
|
BLD-Final | 3/16/2005 | 3/16/2005 | 3/16/2005 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/16/2005 at 9:28:03 AM. Contact: ###-####.
c/n posted 3/16/2005 1:59:44 PM
|
BLD-Final | 3/11/2005 | 3/11/2005 | 3/11/2005 | P | PASS |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | CANC |
Tony Young
|
|
|
please call prior to inspection so he can meet ya there///mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PART |
Tony Young
|
|
|
please call prior to inspection so he can meet ya there///mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
w/ contractor, owner on final issues,,, some insulation was not in garage warm wall 3/3/2005 11:58:31 AM
|
BLD-Final | 2/25/2005 | 2/25/2005 | 2/25/2005 | P | NR |
Tony Young
|
|
|
please call prior to inspection so he can meet ya there///mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Conference | 2/24/2005 | 2/24/2005 | 2/24/2005 | A | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 10:49:33 AM. Contact: ###-####.
|
BLD-Final | 2/23/2005 | 2/23/2005 | 2/23/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 10:49:33 AM. Contact: ###-####.
|
BLD-Final | 2/22/2005 | 2/22/2005 | 2/22/2005 | P | NR |
Tony Young
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Final | 2/16/2005 | 2/16/2005 | 2/16/2005 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 2/16/2005 at 8:34:14 AM. Contact: ###-####.
|
BLD-Energy code compliance | 12/16/2004 | 12/16/2004 | 12/16/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 11:16:18 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 12/16/2004 | 12/16/2004 | 12/16/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/16/2004 at 11:16:53 AM. Contact: ###-####.
need letter of fix on firewall,,,, ok to insulate 12/17/2004 1:35:31 PM
|
BLD-Framing/Rough-in | 11/30/2004 | 11/30/2004 | 11/30/2004 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/30/2004 at 11:09:13 AM. Contact: ###-####.
partial c/n posted,,, need to finish f/wall and furr downs 11/30/2004 4:04:00 PM
|
BLD-Wall cover | 11/2/2004 | 11/2/2004 | 11/2/2004 | P | PASS |
Alan Hauser
|
|
|
seperation walls are nailed off and fire blocked 11/2/2004 3:22:55 PM
|
BLD-Footing | 10/15/2004 | 10/15/2004 | 10/15/2004 | P | PART |
Tony Young
|
|
|
andy; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/12/2004 at 10:55:05 AM. Contact: ###-####.
need setback proprty lines marked or found,,, also get all roots out of hole 10/12/2004 2:00:17 PM
|
Issue PAID IN FULL permit | | | 10/12/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/8/2004 | | DONE |
|
|
|
|
Telephone call | | | 10/8/2004 | | DONE |
|
|
|
left mess that permit is ready
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/7/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 9/9/2004 | | 10/7/2004 | | PASS |
|
|
|
|
Plan assigned to (SAM) | 9/17/2004 | | 10/7/2004 | | PASS |
|
|
|
10/7/2004 13:21:22 SAM - activity updated through activity BLDA022 from case BLD04-02061.
|
Case Summary (BLD) | | | 10/5/2004 | | |
|
|
|
|
Plan Review Report | | | 10/5/2004 | | |
|
|
|
|
Plan resubmittals received | | | 10/1/2004 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/17/2004 | | DONE |
|
|
|
11:15 I called and talked to Ammon. I let him know that I need wall bracing shown for the first and second floor with engineering on the front of the house. I need details of the separation wall, footing sizes and a new foundation plan showing slab on grade. Plans are on hold.
|
Pending Assignment by DJO | 9/3/2004 | | 9/17/2004 | | DONE |
|
|
|
9/17/2004 07:50:50 SAM - activity updated through activity BLDA183 from case BLD04-02061.
|
Routing - PUBLIC WORKS | 9/7/2004 | | 9/8/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 9/7/2004 | | 9/7/2004 | | PASS |
|
|
|
Approved as redlined. Applicant agreed to redline information over the phone. At the 20' setback the driveway width can be a maximum of 28'-8". There still needs to be a 20' depth on the parking stall outside of the garage.
|
Application received | | | 9/3/2004 | | |
|
|
|
|
Routing - PLANNING | 9/3/2004 | | 9/3/2004 | | FAIL |
|
|
|
Does not comply with condition 6 of CAA03-316. Condition requires that driveway does not exceed the width of 30' or 60% of the lots width at the 20' setback. Width at 20' setback line is 35' and only 28'-8" is allowed. Have tried to contact applicant several times but the line is busy. I will keep trying.
|