Third Notice BLD | 9/22/2008 | 9/22/2008 | 4/3/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 4/15/2008 | 4/15/2008 | 8/11/2008 | | DONE |
Tom Arcoraci
|
|
|
|
DOC - Permit Finaled | 4/15/2008 | 4/15/2008 | 4/15/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/18/2008 | 2/18/2008 | 2/19/2008 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/19/2007 | 12/19/2007 | 12/19/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/19/2007 | 10/19/2007 | 10/19/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 8/17/2007 | 8/17/2007 | 8/17/2007 | | CANC |
Tom Arcoraci
|
|
|
|
(F) Reprint permit | | | 8/10/2007 | | |
|
|
|
|
BLD-Aging Inspection | 6/12/2007 | 6/12/2007 | 6/18/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/10/2007 | 4/10/2007 | 4/10/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 1/16/2007 | 1/16/2007 | 1/16/2007 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 11/15/2006 | 11/15/2006 | 11/15/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 9/13/2006 | 9/13/2006 | 9/13/2006 | | PASS |
Tom Arcoraci
|
|
|
|
Plan Reviewer's activity | | | 7/28/2006 | | DONE |
|
|
|
McCarthy Building Companies provided a copy of a 2-hour perimeter fire containment system U.L. CW-S-2003 for use at the cutain wall and edge of 2-hour floor as part of plan review condition #18 of review done by John Menard. The assembly is approved when the entire system is installed and uses all the components of the listed system. The minimum vision panel of the listing is 1/4 heat strengthed glass. John Says they will still use the one inch glass originally approved whicj is two layers of glass with 1/2" air space between, which exceeds the system requirement. Copy of approval with this stipulation was faxed to John Knauf at McCarthy. The curtain wall system is Wausau as listed in spec book. Previous perimeter fire containment submitted and now to be changed was CW-D-2044.
|
BLD-Aging Inspection | 7/10/2006 | 7/10/2006 | 7/10/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 4/10/2006 | 4/10/2006 | 4/10/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 2/6/2006 | 2/6/2006 | 2/6/2006 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 12/5/2005 | 12/5/2005 | 12/7/2005 | | PASS |
Tom Arcoraci
|
|
|
|
BLD-Aging Inspection | 10/3/2005 | 10/3/2005 | 10/10/2005 | | NR |
Tom Arcoraci
|
|
|
wip
|
BLD-Aging Inspection | 8/1/2005 | 8/1/2005 | 8/1/2005 | | PASS |
Tom Arcoraci
|
|
|
wip
|
Issue PAID IN FULL permit | | | 5/2/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/19/2005 | | DONE |
|
|
|
Spoke with Jeff and told him that permit is ready & fees///4/19/05 8:05am BAS
|
Plan assigned to (JCM) | 9/9/2004 | 9/9/2004 | 4/18/2005 | | PASS |
|
|
|
4/18/2005 11:44:11 JCM - activity updated through activity BLDA022 from case BLD04-02068.
|
Routing - PLAN CHECK | 4/1/2005 | | 4/18/2005 | | |
|
|
|
|
Routing - PLANNING Land Div | 4/18/2005 | | 4/18/2005 | | PASS |
|
|
|
Approved as Parcel "D" on ROS03-00035. ROS 6528 recorded on June 6, 2004. Last Notice of Buildable Parcel recorded on March 18, 2005.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/18/2005 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 4/18/2005 | | 4/18/2005 | | PASS |
|
|
|
|
Permit Ready to Issue | | | 4/18/2005 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 4/18/2005 | | DONE |
|
|
|
|
Telephone call | | | 4/18/2005 | | DONE |
|
|
|
Spoke with Cheryl and asked her to have Jeff call///4/18/05 BAS
|
Routing - FIRE | 3/29/2005 | | 4/1/2005 | | PASS |
|
|
|
approved per revised scope. revised review faxed to architect.
|
Routing - PLAN CHECK | 11/5/2004 | | 3/29/2005 | | PASS |
|
|
|
The scope of work for Package #3 has been reduced to only include installation of the exterior cladding. JCM
|
Plan resubmittals received | | | 3/22/2005 | | DONE |
|
|
|
Received Transmittal & 2 Copys of sheet G-003-3 Taken to John M.
|
Routing Off Site - STRUCTURAL | 3/14/2005 | | 3/21/2005 | | PASS |
|
|
|
Sent structural calcs. for exterior wall cladding. Approved except calcs. were not stamped. JCM
|
Plan resubmittals received | | | 2/4/2005 | | DONE |
|
|
|
Recvd 1 copy of memo with 89 code year envelope compliance certificate; 1 copy wind load calcs; dx fastener technical data;3 copies of A-201-3, A-203-3, A-204-3, A-206-3, A-455-3, A-456-3, A-460-3, A-461-3, A-602-3, A103-BX-3, A-103-CX-3, A-110BX-3, A-100EX-3, A-111BX-3, A-111EX-3, S-110B, S110E, S111B, S111E, S-202, S-203, S-204; 2 copies of A-404-3, A-409-3, A-414-3, A-423-3, A-424-3, A-110BX-3, A-110EX-3, ED-102E-3, S-508, S-509; 4 copies of A-202-3; 2 copies of A-209-3, A-420-3, A-425-3, A-426-3, A462-3; 2 copies of Architects supplemntal instructions, 2 copies of Addendum number 1; 2 copies of Addendum number 2 taken to John Menard
|
Routing - FIRE | 10/29/2004 | | 11/5/2004 | | FAIL |
|
|
|
lacks smoke proof stair enclosure and FD roof access. Review faxed to architect.
|
1st review completed | | | 11/5/2004 | | FAIL |
|
|
|
failed planning Land div, Plan check and Fire.
|
Plan resubmittals requested | | | 11/1/2004 | | DONE |
|
|
|
e-mailed the architect a copy of the plan review comment list requesting revisions. JCM
|
Routing - PLAN CHECK | 10/1/2004 | | 10/29/2004 | | FAIL |
|
|
|
John Menard
|
Routing - PLANNING | 9/20/2004 | | 10/1/2004 | | PASS |
|
|
|
Approved per DRH04-55.
|
Routing - PLUMBING | 9/17/2004 | | 9/20/2004 | | PASS |
|
|
|
no plumbing
|
Routing - PUBLIC WORKS | 9/15/2004 | | 9/17/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/17/2004 | | 9/17/2004 | | PASS |
|
|
|
ESC approved with attached conditions. Refer to master plan for erosion under ESC04-00445.
|
Routing - PLANNING Land Div | 9/9/2004 | | 9/15/2004 | | FAIL |
|
|
|
Still need copies of recorded Notice of Buildable Parcels, recorded deeds and new tax parcel #'s. Called Jeff Cramer of HDR on 9/15/04 ###-####.
|
Plan routing begun/NEW & ADDTN | | | 9/9/2004 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/9/2004 | | DONE |
|
|
|
Ok per Brian Murphy to submit plans as they are. Called Jeff Cramer, left voise message that per Steve Webb he will need to re-submit ESC plan,as well as an Application...Ok per John Menard to send to out side eng,with out structural calcs as they should already have them... No ELE value on cert of value but plans show ele being done...No ELE compliance.....
|
Application received | | | 9/3/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/3/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/3/2004 | 9/3/2004 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/9/2004 | | | | |
|
|
|
Called PDQ for pick up...
|