(F) Reprint permit | | | 3/13/2007 | | |
|
|
|
|
(F) Reprint permit | | | 8/23/2006 | | DONE |
|
|
|
|
Letter of compliance | | | 5/11/2005 | | DONE |
|
|
|
Letter of Compliance issued 5-11-05.
|
Code Occupancy Approval | | | 5/10/2005 | | PASS |
|
|
|
Compliance met per approval of Sarah Schafter
|
BLD-Final | 5/6/2005 | 5/9/2005 | 5/6/2005 | A | CANC |
Jim Storey
|
|
|
brett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore--cancel per brett hollingsworth/5/6/05
|
FIRE-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Troy Cobbley
|
|
|
life safety finaled 3/10/2005 11:06:35 AM
|
FIRE-Final Inspection | 3/10/2005 | 3/10/2005 | 3/10/2005 | A | PASS |
Troy Cobbley
|
|
|
Fire life safety finaled
|
FIRE-Final Inspection | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | FAIL |
Troy Cobbley
|
|
|
relocate duct detectors as discussed 3/9/2005 2:46:55 PM
|
BLD-Final | 3/9/2005 | 3/9/2005 | 3/9/2005 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 8:05:04 AM.
|
FIRE-Final Inspection | 3/1/2005 | 3/2/2005 | 3/2/2005 | A | FAIL |
Troy Cobbley
|
|
|
Remove keyed hardware from the north facing exterior door. Provide address numbers per review note #2. Provide fire extinguisher per review note #3. Provide max load sign per review note #9. Provide duct smoke detectors per review note #22 3/2/2005 2:29:07 PM
|
BLD-Wall cover | 1/26/2005 | 1/26/2005 | 1/26/2005 | P | PASS |
Tom Arcoraci
|
|
|
john; Phone #: ###-#### Internet Inspection Request from: Barbara Moore insul ok 1/26/2005 1:46:21 PM
|
BLD-Framing/Rough-in | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | PASS |
Jim Storey
|
|
|
Brett; Phone #: ###-#### Internet Inspection Request from: Jan Rice framing ok pending insulation/and ele ri 12/30/2004 10:49:30 AM
|
BLD-Framing/Rough-in | 12/27/2004 | 12/28/2004 | 12/28/2004 | P | CANC |
Jim Storey
|
|
|
brent; Phone #: ###-#### Internet Inspection Request from: Barbara Moore///Cancelled per Brett at 12:41pm
|
BLD-Framing/Rough-in | 12/23/2004 | 12/23/2004 | 12/23/2004 | P | PART |
Jim Storey
|
|
|
brett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore sheer west end 12/23/2004 2:40:37 PM
|
BLD-Footing | 11/18/2004 | 11/18/2004 | 11/18/2004 | P | PASS |
Jim Storey
|
|
|
Brett; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes trash encloser ft. 11/18/2004 10:33:03 AM
|
BLD-Foundation | 11/10/2004 | 11/10/2004 | 11/10/2004 | P | PART |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 11/10/2004 at 8:03:35 AM. Contact: ###-####.
footings ok 11/9/04, w/ ufer.
stemwalls ok 11/10/04 11/10/2004 12:06:01 PM
|
(F) Reprint permit | | | 11/9/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/3/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/3/2004 | | |
|
|
|
|
Telephone call | | | 11/3/2004 | | DONE |
|
|
|
Left message for Doug that permit is ready & fees///8:30am 11/03/04 BAS
|
Routing Off Site - STRUCTURAL | 11/2/2004 | | 11/2/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
received fax on plate detail which still does not match the engineering calculations. Called architect and went over differences. MLO
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
Received transmittal letter with two A7.1 sheets taken to Mike O.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/2/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/13/2004 | | 11/2/2004 | | PASS |
|
|
|
11/2/2004 13:56:45 MLO - activity updated through activity BLDA022 from case BLD04-02124.
|
Routing Off Site - STRUCTURAL | 10/27/2004 | | 11/1/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 10/28/2004 | | 11/1/2004 | | PASS |
|
|
|
Routed to S.S. for DRH review.
Per CUP03-122 and CUP04-10, plans comply.kg
Approved per DRH04-00004 and as noted on sheet A1.0. Landscape between drive through window and road shall be a privet hedge that will block lights of traffic in the drive through lanes.
|
Routing - PLAN CHECK | 11/1/2004 | | 11/1/2004 | | PEND |
|
|
|
waiting for structural resub
|
Routing - PLUMBING | 10/28/2004 | | 10/28/2004 | | PASS |
|
|
|
approved per plan and 2003 UPC
exterior sewer and water only
|
Routing - PUBLIC WORKS | 10/27/2004 | | 10/28/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/27/2004 | | 10/27/2004 | | PASS |
|
|
|
|
Routing - FIRE | 10/26/2004 | | 10/26/2004 | | PASS |
|
|
|
resubmittal acceptable
|
Plan resubmittals received | | | 10/26/2004 | | DONE |
|
|
|
received additional calculations, new certificate of value and statement from architect that mech. to be done under T.I.
|
Plan resubmittals received | | | 10/25/2004 | | DONE |
|
|
|
Water information faxed from architect.
|
Routing - PLAN CHECK | 10/12/2004 | | 10/22/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals received | | | 10/19/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheet EN-1 Taken to Mike Otto...
|
Plan resubmittals received | | | 10/11/2004 | | DONE |
|
|
|
Received response letter with mechanical compliance on 81/2 X 11 paper, three sets of sheets A0.0,A1.0,A1.1,A2.0,A2.1,A2.2,A2.3,A4.1,A4.3,A5.1,A5.2,A6.1,A6.2,A7.1, taken to Mike Otto.
|
1st review completed | | | 10/4/2004 | | FAIL |
|
|
|
failed plan tech, planning, public works, plumbing, plan check, and fire.
|
Routing - PLAN CHECK | 10/4/2004 | | 10/4/2004 | | |
|
|
|
|
Routing - FIRE | 9/30/2004 | | 10/4/2004 | | FAIL |
|
|
|
need hydrant location. Advised architect by phone; she will fax info tomorrow.
|
Routing - PLAN CHECK | 9/24/2004 | | 9/29/2004 | | FAIL |
|
|
|
To meet with architect to go over corrections on 10/5.
|
Plan resubmittals received | | | 9/29/2004 | | DONE |
|
|
|
Received transmittal with two copies of sheet A1.0 taken to Mike Otto.
|
Plan resubmittals received | | | 9/24/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of C1.0 Taken to Mike Otto...
|
Routing - PLANNING | 9/23/2004 | | 9/24/2004 | | FAIL |
|
|
|
DRH04-00004 Routed to Sarah Schafer on 9-24.
CUP04-00010 KGallagher. Plans do not meet conditions 1 and 2 of CUP03-122 and CUP04-10.
DR Fail. - Still working out details of the DR mod.
|
Routing - PLUMBING | 9/22/2004 | | 9/23/2004 | | FAIL |
|
|
|
Need sewer and water locations and sizing
|
Routing - PUBLIC WORKS | 9/16/2004 | | 9/22/2004 | | FAIL |
|
|
|
No sewer information provided: Contact Jim Pardy at ###-####
|
Routing - Erosion and Sediment | 9/22/2004 | | 9/22/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 9/14/2004 | | 9/16/2004 | | PASS |
|
|
|
Lot 4, Block 1 of Eastgate Shopping Center.
|
Plans ACCEPTED BY PLAN TECH | | | 9/15/2004 | | DONE |
|
|
|
|
Plan resubmittals received | | | 9/15/2004 | | DONE |
|
|
|
Received letter of transmittal, O&Manual, and drainage calcs. put with plans.
|
Plan resubmittals received | | | 9/14/2004 | | DONE |
|
|
|
Received by Fax the fire flow sheet put with plans.
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2004 | | FAIL |
|
|
|
Needs Drainage Calcs, 2-O&M manuals, Fire Flow from United Water. Elizabeth is working on geting these items.
|
Fee Review-notes | 9/13/2004 | 9/13/2004 | 9/13/2004 | | DONE |
|
|
|
|
Application received | | | 9/13/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2004 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 9/13/2004 | | | | |
|
|
|
contacted PDQ for outside pickup.
|