Permit Information
Permit NumberBLD04-02128
StatusFinaled
Name DAVE MILLER
Site Address 6112 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
(VERN WARD - NO TENANT - ACCESSIBLE UPGRADE) (11-1-04) THE PLANS WERE MODIFIED. ONLY ONE WINDOW AND ONE DOOR WILL BE REPLACED WITH MASONRY BLOCK. ALL OTHER WINDOWS WILL BE REPLACED WITH NEW GLASS WINDOW UNITS HAVING A U-FACTOR OF .37 AND A SHGC OF .67. (PLAN MODIFICATION)(6-07-05) TO REPLACE EXISTING LIGHTING SYSTEM PER APPROVED PLANS. This building is NOT fire sprinklered. To construct a restroom accessible to the disabled within an existing 3,567 square foot retail sales building. Other work includes infilling 2 exterior openings with masonry block, installing a new front door, and constructing new interior landings and ramps at 2 exterior doors. All work shall comply with the approved drawings and the plan review report on file. This permit is NOT intended to establish a Certificate of Occupancy for any tenant. CZC04-00168 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/26/20058/29/20058/29/2005APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/26/2005 at 3:14:52 PM. Contact: ###-####. Code compliance ok.
Letter of compliance  8/29/2005 DONE
Letter of Compliance issued 8-29-05.
BLD-Final8/25/20058/25/20058/25/2005PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 8/25/2005 at 7:50:10 AM. Contact: ###-####. Need ADA singe at restroom. Rear grab bar needs to be 36" min as per plan and ada.
FIRE-Final Inspection8/22/20058/22/20058/22/2005PPASS
DetailsForrest France
Exit sign powered discharge light is manufacturer listed and UL approved per the provided paperwork. Life safety finaled.
FIRE-Final Inspection8/15/20058/16/20058/16/2005AFAIL
DetailsTroy Cobbley
Need verification that the exit discharge lights being supplied power from the exit signs is listed by manufacturer.
FIRE-Final Inspection8/5/20058/8/20058/8/2005AFAIL
DetailsTroy Cobbley
Contact: ###-####.
Provide sticker at the main exit per note #25. Provide indicator for the lock at the main exit. Remove thumbturn and provide approved hardware on the west exterior door. Provide exit discharge lighting per review note #18
BLD-Aging Inspection6/29/20056/29/20056/29/2005 NR
DetailsTom Arcoraci
Permit Ready to Issue  6/10/2005 DONE
Inspection Record Card- Bld  6/10/2005 DONE
Receive PAYMENT IN FULL PRINT  6/10/2005  
CHANGE STATUS TO (ISS)  6/10/2005 DONE
previously issued
Plan assigned to (R_H)6/7/20056/7/20056/7/2005 DONE
PLANS/APPL TAKEN TO FRONT DESK  6/7/2005 DONE
Case Summary (BLD)  6/7/2005 DONE
BLD-Framing/Rough-in1/14/20051/18/20051/18/2005APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/14/2005 at 4:14:17 PM. Contact: ###-####.
Telephone call  1/12/2005  
talked to dave miller at ###-#### that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  11/3/2004 DONE
Inspection Record Card- Bld  11/3/2004 DONE
Permit Ready to Issue  11/3/2004  
Telephone call  11/3/2004 DONE
left mess for john cook at ###-#### that permit is ready
Telephone call  11/3/2004 DONE
left mess for john cook ###-#### that permit is ready
Plan resubmittals received  10/25/2004 DONE
Received Transmittal Letter & 2 Copys of Sheets A1,A2 Taken to Carl Westfall...
Telephone call  10/7/2004 DONE
Left a message for Mr. Cook. Told him that we needed 3 sets of resubmitted drawings. Also told him that the new windows are required to comply with the energy code (i.e. SHGC .5 max. and U-factor .6 max.) No further action is possible until resubmitted drawings are received.
Issue PAID IN FULL permit  9/27/2004 DONE
CHANGE ISSUED DATE  9/27/2004 DONE
Permit Ready to Issue  9/24/2004 DONE
Inspection Record Card- Bld  9/24/2004 DONE
Telephone call  9/24/2004 DONE
Left message for John that permit is ready & fees///9/24/04 11:45am BAS
Plan assigned to (CJW)9/16/2004 9/23/2004 PASS
9/23/2004 15:08:35 CJW - activity updated through activity BLDA022 from case BLD04-02128.
Routing - PLANNING9/22/2004 9/23/2004 PASS
Approved per CZC04-168.
Routing - PLAN CHECK9/23/2004 9/23/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/23/2004 DONE
1st review completed  9/23/2004 DONE
Routing - PLAN CHECK9/21/2004 9/22/2004 PASS
IBC plan review started September 22, 2004 and finished the same day. The drawings were approved with clarifications. See the plan review report.
Routing - PLANNING9/20/2004 9/21/2004 FAIL
Zoning Certificate has not been assigned or reviewed yet.
Routing - PUBLIC WORKS9/16/2004 9/20/2004 PASS
Plans ACCEPTED BY PLAN TECH  9/15/2004 DONE
Application received  9/13/2004  
Recd Pcfee & Taken To Pln CK  9/13/2004 DONE
Fee Review-notes9/13/20049/13/2004