Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD04-02146
StatusFinaled
Name COLLIER'S INTERNATIONAL
Site Address 10527 W OVERLAND RD
Project NameCOUNTRY SQUARE SHOPPING CENTER
Customer Number 
ePlanReviewNo
Description
(STOREFRONT EXPANSION-VACANT SPACE)(COUNTRY SQUARE SHOPPING CENTER) Exterior remodel to increase the existing storefront opening from 9'-6" to approximately 19'-6" in an existing CMU wall to the front of an existing vacant space per approved plans and structural engineering. Work to include some demolition work, new structural glu-lam beam and steel support columns to existing foundation, new storefront doors and windows, some exterior wall framing above storefront glazing, some new exterior siding, and some interior gyp. board work. Special Inspection required for epoxy/adhesive anchor installations, structural field welding, and a certificate of compliance to be provided to inspector for any steel work done in an approved fabricator shop. This is a Scope of Work Permit. A Letter of Completion is to be issued when done. No occupancy allowed under this permit. A separate permit is required for a tenant to occupy the space. NOTE: This building is fully fire sprinklered. (PC#0600-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice BLD7/13/20057/13/200512/6/2005 DONE
First Notice has not been responded to.
First Notice6/30/20056/30/20057/13/2005 DONE
DetailsTom Arcoraci
BLD-Aging Inspection6/30/20056/30/20056/30/2005 CANC
DetailsTom Arcoraci
DOC - Permit Finaled6/30/20056/30/20056/30/2005PPASS
DetailsTom Arcoraci
FIRE-Final Inspection11/10/200411/12/200411/12/2004APASS
DetailsTroy Cobbley
fire life safety ok for door 11/12/2004 8:21:54 AM
BLD-Final11/10/200411/12/200411/12/2004PPASS
DetailsLane Manuel
Dennis; Phone #: ###-#### Internet Inspection Request from: Jan Rice
issued letter of compliance 11/12/2004 2:41:24 PM
BLD-Final11/10/200411/10/200411/10/2004PFAIL
DetailsLane Manuel
Dennise; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner
need fire insp's. prior to bldg. final 11/10/2004 12:51:14 PM
BLD-Framing/Rough-in11/2/200411/2/200411/2/2004PPASS
DetailsJim Sly
Dennise- asap if possible-call 1/2 hr prior; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Frame at storefront OK.....MTI has approved welding and Epoxy bolting of columns to floor. 11/2/2004 12:33:09 PM 11/2/2004 12:44:42 PM
BLD-Framing/Rough-in11/1/200411/2/200411/1/2004ACANC
DetailsLane Manuel
Dutch; Phone #: ###-#### Internet Inspection Request from: Jan Rice Inspection cancelled from web by: Jan Rice
BLD-Framing/Rough-in11/1/200411/1/200411/1/2004PCANC
DetailsJim Sly
Dennis-call 1/2 hr. prior; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner Canc by Contr. 11/1/2004 2:46:06 PM
Issue PAID IN FULL permit  10/21/2004 DONE
Inspection Record Card- Bld  10/15/2004 DONE
Permit Ready to Issue  10/15/2004 DONE
Telephone call  10/15/2004 DONE
left mess for michael faughn at ###-#### that permit is ready
PLANS/APPL TAKEN TO FRONT DESK  10/12/2004 PASS
Routing - PLAN CHECK9/30/2004 10/12/2004 PASS
Permit and plans approved and taken to front desk.
Plan assigned to (JCB)9/17/2004 10/12/2004 PASS
10/12/2004 15:09:30 JCB - activity updated through activity BLDA022 from case BLD04-02146.
Plan resubmittals received  10/7/2004 DONE
Received Transmittal Letter, 2 Structural Calcs & 2 Copys of A1.0,A1.1 Taken to Jason B.
1st review completed  9/30/2004 FAIL
failed plan check
Routing - FIRE9/28/2004 9/30/2004 PASS
passed subject to satisfacotry inspection. No comments required.
Plan resubmittals requested  9/28/2004  
Plan resubmittals and written response required for further review.
Routing - Erosion and Sediment9/28/2004 9/28/2004 PASS
approved with attached conditions.
Routing - PLAN CHECK9/21/2004 9/28/2004 FAIL
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Erosion/Sediment Control and then to the Fire Dept. for review.
Routing - PUBLIC WORKS9/17/2004 9/21/2004 PASS
Routing - PLANNING9/21/2004 9/21/2004 PASS
Exterior changes approved through T.I. plans.
Plans ACCEPTED BY PLAN TECH  9/16/2004 DONE
Per Marty S. & Sara S. No DRH need as this will be part of the T I ......
Application received  9/14/2004  
Recd Pcfee & Taken To Pln CK  9/14/2004  
Fee Review-notes9/14/20049/14/2004