Letter of compliance | | | 12/28/2005 | | DONE |
|
|
|
Letter of Compliance issued 12-28-05.
|
BLD-Final | 12/23/2005 | 12/23/2005 | 12/23/2005 | P | PASS |
Forrest France
|
|
|
c/n items are complete
|
BLD-Final | 12/21/2005 | 12/21/2005 | 12/22/2005 | P | PASS |
Dave Hannah
|
|
|
ok for c.c
|
BLD-Final | 12/20/2005 | 12/21/2005 | 12/22/2005 | A | DONE |
Dave Hannah
|
|
|
Mike ###-####
|
Case Summary (BLD) | | | 12/22/2005 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/13/2005 | | |
|
|
|
|
Telephone call | | | 10/20/2005 | | DONE |
|
|
|
Talked w/Tim Wilcomb re: outstanding issues. He will write a letter requesting extension of shell and core temp. occ. cert.
|
Code Occupancy Approval | 8/2/2005 | 8/2/2005 | 8/2/2005 | P | PASS |
Wm. Michael Meloy
|
|
|
Compliance met. OK to release Bond.
|
BLD-Final | 7/22/2005 | 7/25/2005 | 7/25/2005 | A | PART |
Dave Hannah
|
|
|
mike ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok for temp occ needs other trades to go perm bond on land scaping , fire caulking ground fl finsh restrooms
|
FIRE-Final Inspection | 7/25/2005 | 7/25/2005 | 7/25/2005 | P | PART |
Forrest France
|
|
|
Temp. approval per Steve Keuter pending relocation of wall mounted strobe devices to the proper height AFF.
|
Temporary occupancy | | | 7/25/2005 | | DONE |
|
|
|
Temp. Occ. Cert. # 5259 issued 7-25-05 to the 11th & Myrtle Professional Center shell & core.
|
FIRE-Final Inspection | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | PART |
Forrest France
|
|
|
Final pending approval of foreward flow test for backflow preventer at fire supply, and relocation of strobe FA notification devices to meet code required heights AFF.
|
FIRE-Alarm Testing | 7/21/2005 | 7/22/2005 | 7/22/2005 | A | CANC |
Forrest France
|
|
|
Duplicate inspection.
|
FIRE-Final Inspection | 7/19/2005 | 7/21/2005 | 7/21/2005 | A | FAIL |
Forrest France
|
|
|
Provide curb painting at FD access as highlighted on plans and per discussion, verify functionality of main entry/exit mag locks, provide sinage at elevators.
|
Code Occupancy Approval Temp | 7/20/2005 | 7/20/2005 | 7/21/2005 | P | FAIL |
Wm. Michael Meloy
|
|
|
Stripping not in yet. Grass area looking poor.
|
Code Occupancy Approval | 7/20/2005 | 7/20/2005 | 7/20/2005 | P | CANC |
Wm. Michael Meloy
|
|
|
|
BLD-Other | 7/14/2005 | 7/15/2005 | 7/15/2005 | A | PART |
Dave Hannah
|
|
|
mike Note: ceiling ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ceiling grid ok to cover
|
BLD-Framing/Rough-in | 7/12/2005 | 7/12/2005 | 7/12/2005 | P | PART |
Dave Hannah
|
|
|
ceiling//mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok to cover grid
|
Case Summary (BLD) | | | 7/8/2005 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/15/2005 | 6/15/2005 | 6/15/2005 | P | PART |
Dave Hannah
|
|
|
before 2:30 please///siezmic ceiling inspection please////mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ceiling grid third floor east stair tower ok to cover
|
BLD-Framing/Rough-in | 5/9/2005 | 5/9/2005 | 5/10/2005 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ground floor stair and elev ok to cover
|
BLD-Framing/Rough-in | 4/27/2005 | 4/28/2005 | 4/28/2005 | A | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles second floor stair and elev towers and mec room on roof ok to cover
|
BLD-Framing/Rough-in | 4/22/2005 | 4/22/2005 | 4/22/2005 | P | PART |
Dave Hannah
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore third floor shel and core ok to start covering stair and elev shafts 4/22/2005 2:01:24 PM
|
Routing - PLAN CHECK | 3/21/2005 | | 3/23/2005 | | PASS |
|
|
|
Minor changes to shell plan approved.
|
Plan resubmittals received | | | 3/21/2005 | | DONE |
|
|
|
Received 2 Transmittal Letters & 2 Copys of sheets A-1,A-2,A-3,A-10,M-1.3,M-2.1,M-2.3,M-5.1,P-1.1,P-1.2,P-1.3,P-3.1,E2.1P,E2.2L,E2.2P,E2.3F,E2.3L,E2.3P,E3.1 Taken to Mike O.
|
BLD-Footing | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Dave Hannah
|
|
|
mike///tiled up panels???; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Footing | 12/8/2004 | 12/9/2004 | 12/9/2004 | A | PART |
Dave Hannah
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
(F) Reprint permit | | | 12/9/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/8/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/8/2004 | | |
|
|
|
|
Telephone call | | | 12/8/2004 | | DONE |
|
|
|
customer tim wilcomb will return & pickup & cornell larson called him- ###-####
|
Issue PAID IN FULL permit | | | 12/8/2004 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/1/2004 | | 12/8/2004 | | PASS |
|
|
|
12/8/2004 11:24:51 MLO - activity updated through activity BLDA022 from case BLD04-02153.
|
Routing - PLANNING | 12/6/2004 | | 12/7/2004 | | PASS |
|
|
|
Approved per DRH04-00051 Mod #1.
|
Routing - PLANNING Land Div | 12/6/2004 | | 12/6/2004 | | PASS |
|
|
|
Approved. Parcels combined into one parcel by deed and new tax parcel issued.
|
Routing Off Site - STRUCTURAL | 11/3/2004 | | 11/12/2004 | | PASS |
|
|
|
Called PDQ FOR PICK UP
|
Routing - PLANNING Land Div | 11/4/2004 | | 11/9/2004 | | FAIL |
|
|
|
Need copy of recorded deed with metes and bounds description. Talked to Carrie Davis at ###-#### and described what I need.
|
Routing - PLAN CHECK | 11/2/2004 | | 11/4/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 11/4/2004 | | 11/4/2004 | | FAIL |
|
|
|
Applicant is in the process of submitting for a modification to the design review approval. The application is to include changes to the site such as the retaining wall, the generator pad, the landscape along the south property line and the stairs on the southwest corner. The building changes may include a change to the material for the base of the building.
|
Plan resubmittals received | | | 11/3/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of Sheet SP-1 Taken to Mike Otto
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Sets of sheets A-1,A-7,A-10,A-11,A-14,M-1.1,M-2.1,M-5.1,P-1.1,E1.0,E2.1F,E2.1L,E2.1P Taken to Mike Otto..
|
1st review completed | | | 10/12/2004 | | FAIL |
|
|
|
failed Planning Land Div, Planning, plan check and structural.
|
Routing - FIRE | 10/6/2004 | | 10/12/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/8/2004 | | DONE |
|
|
|
Received letter of tranmsittal, response letter, two copies of geotechnical engineering report, two sets of sheets A-1,A-4,A-11,M-1.1,S-5,S-5, taken to Mike Otto.
|
Routing - PLAN CHECK | 10/8/2004 | | 10/8/2004 | | FAIL |
|
|
|
architect notified by phone
|
Plan resubmittals requested | | | 10/6/2004 | | DONE |
|
|
|
IBC corrections
|
Routing Off Site - STRUCTURAL | 9/17/2004 | | 10/6/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLAN CHECK | 9/29/2004 | | 10/6/2004 | | FAIL |
|
|
|
corrections sent to architect
|
Plan assigned to (MLO) | 9/17/2004 | | 9/30/2004 | | PASS |
|
|
|
9/30/2004 08:21:31 RAD - activity updated through activity BLDA022 from case BLD04-02162.
|
Routing - PLANNING | 9/28/2004 | | 9/29/2004 | | FAIL |
|
|
|
DRH04-00051 Sarah Schafer
The keystone retaining walls, chain link fence and the generator are new additions to the site. Staff has called the architect to request two new site plans in order to route to CCDC for comment and for DR staff to look at.
|
Routing - PLUMBING | 9/27/2004 | | 9/28/2004 | | PASS |
|
|
|
1. piping to any roof drain that goes horizonal must be three inch minimum. therefore no two inch roof drain leaders normally. 2. provide unions for backflow devices 3. makeup water to mechanical room must be provided with a reduced pressure backflow device. 4. no provsions for future TI plumbing?
|
Routing - PUBLIC WORKS | 9/21/2004 | | 9/27/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 9/27/2004 | | 9/27/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Plan resubmittals received | | | 9/23/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 3 Sets of E1.0,E3.1,E1.1 Taken to Mike Otto.
|
Routing - PLANNING Land Div | 9/17/2004 | | 9/20/2004 | | FAIL |
|
|
|
Currently 5 different tax parcel #'s. Need to record deed with metes and bounds description. Obtain new tax parcel #. Talked to Brad Marczuk at Larson Architects at ###-#### on September 20, 2004.
|
Plans ACCEPTED BY PLAN TECH | | | 9/17/2004 | | |
|
|
|
|
Application received | | | 9/15/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/15/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/15/2004 | 9/15/2004 | | | |
|
|
|
|