BLD-Final | 5/11/2005 | 5/12/2005 | 5/12/2005 | A | NR |
Tony Young
|
|
|
###-#### dusty
|
BLD-Final | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | PASS |
Tony Young
|
|
|
###-#### dusty
c of o issued 5/12/2005 2:13:44 PM
|
DOC - Permit Finaled | 5/12/2005 | 5/12/2005 | 5/12/2005 | P | PASS |
Tony Young
|
|
|
Finaled by inspector at 5/12/2005 2:13:21 PM
|
BLD-Energy code compliance | 2/3/2005 | 2/4/2005 | 2/4/2005 | A | PASS |
Tony Young
|
|
|
Dusty; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 2/3/2005 | 2/3/2005 | 2/3/2005 | P | PASS |
Tony Young
|
|
|
Dusty; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | P | NR |
Tony Young
|
|
|
late afternoon please///dusty; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
FIRE-Sprinkler Rough-in | 2/1/2005 | 2/2/2005 | 2/2/2005 | A | FAIL |
Troy Cobbley
|
|
|
Dusty; Phone #: ###-#### Riser is exposed cpvc piping. Meet review note #31 or change to steel piping. Plans show dry sidewall heads in the garage. Standard sidewall heads have been installed. Provide the additional tenting and insulation as discussed. Overhead piping on plans is shown as 1". But 1 1/4" piping has been installed . See plans for location. Finish framing the pantry. Resubmitt plans showing the changes or make modifications before ok to cover. 2/2/2005 9:26:57 AM
|
BLD-Framing/Rough-in | 1/31/2005 | 1/31/2005 | 1/31/2005 | P | PART |
Tony Young
|
|
|
Dusty-call before you go; Phone #: ###-#### Internet Inspection Request from: Jan Rice
need truss fix for 2 missed bearing,,, need sprinkler rouph,,, ok to insulate 1/31/2005 4:04:00 PM
|
BLD-Framing/Rough-in | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PART |
Tony Young
|
|
|
Dusty; Phone #: ###-#### Internet Inspection Request from: Jan Rice
ext. shear ok 1/25/2005 11:11:58 AM
|
BLD-Foundation | 11/25/2004 | 11/29/2004 | 11/29/2004 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/25/2004 at 10:46:39 AM. Contact: ###-####.
|
BLD-Footing | 11/23/2004 | 11/23/2004 | 11/23/2004 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/23/2004 at 7:51:19 AM. Contact: ###-####.
|
BLD-Grading Inspection | 11/18/2004 | 11/18/2004 | 11/18/2004 | | DONE |
|
|
|
Footing subgrade approved by geotechnical engineer.
|
PubWorks Subgrade Approval | 10/22/2004 | 10/22/2004 | 11/18/2004 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at ###-####
|
Override - Activity Holds | | | 11/8/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 11/8/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 11/8/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/8/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/8/2004 | | |
|
|
|
|
Telephone call | | | 11/8/2004 | | DONE |
|
|
|
left mess that permit is ready
|
Override - Activity Holds | | | 11/8/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/8/2004 | | DONE |
|
|
|
|
Plan assigned to (DJO) | 11/5/2004 | 11/5/2004 | 11/5/2004 | | PASS |
|
|
|
11/5/2004 14:52:05 DJO - activity updated through activity BLDA022 from case BLD04-02158.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/5/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 11/5/2004 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN CHECK | | | 11/5/2004 | | DONE |
|
|
|
|
Routing - FIRE | 10/29/2004 | | 11/1/2004 | | PASS |
|
|
|
This house shall be fitted with an NFPA 13D automatic fire sprinkler sytem. The systems shall be modified by the installation of a single row of dry sidewall sprinklers along the wall common to attached garage and the living space.(Quail Ridge # 9 Sub)
|
Routing - Erosion and Sediment | 10/28/2004 | | 10/29/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 10/27/2004 | | 10/28/2004 | | PASS |
|
|
|
Approved revised grading plan.
|
Routing - PLANNING | 10/28/2004 | | 10/28/2004 | | PASS |
|
|
|
O.K. w/ Driveway as redlined. Must provide 22' of back-up outside garage.
|
Routing - PLANNING | 10/22/2004 | | 10/27/2004 | | FAIL |
|
|
|
Awaiting revised site/grading plan which corrects driveway and grading concerns. Terry Records is working w/ project engineer and applicant to resolve these issues.
|
Routing - PUBLIC WORKS | 10/22/2004 | | 10/22/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/22/2004 | | 10/22/2004 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PUBLIC WORKS GRADING | 10/12/2004 | | 10/12/2004 | | FAIL |
|
|
|
Storm drain stub location is not shown on plan. Grading needs revisions
|
Routing - PLANNING | 9/20/2004 | | 9/27/2004 | | FAIL |
|
|
|
Driveway does not meet zoning requirements. Spoke w/ applicant regarding revised plans, variance, etc.
|
Routing - PUBLIC WORKS GRADING | 9/16/2004 | | 9/17/2004 | | FAIL |
|
|
|
Driveway is too wide. took to Cody Riddle
|
Application received | | | 9/16/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 11/1/2004 | | | | |
|
|
|
Dan O.
|