BLD-Final | 5/25/2005 | 5/26/2005 | 5/26/2005 | P | PASS |
Tony Young
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Note: please call 1/2 hr prior to inspection
|
BLD-Grading Inspection | 5/26/2005 | 5/26/2005 | 5/26/2005 | | BOND |
|
|
|
The right side of the lot must still be graded so that runoff will be retained and not allowed to be discharged to the lot below. The engineer has recommended a $500 bond to ensure satisfactory completion. Upon receipt of this bond the grading and drainage is conditionally approved.
|
DOC - Permit Finaled | 5/26/2005 | 5/26/2005 | 5/26/2005 | P | PASS |
Tony Young
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Note: please call 1/2 hr prior to inspection
|
BLD-Energy code compliance | 2/17/2005 | 2/18/2005 | 2/18/2005 | P | PASS |
Tony Young
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 2/15/2005 | 2/16/2005 | 2/16/2005 | P | PART |
Tony Young
|
|
|
josh Note: please call 1/2 hr prior to inspect; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
c/n,, ok to insulate 2/16/2005 4:16:56 PM
|
BLD-Framing/Rough-in | 1/31/2005 | 2/1/2005 | 2/1/2005 | A | PART |
Tony Young
|
|
|
josh -Note: please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
ext. shear ok 2/1/2005 9:41:07 AM
|
BLD-Framing/Rough-in | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | NR |
Tony Young
|
|
|
Josh; Phone #: ###-#### Internet Inspection Request from: Jan Rice
conf. only on frame 1/28/2005 10:13:07 AM
|
BLD-Wall cover | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | CANC |
Tony Young
|
|
|
Please call prior to inspection josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore,,, exterior shear
|
BLD-Conference | 1/26/2005 | 1/27/2005 | 1/27/2005 | P | CANC |
Tony Young
|
|
|
Please call prior to inspection josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Other | 1/27/2005 | 1/27/2005 | 1/27/2005 | A | FAIL |
Tony Young
|
|
|
Please call prior to inspection josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore,,,ext shear,,,
c/n posted 1/27/2005 11:09:08 AM
|
BLD-Framing/Rough-in | 1/26/2005 | 1/26/2005 | 1/26/2005 | P | CANC |
Tony Young
|
|
|
Please call prior to inspection josh; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD-Foundation | 12/13/2004 | 12/14/2004 | 12/14/2004 | A | DONE |
Tony Young
|
|
|
josh; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
poured w/out inspection yesterday 12/14/2004 10:53:02 AM
|
BLD-Footing | 12/2/2004 | 12/3/2004 | 12/3/2004 | A | PART |
Tony Young
|
|
|
Josh; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Footing | 12/2/2004 | 12/2/2004 | 12/2/2004 | P | PART |
Tony Young
|
|
|
josh, ###-####
wip,,, added this insp @ contractors request 12/2/2004 3:15:42 PM
|
BLD-Grading Inspection | 12/2/2004 | 12/2/2004 | 12/2/2004 | | DONE |
|
|
|
Footing subgrade has been approved by the geotechnical engineer
|
PubWorks Subgrade Approval | 11/10/2004 | 11/10/2004 | 12/2/2004 | | DONE |
|
|
|
A letter from the applicants geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to calling for a footing inspection. Call Terry Records at ###-####.
|
Override - Activity Holds | | | 11/30/2004 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 11/24/2004 | | |
|
|
|
|
Permit Ready to Issue | | | 11/24/2004 | | DONE |
|
|
|
|
Override - Activity Holds | | | 11/24/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/24/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/24/2004 | | DONE |
|
|
|
|
Telephone call | | | 11/24/2004 | | DONE |
|
|
|
Spoke with Jim and told him that permit is ready & fess////11/24/04 12:32pm BAS
|
Plan Reviewer's activity | | | 11/23/2004 | | DONE |
|
|
|
plans stamped. ok to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/23/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/19/2004 | | |
|
|
|
have contacted Jim Dildine. plan sets need engineers stamps. Jim will stop by and take plans to Lochsa to wet stamp. will continue review after receiveing stamped plans back.
|
Case Summary (BLD) | | | 11/19/2004 | | |
|
|
|
|
Plan Review Report | | | 11/19/2004 | | |
|
|
|
|
Plan assigned to (DJO) | 11/18/2004 | 11/18/2004 | 11/18/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/18/2004 | | FAIL |
|
|
|
have tried to reach Lee Harrison (Lochsa Eng.) for two day. have left messages. will not issue until lateral calculations are clarified. have notified Jim Dildine, builder. rescheck incorrect. will submit calculations that i have input.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/18/2004 | | |
|
|
|
|
Pending Assignment by DJO | 9/17/2004 | | 11/18/2004 | | DONE |
|
|
|
11/18/2004 15:10:33 DJO - activity updated through activity BLDA169 from case BLD04-02174.
|
Routing - FIRE | 11/4/2004 | | 11/5/2004 | | PASS |
|
|
|
this house shall be fitted with an NFPA 13D automatic fire sprinkler system. Systems shall be modified by the installation of a single row of dry sidewall sprinklers along the wall common to attached garages and the living space. (Quail Ridge #9 sub)
|
Routing - PUBLIC WORKS GRADING | 11/1/2004 | | 11/4/2004 | | PASS |
|
|
|
Approved revised grading plan.
|
Routing - PLANNING | 11/4/2004 | | 11/4/2004 | | PASS |
|
|
|
O.K. per revised site plan. Floor plans have been redlined to provide a minimum front setback of 20'.
|
Routing - Erosion and Sediment | 11/4/2004 | | 11/4/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 9/27/2004 | | 9/29/2004 | | FAIL |
|
|
|
Driveway does not provide 22' of back-up as required.
Bump-out for television is not allowed to encroach into setback.
20' front setback required in subdivision.
Left message w/ applicant at 8:00 a.m. on 9/29/04.
|
Routing - PUBLIC WORKS | 9/23/2004 | | 9/24/2004 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/17/2004 | | 9/23/2004 | | PASS |
|
|
|
Approved as category 3
|
Application received | | | 9/17/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 11/5/2004 | | | | |
|
|
|
|