Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02179
StatusFinaled
Name DEREK A. PICA - LAW OFFICE
Site Address 199 N CAPITOL BLVD Unit: 302
Project NameWASHINGTON MUTUAL BLDG
Customer Number 
ePlanReviewNo
Description
(DEREK A. PICA - LAW OFFICE - 3RD FLOOR) This building is fire sprinklered to meet high-rise provisions. To remodel an existing 2,107 square foot office tenant space (1,802 square feet inside and 305 square feet on the terrace) for a new office tenant located on the 3rd floor of a high-rise building. Work is to include changes to an existing 1-hr fire-resistance-rated corridor, interior nonbearing walls, interior doors and windows, suspended ceilings, and finishes all per the approved drawings and the plan review report on file. The location of fire sprinkler heads shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/6/200512/6/200512/16/2005 DONE
Second Notice has not been responded to.///Signed off 2004 permit per Jenifer & Rita
Second Notice 5/20/200512/6/2005 DONE
First Notice 1/5/20054/26/2005 DONE
Permanent occupancy UNPAID FEE  1/5/2005 DONE
Perm. Occ. Cert. # 10411 issued 1-5-05 to the Derek A. Pica Law Office.
BLD-Final1/3/20051/4/20051/4/2005APASS
DetailsDave Hannah
stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for perm occ 1/4/2005 11:17:19 AM
BLD-Final1/3/20051/4/20051/4/2005APASS
DetailsDave Hannah
stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Final1/3/20051/3/20051/3/2005PPART
DetailsDave Hannah
stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore chech door closures 1/3/2005 2:45:30 PM
Permanent Occupancy 12/30/200412/30/2004 DONE
Details
BLD-Final12/29/200412/30/200412/30/2004PDONE
DetailsDave Hannah
stan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection12/30/200412/30/200412/30/2004PPASS
DetailsTroy Cobbley
Fire life safety finaled
BLD-Framing/Rough-in12/15/200412/16/200412/16/2004APART
DetailsDave Hannah
stan - t bar grid sizemic insp; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to drop in ceiling pannels 12/16/2004 11:41:35 AM
BLD-Framing/Rough-in11/12/200411/15/200411/15/2004APART
DetailsDave Hannah
Stan-Suite 302; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner ok to cover int walls after elec and plumbing has signed off 11/15/2004 11:53:21 AM
Issue PAID IN FULL permit  11/1/2004 DONE
Inspection Record Card- Bld  10/1/2004 DONE
Print Occupancy Form  10/1/2004  
Telephone call  10/1/2004  
left mess for byron folwell at ###-#### permit is ready
Plan assigned to (CJW)9/23/2004 9/30/2004 PASS
9/30/2004 11:24:24 CJW - activity updated through activity BLDA022 from case BLD04-02179.
Routing - PLAN CHECK9/29/2004 9/30/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  9/30/2004 DONE
Routing - FIRE9/27/2004 9/29/2004 PASS
1st review completed  9/29/2004 PASS
Routing - PUBLIC WORKS9/23/2004 9/27/2004 PASS
Routing - PLAN CHECK9/22/2004 9/23/2004 PASS
IBC plan review started September 22, 2004 and was finished the next day. The drawings were approved with clarifications. See the plan review report.
Plans ACCEPTED BY PLAN TECH  9/21/2004 DONE
No MEC comcheck
Application received  9/17/2004