Second Notice BLD | 7/13/2005 | 7/13/2005 | 12/6/2005 | | DONE |
|
|
|
First Notice has not been responded to.
|
Telephone call | | | 12/6/2005 | | DONE |
|
|
|
Left a message for Leny (Buss) regarding final value difference///12/06/05 @8:30am BAS
|
First Notice | | 5/24/2005 | 7/13/2005 | | DONE |
|
|
|
|
Permanent Occupancy | | 5/24/2005 | 5/24/2005 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 5/24/2005 | | DONE |
|
|
|
Perm. Occ. Cert. # 10595 issued 5-24-05 to the Mongolian Bistro in the Hillcrest Shopping Center.
|
BLD-Final | 3/31/2005 | 4/1/2005 | 4/1/2005 | A | PART |
Tom Arcoraci
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok for temp 4/1/2005 7:53:01 AM
|
FIRE-Final Inspection | 3/31/2005 | 3/31/2005 | 3/31/2005 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled
|
BLD-Framing/Rough-in | 3/29/2005 | 3/30/2005 | 3/30/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/29/2005 at 2:47:25 PM. Contact: ###-####.
|
FIRE-Final Inspection | 3/27/2005 | 3/28/2005 | 3/28/2005 | P | FAIL |
Troy Cobbley
|
|
|
No permit had been issued for the hood suppression system but work has been complete. Pull station is too close to hood, no fire extinguishers installed. Hood is not connected to the existing fire alarm system. We went over live safety review note requirements with the general contractor. I request that Pete with Coliers contact me about the fire alarm requirements. 3/28/2005 4:04:36 PM
|
BLD-Wall cover | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 3/14/2005 at 6:56:46 AM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | PART |
Dave Hannah
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie first layer of sheet rock for 1hr wall ext to roof ok 3/4/2005 10:42:30 AM
|
BLD-Conference | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | CANC |
Tom Arcoraci
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Conference | 2/28/2005 | 2/28/2005 | 2/28/2005 | P | PASS |
Tom Arcoraci
|
|
|
Dennis; Phone #: ###-#### Internet Inspection Request from: Jan Rice discused existing 1hr wall that was not to deck 2/28/2005 2:03:57 PM
|
BLD-Wall cover | 2/21/2005 | 2/22/2005 | 2/22/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 2/21/2005 at 3:11:46 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PART |
Jim Sly
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Corr notice posted. Partial insp only. 2/14/2005 11:08:09 AM
|
BLD-Framing/Rough-in | 2/10/2005 | 2/10/2005 | 2/10/2005 | P | NR |
Tom Arcoraci
|
|
|
devin; Phone #: ###-#### Internet Inspection Request from: Barbara Moore needs arc app and new details 2/10/2005 2:17:20 PM
|
BLD-Framing/Rough-in | 2/7/2005 | 2/8/2005 | 2/8/2005 | A | FAIL |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 2/7/2005 at 5:22:39 PM.
c/n on site 2/8/2005 9:12:42 AM
|
Inspection Record Card- Bld | | | 12/13/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/13/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/13/2004 | | DONE |
|
|
|
|
Telephone call | | | 12/13/2004 | | DONE |
|
|
|
left mess for hen thack at ###-#### that permit is ready & pat mckeegan at ###-####
|
Issue PAID IN FULL permit | | | 12/13/2004 | | DONE |
|
|
|
|
Routing - FIRE | 12/6/2004 | | 12/10/2004 | | PASS |
|
|
|
resubmittal plan mdoifications are acceptable in conjunction with the upgrade agreement recently reached and currently being written for signing.
|
Routing - PLAN CHECK | 12/10/2004 | | 12/10/2004 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/10/2004 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/23/2004 | | 12/10/2004 | | PASS |
|
|
|
12/10/2004 08:08:38 CJW - activity updated through activity BLDA022 from case BLD04-02195.
|
Routing - PLAN CHECK | 12/3/2004 | | 12/6/2004 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Routing - PLUMBING | 12/2/2004 | | 12/3/2004 | | PASS |
|
|
|
per plans and 2003 upc
|
Plan resubmittals received | | | 12/2/2004 | | DONE |
|
|
|
Received three copies of revised sheets A1.1 and one copy of response letter. Routed to Carl W. kmm
|
Routing - PLAN CHECK | 11/24/2004 | | 12/2/2004 | | |
|
|
|
(11-23-04) Drawings on hold until resubmitted drawings are received. (12-2-04) Sent back to Plumbing for resubmittal review.
|
Plan resubmittals received | | | 11/29/2004 | | |
|
|
|
Received 2 Copys of sheet P1.0, P1.1 Taken to Carl W.
|
Routing - PLUMBING | 11/23/2004 | | 11/24/2004 | | FAIL |
|
|
|
comments made 9/28/04 not addressed on resubmitted plans
|
Routing - PLAN CHECK | 10/18/2004 | | 11/23/2004 | | FAIL |
|
|
|
Failed 2nd IBC plan review. Issues regarding fire barrier have NOT been resolved.
|
Plan resubmittals received | | | 11/18/2004 | | |
|
|
|
Received Transmittal Letter, & 2 Sets of Copys of A1.0,A3.0,P1.0,P1.1,H1.0 Taken to Carl W.
|
1st review completed | | | 10/18/2004 | | FAIL |
|
|
|
failed plumbing, plan check and fire.
|
Routing - FIRE | 10/14/2004 | | 10/18/2004 | | FAIL |
|
|
|
lacks details of fire barrier/ occupancy separation.
|
Routing - PLAN CHECK | 9/28/2004 | | 10/14/2004 | | FAIL |
|
|
|
Failed first IBC plan review. IBC plan review started October 4, 2004 and finished October 14, 2004. Resubmitted drawings from the architect were requred. See the plan review report.
|
Telephone call | | | 10/11/2004 | | DONE |
|
|
|
(Oct. 6, 2004 ? ? ?) Talked with the mall owner's representative in Alaska. Told him that we need to know there plans for the old movie theater and the church. The area of this mall allowed to be used for assembly is limited.
|
Routing - PLUMBING | 9/27/2004 | | 9/28/2004 | | FAIL |
|
|
|
1. see attached boise city approved grease interceptor drawing 2. grease interceptor line to building must be four inch with a cleanout two feet outside building 3. two inch line to three compartment sink must be three inch line with a three inch floor sink for an indirect waste from the three compartment sink 4. need drawings P1.1 and P1.2
|
Routing - PUBLIC WORKS | 9/23/2004 | | 9/27/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/22/2004 | | DONE |
|
|
|
No Lighting Compliance..
|
Application received | | | 9/20/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/20/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/20/2004 | 9/20/2004 | | | |
|
|
|
|