BLD-Final | 1/5/2005 | 1/5/2005 | 1/5/2005 | A | PASS |
Troy James
|
|
|
|
DOC - Permit Finaled | 1/5/2005 | 1/5/2005 | 1/5/2005 | A | PASS |
Troy James
|
|
|
Finaled by inspector at 1/5/2005 9:35:22 AM
|
BLD-Grading Inspection | 12/21/2004 | 12/21/2004 | 12/21/2004 | | DONE |
|
|
|
Final grading approved
|
BLD-Final | 12/18/2004 | 12/20/2004 | 12/20/2004 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/18/2004 at 9:09:00 PM. Contact: ###-####. Need to make the back door step compliant with code, due to the new front steps not in compliance. Approval to use the back door as entry per George Slane. 12/22/2004 11:23:15 AM
|
BLD-Framing/Rough-in | 10/25/2004 | 10/26/2004 | 10/26/2004 | A | PART |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 2:25:03 PM. Contact: ###-####. rough framing of new deck ok. Post attachments to rock per engineering. 10/26/2004 9:02:54 AM
|
BLD-Footing | 10/25/2004 | 10/26/2004 | 10/26/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 2:26:53 PM. Contact: ###-####. post attachment to rock per engineering report ok. 10/26/2004 9:04:00 AM
|
Case Summary (BLD) | | | 9/22/2004 | | |
|
|
|
|
Plan Review Report | | | 9/22/2004 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/22/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 9/22/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 9/22/2004 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 9/20/2004 | | 9/21/2004 | | PASS |
|
|
|
Approved with conditions of approval in letter attached to the plans and this case.
|
Routing - Erosion and Sediment | 9/21/2004 | | 9/21/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING | 9/21/2004 | | 9/21/2004 | | PASS |
|
|
|
Approved as redlined, and per conversation with Scott Spjute.
|
Application received | | | 9/20/2004 | | |
|
|
|
|
Routing - PLAN CHECK | 9/21/2004 | | | | |
|
|
|
Perry P.
|