This project is for the placement of new select basement walls to enlarge the usable space in the basement of an existing single family dwelling.R-1CH ok per cer. All per the approved plans as marked and attached Engineering and Engineering calculations along with plan review notes. pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Inspection Record Card- Bld  1/10/2008  
Inspection Record Card- Bld  1/10/2008  
BLD-Conference1/7/20081/8/20081/8/2008APASS
DetailsTony Young
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-####
structural ok now,, met w/ Sarah the struct eng..
BLD-Final1/8/20081/8/20081/8/2008PPASS
DetailsTony Young
Kyle, Tony, you wanted to set the time at 11 am ///dld Phone #: ###-####
DOC - Permit Finaled1/8/20081/8/20081/8/2008PPASS
DetailsTony Young
Plan Reviewer's activity  11/29/2007 DONE
Received letter from Kyle Seath (owner) on 11/26/07 stating change of engineer of record from Riley Mahaffey to Sarah McClendon. Letter scanned into documents of this permit.
Routing Walk-In (BLD)2/13/20072/13/20072/13/2007APASS
BLD-Framing/Rough-in6/5/20066/5/20066/5/2006PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/5/2006 at 7:42:39 AM. Contact: ###-####.
partial,, c/n posted to obtain a letter of approval as built from the structural engineer of record,,, then to obtain rough inspections from trades
BLD-Foundation5/30/20065/31/20065/31/2006APART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
new water proof material has been applied
Routing Walk-In (BLD)5/25/20065/25/20065/25/2006APASS
questions on interpreting code
Plan Reviewer's activity  5/24/2006 DONE
5/19/06 - Received letter from owner stating change of engineer from Sarah McClendon to Riley Mahaffey.
5/24/06 - Responded by letter to owner. (msouthard)
Plan Reviewer's activity  5/5/2006  
approved engineering details and calculations by Riley Mahaffey
Plan Reviewer's activity  4/18/2006 DONE
4/18/2006 11:00 a.m. Met with Mr Hollingsworth and recieved submittal of product for use as the new basement wall water protection. The product submitted for approval is "DECO PENETRATING CONCRETE SEALER 20" " ES Legacy Report 93-04.01" Copies of the report are provided to Marlene Southard ( Plan Review Manager) and George Slan (Building Official). ....pep 4/18/2006
BLD-Conference7/25/20057/25/20057/25/2005PFAIL
DetailsTony Young
kyle; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
met w/ Engineer Sarah McClendon, ph####-####,, and owner to investigate project,,, Noticed that portion of structure was not per plan,,, also that exterior did not appear to be damped/waterproofed per 402r,, 2000,, also to provide engineer fix/ approval,, c/n to that effect
BLD-Framing/Rough-in10/15/200410/15/200410/15/2004PPART
DetailsTony Young
brett; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
new masonary wall ok,,, no electrical at this point,,, need to have eng. ok as built due to logisticts of job,,, plentum not cut in yet,,,, DO NOT COVER 10/15/2004 2:02:54 PM
BLD-Footing9/24/20049/24/20049/24/2004PPART
DetailsTroy James
Scheduled by a contractor via Hello! on 9/24/2004 at 11:05:51 AM. Contact: ###-####. wip asked to have engineer to verify CMU wall for compliance. 9/24/2004 2:51:10 PM
Application received  9/21/2004  
Plan assigned to (PEP)9/21/2004 9/21/2004 PASS
9/21/2004 09:49:01 PEP - activity updated through activity BLDA022 from case BLD04-02200.
Plan Review Report  9/21/2004  
PLANS/APPL TAKEN TO FRONT DESK  9/21/2004 DONE
Print Pending Permit.LaserJet4  9/21/2004  
Inspection Record Card- Bld  9/21/2004 DONE
Permit Ready to Issue  9/21/2004 DONE
Issue PAID IN FULL permit  9/21/2004 DONE