Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD04-02203
StatusFinaled
Name ST LUKES REG MED CNTR
Site Address 190 E BANNOCK ST
Project NameST LUKES
Customer Number 
ePlanReviewNo
Description
ST LUKES-S & CENTRAL WING-GROUND FLOOR & SUB BASEMENT)(MEDICAL IMAGING) To remodel 26,150 sq.ft. of existing areas currently used as surgery support space for medical imaging per approved plans. Work includes selective demolition; new interior, non-combustible, fire-resistive walls to create exam, treatment, recovery and support ares; a 1-hour fire barrier to create a medical imaging suite; corridor walls to form a barrier against smoke; 1-hour walls at incidental use area storage rooms as indicated; electrical, mechanical, plumbing, medical gases, sprinkler and alarm systems upgrades to meet tenant needs and comply with minimum code. PC04-622/drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/15/20063/15/20063/23/2006 DONE
Second Notice has not been responded to.
Second Notice BLD3/1/20063/1/20063/15/2006 DONE
First Notice has not been responded to.
First Notice 2/1/20063/1/2006 DONE
BLD-Final1/31/20061/31/20062/1/2006PPASS
DetailsDave Hannah
Dave the last is here for Medical Imaging ready for final thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok for perm occ
Permanent occupancy  2/1/2006 DONE
Perm. Occ. Cert. # 10891 issued 2-1-06 to St. Luke's Regional Medical Center (medical imaging).
BLD - Resubmittal Approved1/31/20061/31/20061/31/2006ACANC
DetailsDave Hannah
Dave the last is here for Medical Imaging ready for final thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Final1/31/20061/31/20061/31/2006ADONE
DetailsDave Hannah
Forest we are ready for a final life safety for C area thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble
FIRE-Final Inspection1/31/20061/31/20061/31/2006PPASS
DetailsForrest France
Fire life safety is acceptable for final, missing handle at fire ext. cabinet adjacent to south exterior exit door to be installed today per P. Doble. Noted that fire sprinkler heads in common fire areas are to be of the same response type at the divisions between remodel and exsisting areas, two missing escutcheons at restrooms to be re-installed today.
Permanent Occupancy 1/31/20061/31/2006 DONE
Details
BLD-Other12/29/200512/29/200512/29/2005PPART
DetailsDave Hannah
Ed has a grid ceiling ready for cover ; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok for temp occ needs to finish ada rest rooms
BLD-Framing/Rough-in12/16/200512/16/200512/16/2005APART
DetailsDave Hannah
Couple of hard lids for cover. Thanks Phil ; Phone #: ###-#### Internet Inspection Request from: Phil Doble needs to finish fire proofing walls above hardlids
BLD-Framing/Rough-in12/9/200512/9/200512/9/2005PPART
DetailsDave Hannah
We have six offices,two restrooms,one lockeroom,& one lounge, in "D" area ; Phone #: ###-#### Internet Inspection Request from: Phil Doble ceiling grid ok ok to cover
BLD-Wall cover12/9/200512/9/200512/9/2005ACANC
DetailsDave Hannah
We have six offices,two restrooms,one lockeroom,& one lounge, in "D" area ; Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Wall cover12/5/200512/5/200512/5/2005APASS
DetailsDave Hannah
Area D conference, thanks Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover
BLD-Wall cover12/2/200512/2/200512/2/2005APART
DetailsDave Hannah
Dave, not sure if you looked at the fire caulk; Phone #: ###-#### Internet Inspection Request from: Phil Doble floor pent ok ok to cover walls
BLD-Wall cover11/30/200511/30/200511/30/2005AFAIL
DetailsDave Hannah
Last piece of the puzzle; Phone #: ###-#### Internet Inspection Request from: Phil Doble framing ok but needs to fire prooof pluming pens in floor
BLD-Wall cover11/14/200511/15/200511/15/2005APART
DetailsDave Hannah
Dave, last piece of D area. ; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover walls but needs to clean up old shafts
BLD-Final10/21/200510/24/200510/25/2005PPART
DetailsDave Hannah
Dave, just need you to look at one room. Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble x-ray room ok to use
BLD-Final9/28/20059/29/20059/29/2005APART
DetailsDave Hannah
Dave, cloverdale pluming has Gary Z. coming this afternoon so we should be ready mid afternoon for you. Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble phase II AREA S A&B ok to occ
BLD-Final9/28/20059/28/20059/29/2005PCANC
DetailsDave Hannah
Dave, cloverdale pluming has Gary Z. coming this afternoon so we should be ready mid afternoon for you. Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble
FIRE-Final Inspection9/27/20059/27/20059/27/2005PPART
DetailsForrest France
Area A and area B life safety, not including the specials lab and men's lockers as marked on approved plans, passed inspection.
BLD-Wall cover9/13/20059/13/20059/13/2005APART
DetailsDave Hannah
Dave, beep me when in the area thanks Phil; Phone #: ###-#### x3006 Internet Inspection Request from: Phil Doble ceiling grid second area ok to cover
FIRE-Conference7/29/20057/29/20057/29/2005ADONE
DetailsForrest France
On site discussion with Phil Doble in regards to sprinkler code issues related to obstructions in a restroom by a soffit and by rolling cabinets in a records room.
BLD-Conference7/28/20057/28/20057/28/2005APASS
DetailsDave Hannah
Dave, need you to look at a height issue, code on height above rolling cabinets,and have letter from MTI on I beams. thanks Phil ; Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Framing/Rough-in7/21/20057/21/20057/25/2005ADONE
DetailsDave Hannah
Hi Dave, This will be for most of A area; Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Framing/Rough-in7/25/20057/25/20057/25/2005APART
DetailsDave Hannah
Hi Dave, need you to look at area A for cover. Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble area a ok to start covering
BLD-Framing/Rough-in7/6/20057/6/20057/7/2005PPART
DetailsDave Hannah
Hi Dave, this will be for the "B" area; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to start covering area b
BLD-Final6/28/20056/28/20056/28/2005APART
DetailsDave Hannah
Well let's try today; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to move into area c this is a multy phs project
FIRE-Final Inspection6/28/20056/28/20056/28/2005APART
DetailsTroy Cobbley
Early Completion area is ok to occupy. The pocket door in the pharmacy still needs ada approved hardware prior to a final.
BLD-Final6/27/20056/27/20056/28/2005ACANC
DetailsDave Hannah
Hi Dave, need you to look at the early completion area by Forest, Gary, and you ; Phone #: ###-#### Internet Inspection Request from: Phil Doble
BLD-Framing/Rough-in6/17/20056/17/20056/17/2005PPASS
DetailsDave Hannah
Dave, this is the early completion phase for the Medical Imaging.; Phone #: ###-#### Internet Inspection Request from: Phil Doble ceiling grid most ok several areas perm wires not 1 in 6 crew will redue this areas
BLD-Conference5/31/20056/1/20056/1/2005APART
DetailsDave Hannah
Hi Dave, Would like you to walk thru the early completion area. Phil ; Phone #: ###-#### Internet Inspection Request from: Phil Doble walked area c with phill and forest needs to fix ceiling grid and fire protect three post and get spec inspec on fi
BLD-Wall cover5/10/20055/10/20055/10/2005APART
DetailsDave Hannah
Hi Dave, Need you to look at a shaft wall before covering Phil; Phone #: ###-#### Internet Inspection Request from: Phil Doble ok to cover shaft
BLD-Framing/Rough-in4/20/20054/21/20054/21/2005APART
DetailsDave Hannah
phill ###-#### shaft wall two sides ok 4/21/2005 10:39:25 AM
Override - Parcel Holds  4/20/2005  
BLD-Framing/Rough-in4/11/20054/11/20054/11/2005PNR
DetailsDave Hannah
ceiling inspection please///dan wilson; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Override - Parcel Holds1/1/19001/1/19004/11/2005  
ceiling inspection
BLD-Framing/Rough-in4/8/20054/8/20054/8/2005PPART
DetailsDave Hannah
###-#### Phil phase one area ok to cover walls 4/8/2005 12:50:26 PM
Override - Parcel Holds  4/8/2005  
BLD-Conference4/4/20054/4/20054/4/2005PPART
DetailsDave Hannah
phil ###-#### phase one area steel studs ok 4/4/2005 2:00:48 PM
Override - Parcel Holds  4/4/2005  
BLD-Aging Inspection1/10/20051/10/20051/10/2005 PASS
DetailsDave Hannah
wip 1/10/2005 8:13:03 AM
Routing - PLAN CHECK10/8/2004 10/11/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  10/11/2004 PASS
To permit desk for issue of permit.
Permit Ready to Issue  10/11/2004 DONE
Inspection Record Card- Bld  10/11/2004 DONE
Print Occupancy Form  10/11/2004 DONE
Telephone call  10/11/2004 DONE
E-mailed Curtis that permit is ready & fees///10/11/04 2:15pm BAS
Issue & PRINT to be Invoiced  10/11/2004 DONE
Plan assigned to (DRS)9/23/2004 10/11/2004 PASS
10/11/2004 07:51:08 DRS - activity updated through activity BLDA022 from case BLD04-02203.
Routing - FIRE10/5/2004 10/8/2004 PASS
1st review completed  10/8/2004  
Routing - PLAN CHECK9/29/2004 10/5/2004 PEND
No resubmittals required. Routing to fire code analyst for review.
Routing - PLUMBING9/27/2004 9/29/2004 PASS
Routing - PUBLIC WORKS9/23/2004 9/27/2004 PASS
Plans ACCEPTED BY PLAN TECH  9/23/2004 DONE
Pending Assignment by MYS9/23/2004 9/23/2004 DONE
9/23/2004 13:16:38 MYS - activity updated through activity BLDA168 from case BLD04-02203.
Application received  9/21/2004  
(F) Reprint permit  9/21/2004 DONE