Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02204
StatusFinaled
Name BECK CONSTRUCTION INC
Site Address 3100 W PLEASANTON AVE
Project NameIDAHO RIVER SPORTS
Customer Number 
ePlanReviewNo
Description
(IDAHO RIVER SPORTS) Remodel to an existing 5,391 sq. ft. building partially changing occupancy for new retail sales and storage use per approved plans, CAR04-00026, & DRH04-00218. The site also has an 887 sq. ft. storage building at the rear of the property that will have minimum one-hour rated wall infill on the south side and two-hour rated wall infill on the west side in existing window openings because of location on property. Work to include miscellaneous demolition work, some structural steel work at new or enlarged openings for new exterior windows and doors, permitting and structurally upgrading the rear addition to this building that was constructed without a permit per structural engineer, some new site work including parking, new interior walls, new interior doors and windows, some suspended ceiling work, interior finish, upgrading restrooms to current accessibility standards, new mechanical work including new furnaces, new plumbing, and new electrical work. Special Inspection required for concrete and reinforcement, for any field welding of structural steel, a certificate of compliance for any steel work done in an approved fabricator shop to be provided to inspector in field, and for epoxy/adhesive anchor installations. A Certificate of Occupancy is to be issued when completed and approved. Nonseparated Uses per IBC Section 302.3.2. NOTE: This building is located in the flood plain. All electrical outlets, panels, switches, etc..., are to be mounted 38" minimum above the finished floor to the bottom of the fixture. (Devices to be 12" minimum above base flood elevation per F.E.M.A.) NOTE: This building is not fire sprinklered. (PC#0623-04) JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/13/20057/13/20058/27/2005 DONE
First Notice has not been responded to.
First Notice 6/1/20057/13/2005 DONE
Permanent occupancy  6/1/2005 DONE
Perm. Occ. Cert. # 10608 issued 6-1-05 to Idaho River Sports.
Permanent Occupancy 5/25/20055/25/2005 DONE
Details
BLD-Other5/17/20055/18/20055/18/2005ADONE
DetailsDave Hannah
Scheduled by a contractor via Hello! on 5/17/2005 at 11:17:10 PM. Contact: ###-####.
BLD-Final3/2/20053/3/20053/3/2005APASS
DetailsDave Hannah
Gary; Phone #: ###-#### or Stan ###-#### Internet Inspection Request from: Jan Rice ok for perm occ 3/3/2005 8:45:00 AM
BLD-Final2/10/20052/11/20052/11/2005ANR
DetailsJim Sly
gordon; Phone #: ###-#### Internet Inspection Request from: Jan Rice Need proof of bonding for landscape, need insp from Code Inforcement, and Plumb Needs to final verified on computer (no record on computer). 2/11/2005 10:37:21 AM
FIRE-Final Inspection2/10/20052/11/20052/11/2005APASS
DetailsTroy Cobbley
fire life safety finaled 2/11/2005 10:12:43 AM
BLD-Final2/11/20052/11/20052/11/2005PPART
DetailsDave Hannah
Gordon; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok for temp occ after boned is posted c/n items for perm occ are finsh ada restrooms 2/11/2005 3:29:19 PM
Temporary occupancy  2/11/2005 DONE
Temp. Occ. Cert. # 5209 issued 2-11-05 to Idaho River Sports.
FIRE-Final Inspection2/8/20052/8/20052/8/2005PFAIL
DetailsTroy Cobbley
Provide correct remote annunciators for the duct smoke detectors and then test. Remove thumbturn from the main entry/exit. Keyed is ok. Provide approved hardware on all other doors as per review comments and drawings. Provide exit discharge lighting as per review comments. 2/8/2005 3:27:36 PM
BLD-Final2/7/20052/7/20052/7/2005PNR
DetailsTom Arcoraci
please call 15 mins prior to inspection so he can meet ya there///gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Other2/7/20052/7/20052/7/2005PFAIL
DetailsTom Arcoraci
grid not per plan ok to set perimeter tiles when per plan
BLD-Framing/Rough-in12/28/200412/29/200412/29/2004APASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD-Framing/Rough-in12/28/200412/29/200412/29/2004APASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
(F) Reprint permit  12/14/2004 DONE
Issue PAID IN FULL permit  11/30/2004 DONE
Override - Parcel Holds  11/29/2004  
Permit Ready to Issue  11/29/2004 DONE
Override - Parcel Holds  11/29/2004  
Inspection Record Card- Bld  11/29/2004 DONE
Print Occupancy Form  11/29/2004 DONE
Routing - PLAN CHECK11/2/2004 11/24/2004 PEND
Plans to route to Marty for Planning approval.
Routing - PLANNING11/24/2004 11/24/2004 PASS
Approved per DRH04-218 and per letter from Matt Reed to Scott Spjute, dated November 24, 2004.
Routing - PLAN CHECK11/24/2004 11/24/2004 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/24/2004 PASS
Override - Parcel Holds  11/24/2004  
Plan assigned to (JCB)9/23/2004 11/24/2004 PASS
11/24/2004 16:28:50 JCB - activity updated through activity BLDA022 from case BLD04-02204.
Routing - PLAN CHECK10/27/2004 11/2/2004 PEND
Permit approval dependent on approval from Planning. Marty Santoyo will let me know when Planning can approve the plans/project.
Plan resubmittals received  11/1/2004 DONE
Received Transmittal Letter, & 1 Lighting Compliance.. Taken to Jason B.
Routing - PLAN CHECK10/18/2004 10/27/2004 FAIL
Two items still need to be addressed. Called and left message with architect representative.
Plan resubmittals received  10/25/2004 DONE
Received Transmittal Letter, & 2 Sets of T1.0, A1.0,A2.0,S1,S2,LEC-1 Taken to Jason B...
BLD-Conference10/21/200410/21/200410/21/2004PPART
DetailsBob Archibald
Met with Gary Beck on site to discuss infill framing prior to issuance of building permit. Gary was authorized to begin framing but no cover is allowed.
1st review completed  10/18/2004 FAIL
failed planning and plan check.
Routing - FIRE10/15/2004 10/18/2004 PASS
Plan resubmittals requested  10/15/2004  
Plan resubmittals and written response required for further review.
Routing - PLAN CHECK9/30/2004 10/14/2004 FAIL
Plan review sent and faxed to architect. Plan resubmittals and written response required for further review. Plans to route to Fire Dept. for review.
Routing - PLANNING9/27/2004 9/30/2004 FAIL
Carl Miller CAR04-00026--Rezone to C-1D/DA has not been finaled.
Marty Santoyo DRH04-00218
Routing - PUBLIC WORKS9/23/2004 9/27/2004 PASS
Routing - PLANNING Land Div9/23/2004 9/23/2004 PASS
Approved as Parcel E on ROS 5819.
Plans ACCEPTED BY PLAN TECH  9/23/2004 PASS
Sheets A1.3 and A2.0 not signed on extra set of plans. kmm
Application received  9/21/2004  
Fee Review-notes9/21/20049/21/2004