Second Notice BLD | 1/29/2009 | 1/29/2009 | 1/29/2009 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 1/15/2009 | 1/15/2009 | 1/29/2009 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 1/15/2009 | 1/15/2009 | 1/15/2009 | P | PASS |
Mike Jordan
|
|
|
All issues were resolved. A letter of Complettion was issued under bld08-00103. ok to final permit.
|
CHANGE STATUS TO (ISS) | | | 1/9/2009 | | DONE |
|
|
|
Ok per George Slane to open for a building final 1-9-09 ///DLD
|
BLD-Conference | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 2/4/2008 | 2/4/2008 | 2/4/2008 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 6/1/2007 | 6/1/2007 | 6/7/2007 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 6/7/2007 | 6/7/2007 | 6/7/2007 | P | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 1/26/2007 | 1/26/2007 | 1/29/2007 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 10/12/2006 | 10/12/2006 | 10/12/2006 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 9/6/2006 | 9/6/2006 | 9/6/2006 | | CANC |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 7/6/2006 | 7/6/2006 | 7/7/2006 | | DONE |
Mike Jordan
|
|
|
|
BLD-Aging Inspection | 4/26/2006 | 4/26/2006 | 4/26/2006 | | CANC |
Mike Jordan
|
|
|
|
DOC - Permit Expired | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Other | 4/15/2005 | 4/18/2005 | 4/18/2005 | A | PART |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/15/2005 at 9:48:54 PM. Called out for Grid ceiling at Pharmacy only..... appears OK (636) 4/18/2005 2:25:14 PM
|
BLD-Framing/Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/5/2005 at 2:13:45 PM. Contact: ###-####. bathroom walls and rads soffit 4/6/2005 12:23:44 PM
|
BLD-Framing/Rough-in | 3/22/2005 | 3/22/2005 | 3/22/2005 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 6:43:09 AM. Contact: ###-####. wall framing ok /pending header steel design from arch./need to verify foam trim. 3/22/2005 9:34:02 AM
|
Issue PAID IN FULL permit | | | 3/2/2005 | | DONE |
|
|
|
|
Telephone call | | | 2/8/2005 | | DONE |
|
|
|
left mess for jeff king at ###-#### is ready and need to pickup
|
Permit Ready to Issue | | | 11/9/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 11/9/2004 | | DONE |
|
|
|
|
Routing - FIRE | 11/2/2004 | | 11/5/2004 | | PASS |
|
|
|
resubmittal acceptable.
|
Routing - PLAN CHECK | 11/5/2004 | | 11/5/2004 | | PASS |
|
|
|
Permit and plans approved and taken to front desk.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2004 | | PASS |
|
|
|
|
Plan assigned to (JCB) | 9/24/2004 | | 11/5/2004 | | PASS |
|
|
|
11/5/2004 15:09:17 JCB - activity updated through activity BLDA022 from case BLD04-02214.
|
Routing - PLAN CHECK | 11/1/2004 | | 11/2/2004 | | PEND |
|
|
|
Plans to route to Fire Dept. for review of resubmittal sheets showing fire extinguisher locations.
|
Plan resubmittals received | | | 11/2/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Copys of sheets 3.0A, 3. 3.0B Taken to Jason B.
|
Telephone call | | | 11/1/2004 | | |
|
|
|
Called architect representative, Thom Metzger, following up on last few items to be addressed. Fire Dept review to be addressed and foam plastic information to be provided.
|
Routing - Erosion and Sediment | 10/29/2004 | | 11/1/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
1st review completed | | | 10/29/2004 | | FAIL |
|
|
|
failed plan check, ESC and Fire.
|
Routing - PLAN CHECK | 10/29/2004 | | 10/29/2004 | | FAIL |
|
|
|
Plans to route to Erosion/Sediment Control division for review again.
|
Routing - FIRE | 10/27/2004 | | 10/29/2004 | | FAIL |
|
|
|
need resubmittal showning PFE locations. Faxed review comments to architect.
|
Telephone call | | | 10/27/2004 | | |
|
|
|
Called architect representative, Thom Metzger, concerning flame spread and smoke developed index rating of foam. He said he would address and get back to me.
|
Routing - PLAN CHECK | 10/1/2004 | | 10/27/2004 | | FAIL |
|
|
|
One issue to still be addressed concerning the flame spread and smoke developed rating of foam and approval of plans by the Fire Department and Erosion/Sediment Control needed. Plans to route to Fire Dept.
|
Plan resubmittals received | | | 10/27/2004 | | DONE |
|
|
|
Received Transmittal Letter, 2 booklets of Design Code Acceptance, 2 booklets of Gator Foam Fire Information, 2 Fammability Characteristic booklets, 2 Safty Color Coding and Flame Spresd Information booklets, 2 Structural Calc booklets, 2 Photo Center detail booklets,2 Folding Door booklets . Taken to Jason B.
|
Telephone call | | | 10/21/2004 | | |
|
|
|
Called architect's representative, Thom Metzger, concerning some structural calculations needing to be provided and for clarification of a few issues. He acknowledged and said he would address and get back to me the following day.
|
Plan resubmittals received | | | 10/13/2004 | | DONE |
|
|
|
Received ESC application with 2 sets of plan and 2 narratives taken to Jason B.
|
Routing - PLANNING | 9/28/2004 | | 10/1/2004 | | PASS |
|
|
|
Approved per czc04-
|
Routing - PLUMBING | 9/27/2004 | | 9/28/2004 | | PASS |
|
|
|
1. hub drains must be vented refer to sht 4.0A grid lines D-2.6 2. need building cleanout sht 4.0A grid lines B-8.9 3. FS3 need two inch vents sht 4.0A grid lines G-4.8 4. need expansion protection 5. WH-1 sht 4.1A grid lines D-2.6 may need pan with a drain
|
Routing - Erosion and Sediment | 9/27/2004 | | 9/27/2004 | | FAIL |
|
|
|
ESC plan waiver request denied. Informed Mr. King at CTA.
|
Routing - PUBLIC WORKS | 9/24/2004 | | 9/27/2004 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/23/2004 | | DONE |
|
|
|
No MEC Compliance,No envelpoe , Need Waiver Request,
|
Plan resubmittals received | | | 9/23/2004 | | DONE |
|
|
|
Received Waiver letter put with plans.
|
Application received | | | 9/21/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/21/2004 | | DONE |
|
|
|
|
Fee Review-notes | 9/21/2004 | 9/21/2004 | | | |
|
|
|
|