Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD04-02268
StatusFinaled
Name PENDER VILLAGE HOMEOWNERS ASSN INC
Site Address 2488 N BOGUS BASIN RD
Project NameHIGHLANDS VILLAGE BLD 5
Customer Number 
ePlanReviewNo
Description
To construct a new 4,386 sq.ft. two story, duplex, with attached garages. Unit Type A is 2,129 sq.ft. two story, three bedroom, 2 1/2 baths, with an attached 445 sq.ft. two car garage, unit Type B is 2,257 sq.ft. two story, three bedrooms, 2 1/2 baths with an attached 403 sq.ft. two car garage. All construction per the approved plans and atached comment list. MJP DRH 02-240 CUP 02-00141
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  7/28/2016 DONE
Code Occupancy Approval5/17/20075/17/20075/17/2007PPASS
DetailsMichael Garner
SITE INSPECTION COMPLETE - i REVIEWED THE APPROVED PLANS AND CONDITIONS AND HAVE FOUND THEM TO BE IN SUBSTANTIAL COMPLIANCE: I DID NOTE THE FOLLOWING CHANGES -

1. PLANS CALLED FOR A SOLID PLANTER ON THE MINI-COURTYARD BETWEEN THE CENTER BLDGS - THAT WAS CHANGED TO INDIVIDUAL VASE PLANTERS PER CONSULTATION WITH THE FIRE DEPARTMENT WHO HAD CONCERNS ABOUT ACCESS TO HOSE CONNECTIONS AND INTO THE BLDGS. THEMSELVES

2. PLANS FOR THE CENTER BLDGS CALLED FOR THREE [3] VERTICALLY STACKED WINDOWS MIRRORING THE INTERIOR STAIRWELLS - THAT HAS BEEN CHANGED TO TWO WINDOWS, WITH THE MIDDLE WINDOW REMOVED TO ACCOMODATE A REQUIRED A NECESSARY STRUCTURAL BEAM

3. ORIGINAL PLANS CALLED FOR ROUGH-HEWN [CEDAR?] SHINGLES - BLDR. INSTEAD USED HARDI-PLANK SHINGLES BECAUSE THEY ARE LONGER LASTING, EASIER TO MAINTAIN

4. THE MOST INTERIOR [CLOSEST TO CREEK] BLDGS DO NOT HAVE A STUCCO SKIRT AS THE PLANS CALLED FOR...INSTEAD THEY HAVE A STONE SKIRT WHICH IS IN KEEPING WITH THE STONE SKIRTS ON ALL THE OTHER BLDGS.

THESE CHANGES ARE ACCEPTABLE AND WITHIN THE PARAMETERS OF THE SCOPE AND INTENT OF THE APPROVED PLANS AND CONDITIONS - PASS/CASE CLOSED
Case Summary (BLD)  3/16/2006  
BLD-Final11/22/200511/23/200511/23/2005APASS
DetailsTony Young
keil ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
DOC - Permit Finaled11/23/200511/23/200511/23/2005PPASS
DetailsTony Young
c of o issued
BLD-Final11/18/200511/21/200511/21/2005PNH
DetailsTony Young
Steve, ###-####
Plan Reviewer's activity  11/9/2005 DONE
Elevation Certificate has been APPROVED. Inspections can continue.
BLD-Final11/8/200511/8/200511/8/2005PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 11/8/2005 at 8:11:13 AM. Contact: ###-####. hand rail/all others signed off
BLD-Energy code compliance6/24/20056/24/20056/24/2005PPASS
DetailsDave Hannah
BLD-Energy code compliance6/23/20056/24/20056/24/2005ANR
DetailsDave Hannah
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in6/21/20056/22/20056/22/2005APART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/21/2005 at 3:42:44 PM. Contact: ###-####.ok to insulate after fixing minor issues,, need letter from arch. on venting issues, and access issues
BLD-Framing/Rough-in6/8/20056/8/20056/9/2005PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 6/8/2005 at 8:51:19 AM. Contact: ###-####.
ext. shear ok
BLD-Framing/Rough-in6/6/20056/6/20056/6/2005PFAIL
DetailsTony Young
Scheduled by a contractor via Hello! on 6/6/2005 at 7:36:50 AM. Contact: ###-####.
nail shear per plan
BLD-Framing/Rough-in4/29/20055/2/20055/2/2005PPART
DetailsTony Young
jim ; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
435 looked at lower,,, upper fire wall ok to stand 5/2/2005 1:22:06 PM
BLD-Foundation3/22/20053/22/20053/22/2005PPASS
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Footing3/17/20053/18/20053/18/2005APASS
DetailsTroy James
jim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Issue PAID IN FULL permit  2/14/2005  
Permit Ready to Issue  2/11/2005 DONE
Inspection Record Card- Bld  2/11/2005 DONE
Print Occupancy Form  2/11/2005 DONE
Telephone call  2/11/2005 DONE
Spoke with Joanie and told her that permit is ready & fees///2/11/05 11:45am BAS
Plan assigned to (M_P)9/15/200410/27/20042/10/2005 PASS
2/10/2005 13:42:17 M_P - activity updated through activity BLDA022 from case BLD04-02268.
Routing - PLAN CHECK1/28/2005 2/10/2005 PASS
PLANS/APPL TAKEN TO FRONT DESK  2/10/2005 DONE
Print Pending Permit.LaserJet4  2/10/2005 DONE
Case Summary (BLD)  2/10/2005 DONE
Routing - PLANNING1/25/2005 1/28/2005 PASS
Plans approved per CUP and DRH. kg
Routing - PLAN CHECK1/21/2005 1/25/2005  
Routing to PLanning
Plan resubmittals received  1/25/2005  
Received sheet A1.1.
Routing - PLAN CHECK11/5/2004 1/21/2005  
Routing to Planning.
Routing - PLANNING1/21/2005 1/21/2005 FAIL
Site plan and house plans not updated to reflect garage reconfiguration. kg
1st review completed  11/5/2004 FAIL
Waiting for others to approve prior to issuing permit.
Routing - PLAN CHECK10/27/2004 11/5/2004 PEND
Waiting for others to approve prio to issuing permit.
Routing - PLANNING10/15/2004 10/27/2004 FAIL
Landscape plan, which complies with Design Review conditions, has not been submitted per DRH04-240. Driveway does not have 22-feet of straight back-up between garage and sidewalk. Sidewalk needs to continue, as originally approved per CUP02-141. kg
Plan resubmittals received  10/21/2004  
Received two copies of rescheck compliance statements.
Routing - PLUMBING10/14/2004 10/15/2004 PASS
Duplex, no plumbing plan required. Install per 2003 UPC
Routing - Erosion and Sediment10/13/2004 10/14/2004 PASS
ESC was approved with conditions in May 04.
Routing - PUBLIC WORKS10/8/2004 10/13/2004 PASS
Routing - PLANNING Land Div10/4/2004 10/8/2004 PASS
Approved as Parcel A on ROS03-00009. ROS 6173 recorded on 5/22/2003
Plan routing begun/NEW & ADDTN  10/4/2004  
Plan resubmittals received  10/4/2004 DONE
Received Transmittal Letter, and 2 copys of the dimensioned plans ...
Plans ACCEPTED BY PLAN TECH  10/4/2004 DONE
Plan resubmittals received  9/30/2004  
Received RESCheck, & Grading/Drainage & 2 Calc Booklets.
Plans ACCEPTED BY PLAN TECH  9/30/2004 FAIL
Still waiting on dimensioned site plan.
Plans ACCEPTED BY PLAN TECH  9/29/2004 FAIL
Plans in Hold Box waiting for Grading & Drainage, RES Check Site plan dimensioned... Called Damon 9-29-04 for request on items needed....
Application received  9/28/2004