Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/30/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 12/29/2006 | | DONE |
|
|
|
First Notice has not been responded to.
|
Fee Review-notes | 9/30/2004 | 9/30/2004 | 12/29/2006 | | DONE |
|
|
|
|
First Notice | | 10/11/2006 | 12/27/2006 | | DONE |
|
|
|
|
First Notice | | 10/6/2006 | 12/27/2006 | | DONE |
|
|
|
|
Permanent Occupancy | | 10/11/2006 | 10/11/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 10/11/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11244 issued 10-11-06 to the Eagle Pointe Apts. for an ofc.
|
BLD-Final | 10/6/2006 | 10/9/2006 | 10/9/2006 | A | PASS |
Jim Storey
|
|
|
erin; Phone #: ###-#### - 1837 w. boise ave inspection Internet Inspection Request from: Patricia Smith
|
Permanent occupancy | | | 10/6/2006 | | PASS |
Wm. Michael Meloy
|
|
|
compliance met.
|
BLD-Aging Inspection | 10/2/2006 | 10/2/2006 | 10/2/2006 | | FAIL |
Jim Storey
|
|
|
ncfi
|
BLD-Aging Inspection | 8/2/2006 | 8/2/2006 | 8/2/2006 | | FAIL |
Jim Storey
|
|
|
|
Plan resubmittals received | | | 6/28/2006 | | |
|
|
|
received a letter of transmittal from architects design resources with "3" sheets of A0.1-plans taken to Mike Meloy
|
Plan resubmittals received | | | 6/27/2006 | | |
|
|
|
received a letter of transmittal from architects design resources with "3" sheets of A0.1-plans taken to mike phillips
|
Plan resubmittals received | | | 6/27/2006 | | |
|
|
|
received a letter of transmittal from architects design resources with "3" sheets of A0.1-plans taken to Jim Storey
|
FIRE-Final Inspection | 5/16/2006 | 5/17/2006 | 5/18/2006 | P | PASS |
Forrest France
|
|
|
Items on previous correction notice have been completed, inspection passed.
|
Code Occupancy Approval | 3/17/2006 | 3/17/2006 | 3/17/2006 | P | FAIL |
Dena Gambrel
|
|
|
Per phone conversation with Aaron, they have changed the landscaping that was approved per the plans. Informed him that they needed to bring in an updated landscape plan for approval.
|
FIRE-Final Inspection | 3/8/2006 | 3/9/2006 | 3/9/2006 | A | FAIL |
Forrest France
|
|
|
Lower the mounting height of the provided fire extinguisher to no higher than 48" AFF, post building address numbers as indicated in fire code review notes, provide approved hardware at the main entry/exit doors as discussed and reviewed on plan notes (remove door knob, manual thumbturns, provide keyed locking hardware and signage, single action hardware installed).
|
Inspection Record Card- Bld | | | 3/8/2006 | | |
|
|
|
|
Print Occupancy Form | | | 3/8/2006 | | |
|
|
|
|
BLD-Aging Inspection | 3/6/2006 | 3/6/2006 | 3/6/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 1/2/2006 | 1/2/2006 | 1/3/2006 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 10/31/2005 | 10/31/2005 | 10/31/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Aging Inspection | 8/30/2005 | 8/30/2005 | 8/30/2005 | | PASS |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/30/2005 | 6/30/2005 | 6/30/2005 | | PASS |
Jim Storey
|
|
|
wip
|
BLD-Framing/Rough-in | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | PASS |
Jim Storey
|
|
|
Darrin; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
BLD-Framing/Rough-in | 1/10/2005 | 1/11/2005 | 1/11/2005 | A | PART |
Troy James
|
|
|
Aaron; Phone #: ###-#### Internet Inspection Request from: Jan Rice ok to cover interior office only 1/11/2005 10:43:22 AM
|
BLD-Concrete | 12/17/2004 | 12/17/2004 | 12/17/2004 | P | PASS |
Jim Storey
|
|
|
Aaron; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Permit Ready to Issue | | | 12/6/2004 | | |
|
|
|
|
Inspection Record Card- Bld | | | 12/6/2004 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/6/2004 | | |
|
|
|
|
Telephone call | | | 12/6/2004 | | DONE |
|
|
|
talked to aaron at ###-####that permit is ready
|
Issue PAID IN FULL permit | | | 12/6/2004 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/6/2004 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/22/2004 | | 12/3/2004 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/3/2004 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/3/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/3/2004 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 10/1/2004 | | 12/3/2004 | | PASS |
|
|
|
12/3/2004 09:15:24 M_P - activity updated through activity BLDA022 from case BLD04-02303.
|
Routing - PLAN CHECK | 11/17/2004 | | 11/22/2004 | | FAIL |
|
|
|
Second review failed need information about snow load drifting on roof. Called and talked to Ryan at Design Resource's office.
|
Routing - PLANNING | 10/5/2004 | | 11/17/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 11/1/2004 | | 11/10/2004 | | FAIL |
|
|
|
Zoning Certificate note submitted.
|
Routing - Erosion and Sediment | 10/29/2004 | | 11/1/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLAN CHECK | 10/15/2004 | | 10/29/2004 | | |
|
|
|
Routing to ESC.
|
Plan resubmittals received | | | 10/28/2004 | | DONE |
|
|
|
Received two response letters, two Storm Water Pollution Prevention Plans two ESC-1 sheets, two sets of sheets A0.1,A1.1,A2.1,A7.1,S1.1,E1.1, taken to Mike P.
|
1st review completed | | | 10/15/2004 | | FAIL |
|
|
|
failed plan check, planning, and ESC
|
Routing - FIRE | 10/13/2004 | | 10/15/2004 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/5/2004 | | 10/13/2004 | | FAIL |
|
|
|
Plan review completed, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
|
Print permit w/o conditions | | | 10/13/2004 | | |
|
|
|
|
Routing - Erosion and Sediment | 10/5/2004 | | 10/5/2004 | | FAIL |
|
|
|
ESC plan waiver request denied. ESC plan will be required. Informed permit application contact.
|
Routing - PUBLIC WORKS | 10/1/2004 | | 10/4/2004 | | PASS |
|
|
|
|
Plan resubmittals received | | | 10/4/2004 | | DONE |
|
|
|
Received Transmittal Letter, & 2 Design Criteria Booklets Taken to Mike Phillips...
|
Plans ACCEPTED BY PLAN TECH | | | 9/30/2004 | | DONE |
|
|
|
needs calculations, and mechanical design applicant will bring them on Monday.10-4-04.
|
Application received | | | 9/30/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/30/2004 | | |
|
|
|
|