Information based on query as of Sunday, August 18, 2024.
Permit Information
Permit NumberBLD04-02335
StatusFinaled
Name MIKE MITCHELL (GC REP)
Site Address 7709 W OVERLAND RD
Project NameTHE BOISE SPECTRUM
Customer Number 
ePlanReviewNo
Description
(HAWAIIAN BBQ - THE BOISE SPECTRUM - BUILDING B - SUITE 110) This building is fire sprinklered for building area increase. To remodel an existing 1,474 square foot tenant space to be used as a restaurant. This space was formerly used for retail sales. Work is to include interior nonbearing walls, suspended ceilings, a grease hood, two grease ducts, two exhaust fans, service counters, gypsum board soffit, and interior finishes all per the approved drawings and the plan review report on file. Within the remodel area, the fire sprinkler system shall comply with NFPA 13-2002 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Fee Review-notes10/5/200410/5/20046/14/2006 DONE
Third Notice BLD5/20/20055/20/200512/9/2005 DONE
Second Notice has not been responded to.///Over a year old No final values
Second Notice BLD4/26/20054/26/20055/20/2005 DONE
First Notice has not been responded to.
First Notice 1/19/20054/26/2005 DONE
Permanent Occupancy 1/19/20051/19/2005 DONE
Details
Permanent occupancy  1/19/2005 DONE
Perm. Occ. Cert. # 10423 issued 1-19-05 to the Hawaian BBQ in the Boise Spectrum, Bldg. B.
BLD-Final1/14/20051/18/20051/18/2005PPASS
DetailsLane Manuel
Scheduled by a contractor via Hello! on 1/14/2005 at 4:21:02 PM. Contact: ###-####.
FIRE-Final Inspection1/7/20051/10/20051/10/2005PPASS
DetailsTroy Cobbley
fire life safety finaled 1/10/2005 3:20:39 PM
BLD-Framing/Rough-in11/22/200411/23/200411/23/2004PPART
DetailsLane Manuel
Scheduled by a contractor via Hello! on 11/22/2004 at 1:05:18 PM. Contact: ###-####.
gave ok to rock the radius soffit, and walls. 11/23/2004 1:46:29 PM
Issue PAID IN FULL permit  10/27/2004 DONE
Inspection Record Card- Bld  10/26/2004 DONE
Print Occupancy Form  10/26/2004 DONE
Permit Ready to Issue  10/26/2004  
Telephone call  10/26/2004 DONE
talked to david blenker at ###-#### that permit is ready
Routing - FIRE10/19/2004 10/22/2004 PASS
1st review completed  10/22/2004 PASS
Routing - PLAN CHECK10/22/2004 10/22/2004 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/22/2004 DONE
Plan assigned to (CJW)10/8/2004 10/22/2004 PASS
10/22/2004 11:03:11 CJW - activity updated through activity BLDA022 from case BLD04-02335.
Routing - PLAN CHECK10/14/2004 10/19/2004 PASS
The IBC plan review was started October 18, 2004 and was finished the next day. The drawings were approved with clarifications. See the plan review report.
Routing - PLUMBING10/12/2004 10/14/2004 PASS
approved as noted and per 2003 UPC. 2 requirements if soda and soap dispensers are installed. None shown on plan.
Routing - PUBLIC WORKS10/8/2004 10/12/2004 PASS
Failed by Walter Baumgartner-Environmental - grease abatement required.
Plans ACCEPTED BY PLAN TECH  10/5/2004 DONE
Application received  10/5/2004  
Recd Pcfee & Taken To Pln CK  10/5/2004