Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD04-02409
StatusFinaled
Name KEYNETICS
Site Address 917 S LUSK ST
Project NameKEYNETICS
Customer Number 
ePlanReviewNo
Description
(KEYNETICS OFFICE - SHELL & CORE) To construct a new 27,958 sq.ft. three story, metal frame exterior walls, concrete floors, metal roof deck and a roof top structure for mechanical equipment. Each floor is approximately 9,172 sq.ft. with interior CMU walls around restrooms and stair enclosures, metal framed walls located at lobby and entry areas. NOTE: This building is fully fire sprinklered for story and area increase. All construction per the approved plans and attached comment list. Separate plans and permits must be obtained to finish each tenant area. Refer to BLD 04-02444 for the grading. MJP DRH 04-0118 CUP 04-0063 Note: This building is within the 100 year floodplain. Two elevation certificates required (one prior to issuance of permit and the other after first floor is installed). First elevation certificate received 11/18/04 by J. Wyllie, Public Works.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Letter of compliance  12/21/2005 DONE
Letter of Compliance issued 12-21-05.
BLD-Final12/20/200512/20/200512/20/2005PPART
DetailsJim Storey
nick bateman; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa ok for l/c pending mech sign off of permit for gas/hydronics
FIRE-Final Inspection12/19/200512/20/200512/20/2005PPASS
DetailsForrest France
Fire life safety is acceptable, door hardware at some locations is not installed at this time-hardware is on site and verified for approval, to be installed prior to structural final for verification.
BLD-Final12/15/200512/16/200512/16/2005PNR
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
FIRE-Final Inspection12/15/200512/16/200512/16/2005ANR
DetailsForrest France
Associated fire alarm permit must be finaled prior to life safety final.
FIRE-Final Inspection12/13/200512/14/200512/14/2005PNR
DetailsForrest France
Fire alarm and fire sprinkler must be inspected and approved prior to life safety final.
Code Occupancy Approval10/26/200510/26/200510/26/2005PPASS
DetailsWm. Michael Meloy
Compliance Met.
BLD-Aging Inspection9/26/20059/26/20059/26/2005 PASS
DetailsJim Storey
ti work in progess.
FIRE-Conference7/27/20057/27/20057/27/2005PDONE
DetailsForrest France
On site discussion with Nick the general contractor regarding fire department lane and street access requirements.
BLD-Framing/Rough-in6/15/20056/15/20056/15/2005PPASS
DetailsJim Storey
fr on the roof- nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie roof wall framing and sheer atchment ok
BLD-Framing/Rough-in6/8/20056/8/20056/8/2005PPASS
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa exterior framing ok.
Case Summary (BLD)  6/3/2005  
BLD-Other5/23/20055/23/20055/23/2005PPASS
DetailsJim Storey
roof ok /walls ext. east end ok
BLD-Framing/Rough-in5/19/20055/23/20055/23/2005ANR
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Concrete4/26/20054/27/20054/27/2005PPASS
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore thidr floor deck ok
BLD-Other3/10/20053/10/20053/10/2005PPASS
DetailsJim Storey
cmu cinder block re-bar//nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore reviewed special insp. reports to date/ spoke with insp. will top out next week. 3/10/2005 4:29:23 PM
BLD-Foundation2/14/20052/14/20052/14/2005PPART
DetailsDave Hannah
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Foundation2/1/20052/1/20052/1/2005PPART
DetailsTom Arcoraci
nick; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wip ok 2/1/2005 1:59:42 PM
BLD-Footing1/28/20051/31/20051/31/2005APART
DetailsJim Storey
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice north center tower ft cage ok verts to be insp by si. 1/31/2005 10:20:13 AM
BLD-Foundation1/24/20051/25/20051/25/2005APART
DetailsDave Hannah
Rebar insp.; Phone #: ###-#### Internet Inspection Request from: Jan Rice
BLD-Footing1/20/20051/21/20051/21/2005APART
DetailsJim Storey
Nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice si to verrify 5c step ft hook bar spacing to per plan in report, 1/21/2005 11:52:48 AM
FIRE-Final Inspection1/20/20051/21/20051/21/2005ACANC
DetailsRick Jackson
Jim; Phone #: ###-#### Internet Inspection Request from: Jan Rice Wrong permit number called in 1/21/2005 9:52:13 AM
BLD-Footing1/19/20051/19/20051/19/2005PPART
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie 5.3 grid line around elavator si pending bar ok 1/19/2005 11:57:40 AM
BLD-Footing1/12/20051/13/20051/13/2005APART
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice si 1/13/2005 10:10:22 AM
BLD-Foundation1/12/20051/13/20051/13/2005APART
DetailsJim Storey
nick; Phone #: ###-#### Internet Inspection Request from: Jan Rice si 1/13/2005 10:10:28 AM
(F) Reprint permit  12/15/2004  
Issue & PRINT permit  12/14/2004 DONE
Routing - PLAN CHECK12/3/2007 12/7/2004 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/7/2004 DONE
Inspection Record Card- Bld  12/7/2004 DONE
Permit Ready to Issue  12/7/2004 DONE
Telephone call  12/7/2004 DONE
talked to trent koci at ###-#### that permit is ready & need a.c.h.d.
Plan assigned to (M_P)10/27/2004 12/7/2004 PASS
12/7/2004 09:22:53 M_P - activity updated through activity BLDA022 from case BLD04-02409.
Routing - PLANNING12/3/2004 12/3/2004 PASS
Resubmitted Plans comply with CUP04-63. Kgallagher
DRH previously approved per TWilson.
Routing - PLANNING11/30/2004 12/2/2004 FAIL
Failed - resubmittals were not included.
Plan resubmittals received  12/2/2004 DONE
Received two copies of revised sheets C-2.0 and LS-1. Routed to Karen G. kmm
Routing - PUBLIC WORKS11/22/2004 11/30/2004 PASS
Routing - PLAN CHECK11/30/2004 11/30/2004  
Route to Planning.
Routing - PLAN CHECK11/19/2004 11/22/2004  
Routing to P.W.
Routing - PLAN CHECK11/12/2004 11/19/2004 PEND
Review accessible entrance to this building when new site plans arrive because of raising the building because of flood plane issues.

Waiting for others to approve prior to issuing permit.
Routing - PLANNING11/8/2004 11/12/2004 FAIL
Failed per Conditional Use: need Drainage Dist #3, BPR (including tree pruning notes), and ACHD License Agreement. Approved 11/8/04 by Tempra Wilson per DRH04-118.
Plan resubmittals received  11/8/2004 DONE
Received two copies of revised sheets A-1.1, A-1.2, A-1.3, A-2, A-5.1, A-5.2, A-5.3, A-5.4, A-6.1, A-6.2, A-7.1 and one copy of response letter. Routed to Mike P. kmm
Routing - PLAN CHECK11/5/2004 11/8/2004  
Routing to Planning
Routing - PUBLIC WORKS11/5/2004 11/5/2004 FAIL
Nees elevation certificate documenting compliance with floodplain ordinance. Contact Jim Wyllie at ###-####
1st review completed  11/5/2004 FAIL
failed Planning, plan check, structural, and public works.
Routing - PLAN CHECK11/5/2004 11/5/2004  
Routing to P.W.
Routing - FIRE11/1/2004 11/5/2004 PASS
Plan resubmittals received  11/2/2004 DONE
Received two copies of revised sheets C1.0, C2.0, C3.0, C.4.0, C.5.0, C.5.1, C.6.0, SD-1, LS-1. Routed to Mike P. kmm
Routing - PLAN CHECK10/27/2004 11/1/2004 FAIL
Plan review completed, sent correction report to architect, requesting additional information be submitted for further review prior to issuing permit.
Plan Reviewer's activity  11/1/2004  
Structural review completed by plan reviewer. No further review required for structural comments.
Routing - PARKS DEPARTME10/27/2004 10/27/2004 PASS
Plans approved by Cheyne Weston as noted on the plans and per letter of 10/26/04 to Bill Strite (attached to plan sets).
Routing - PLANNING10/22/2004 10/27/2004 FAIL
Failed due to non-compliance with conditions of approval for CUP04-63 (Karen Gallagher) and DRH04-00118 (Tempra Wilson).
Plan assigned to (JCM)10/13/2004 10/27/2004 DONE
Because of work load this project was reassigned to Mike Phillips. JCM
Plan resubmittals received  10/26/2004 DONE
Received Transmittal Letter, & 3 Copys of sheets S5.1,S1.1,S2.1,S2.2,S2.3 & 1 EXTRA SHEET OF S5.1 Taken to John Menard......
Routing - PLUMBING10/21/2004 10/22/2004 PASS
upproved per plan and 2003 UPC
Routing - Erosion and Sediment10/20/2004 10/21/2004 PASS
ESC approved under former ESC permit, #04-01378.
Routing Off Site - STRUCTURAL10/18/2004 10/20/2004 FAIL
Contacted PDQ for outside delivery. - Received faxed comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  10/20/2004  
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
Routing - PUBLIC WORKS10/18/2004 10/20/2004 FAIL
Requires separate sewer plans and requires DEQ approval. Contact Jim Pardy at ###-####
Routing - PLANNING Land Div10/13/2004 10/18/2004 PASS
Approved. Block 9 of Boise City Park Subdivision. Alleys have been vacated by ACHD.
Plans ACCEPTED BY PLAN TECH  10/13/2004 DONE
Plan routing begun/NEW & ADDTN  10/13/2004 DONE
Application received  10/12/2004