Case Summary (BLD) | | | 8/22/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/22/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/22/2014 | | DONE |
Tisha Gallop
|
|
|
|
Case Summary (BLD) | | | 8/22/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 8/18/2014 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/3/2010 | | DONE |
|
|
|
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/3/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | 6/10/2008 | 6/10/2008 | 8/11/2008 | | DONE |
Jim Storey
|
|
|
|
BLD-Aging Inspection | 6/10/2008 | 6/10/2008 | 6/10/2008 | | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 6/10/2008 | 6/10/2008 | 6/10/2008 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 4/10/2008 | 4/10/2008 | 4/10/2008 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
Code Occupancy Approval | | | 4/2/2008 | | DONE |
|
|
|
Landscaping, lot improvements, other plan requirements met here. Extensive landscaping completed per bld04-02464 and DRH03-00186.
|
BLD-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/20/2008 | | DEFR |
Jim Storey
|
|
|
fir sprk permit out standing defr. to fir.
|
BLD-Conference | 1/16/2008 | 1/16/2008 | 1/16/2008 | P | PASS |
Jim Storey
|
|
|
mike Phone #: ###-####
|
BLD-Conference | 1/7/2008 | 1/8/2008 | 1/8/2008 | A | PASS |
Jim Storey
|
|
|
Mike Please call 1/2 hr before going out Phone #: ###-####
|
BLD-Aging Inspection | 1/4/2008 | 1/4/2008 | 1/4/2008 | | PASS |
Jim Storey
|
|
|
work still in progress.
|
BLD-Aging Inspection | 10/22/2007 | 10/22/2007 | 10/23/2007 | | NR |
Jim Storey
|
|
|
fir permit open
|
PubWorks Occupancy Approval | 4/2/2008 | 4/2/2008 | 9/10/2007 | | DONE |
|
|
|
PW inspection completed and signed off permanent occupancy 09/10/07 by D. Erskine.
|
BLD-Aging Inspection | 7/19/2007 | 7/19/2007 | 7/24/2007 | | PASS |
Jim Storey
|
|
|
wip pending all others.
|
Inspection Record Card- Bld | | | 7/3/2007 | | DONE |
|
|
|
|
BLD-Aging Inspection | 4/17/2007 | 4/17/2007 | 4/18/2007 | | NR |
Jim Storey
|
|
|
pending fire
|
FIRE-Final Inspection | 2/13/2007 | 2/15/2007 | 2/15/2007 | A | NR |
Forrest France
|
|
|
Missing second pc. 401 FS escutcheons at building A1 canopy, provide knox box, scaffold at the perimeter of bld A1 must be removed prior to final.
|
FIRE-Final Inspection | 1/29/2007 | 1/30/2007 | 1/30/2007 | A | FAIL |
Forrest France
|
|
|
The project related fire sprinkler permit must be approved for final prior to building life safety final.
|
FIRE-Supply Line Flush | 1/18/2007 | 1/19/2007 | 1/19/2007 | A | PART |
Forrest France
|
|
|
Inspection scheduled for an UG fire supply line flush for the project related fire sprinkler permit, flush completed satisfactory.
|
FIRE-Supply Line Flush | 1/18/2007 | 1/18/2007 | 1/18/2007 | P | DEFR |
Forrest France
|
|
|
Rescheduled
|
FIRE-Supply Line Flush | 1/16/2007 | 1/16/2007 | 1/16/2007 | P | NR |
Forrest France
|
|
|
Lacking coordination to provide water supply for UG fire line flush.
|
BLD-Framing/Rough-in | 12/11/2006 | 12/13/2006 | 12/13/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | FAIL |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns still missing bracing and need resolve to diaphram hardware atchment.
|
BLD-Framing/Rough-in | 11/27/2006 | 11/28/2006 | 11/28/2006 | P | FAIL |
Jim Storey
|
|
|
Jim, Can you please call me and let me know what time you will be here so I can let my framer know. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 11/14/2006 | 11/14/2006 | 11/14/2006 | P | PART |
Jim Storey
|
|
|
todd; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Other | 9/18/2006 | 9/18/2006 | 9/18/2006 | P | PASS |
Jim Storey
|
|
|
Jim, this inspection is for the acoustical ceiling in Lee's Candy Store; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 8/24/2006 | 8/25/2006 | 8/25/2006 | A | PASS |
Jim Storey
|
|
|
Jim, Concrete is suppose to start showing up at 10:00AM Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 8/20/2006 | 8/21/2006 | 8/21/2006 | A | PASS |
Jim Storey
|
|
|
Jim, we are getting concrete at 1:00PM Can you do the inspection right before lunch? Thanks,; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 8/15/2006 | 8/16/2006 | 8/16/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
FIRE-Sprinkler Rough-in | 8/15/2006 | 8/15/2006 | 8/15/2006 | P | PART |
Forrest France
|
|
|
Inspection for approval to cover OH fire sprinkler installation at the Dollar store drop ceiling areas, rough-in is okay for the drop ceiling only. Noted to GC the fire sprinkler permit is only issued in a "partial" status due to resubmittal items required per plan review. Also noted that it appears no UG permit for the fire supply connection has been issued for bldg A1.
|
FIRE-Sprinkler Rough-in | 8/9/2006 | 8/10/2006 | 8/10/2006 | A | FAIL |
Forrest France
|
|
|
Forest, This is an inspection for the fire riser underground and thrust blocking at bldg A-1, I did not know exactly what inspection that was listed under. Thanks, Todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns NOTE: No sprinkler permit related to the UG work could be located, notified contractor of possible work without permit.
|
BLD-Foundation | 7/19/2006 | 7/20/2006 | 7/20/2006 | A | PART |
Mike Jordan
|
|
|
Tony, this is our stem wall inspection we are pouring concrete at noon thanks,todd; Phone #: ###-#### Internet Inspection Request from: Todd Kurns. Store front for Lees Candy was changed, Door shrunk and windows were moved . Exisiting verts at jambs no longer match changes. Contractor awaiting fix from structural engineer. Will have RFI from enginner for city and will get special insp. if any is required.
|
BLD-Footing | 7/17/2006 | 7/18/2006 | 7/18/2006 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns 6 column ftgs and front ftg in front of lees candies ok
|
BLD-Framing/Rough-in | 7/6/2006 | 7/10/2006 | 7/10/2006 | A | FAIL |
Jim Storey
|
|
|
Jim, This will be a partial inspection on the framing so that the stucco contractor can start covering; Phone #: ###-#### Internet Inspection Request from: Todd Kurns need engineering to justify 3/4 for sheer nail sch. need blk and nail all other walls and roof diaphrams. thru bolts at glb conections.
|
BLD-Other | 6/30/2006 | 6/30/2006 | 6/30/2006 | A | PASS |
Mike Jordan
|
|
|
Demo (phase 1) complete. Verify removal of 16K + sq .ft structure. Bldg. has been demoed and removed. Hole is to be backfilled. Did note some on site material with excessive const. debri making this fill unsuitable for backfill. GC was notified and also left message with jobsite super and contacted special insp. agency.
|
BLD-Footing | 6/7/2006 | 6/9/2006 | 6/9/2006 | A | PASS |
Jim Storey
|
|
|
Jim, The cement truck is scheduled for 11:00 AM delivery. Could you please inspect before that. Thanks,; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Framing/Rough-in | 6/7/2006 | 6/7/2006 | 6/7/2006 | A | PASS |
Jim Storey
|
|
|
Backing and blocking for rough sawn timbers in order to cover wall; Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/15/2006 | 5/16/2006 | 5/16/2006 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/12/2006 | 5/15/2006 | 5/15/2006 | A | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns
|
BLD-Footing | 5/12/2006 | 5/12/2006 | 5/12/2006 | P | CANC |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Todd Kurns Inspection cancelled from web by: Todd Kurns
|
Issue & PRINT permit | | | 2/24/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 2/16/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/16/2006 | | DONE |
|
|
|
|
Telephone call | | | 2/16/2006 | | |
|
|
|
Informed Paul (Genther Masonry) ###-#### to pick up permit 2-16-06 eus
|
Routing - PLAN CHECK | 2/14/2006 | | 2/15/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/15/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 2/15/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 2/15/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 10/19/2004 | | 2/15/2006 | | PASS |
|
|
|
2/15/2006 09:48:37 M_P - activity updated through activity BLDA022 from case BLD04-02464.
|
Routing - PLUMBING | 2/13/2006 | | 2/14/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLAN CHECK | 2/10/2006 | | 2/13/2006 | | |
|
|
|
Routing to plumbing.
|
Plan resubmittals received | | | 2/10/2006 | | DONE |
|
|
|
Received 2 copys of sheet P1.1 taken to Mike P.
|
Routing - PLAN CHECK | 2/7/2006 | | 2/10/2006 | | PEND |
|
|
|
Waiting for others to approve prior to issuing permit.
|
Routing - PLANNING Land Div | 2/7/2006 | | 2/7/2006 | | PASS |
|
|
|
Site is combined into one tax parcel #R1779500035. Received copy of Ada County Land Records Parcel Activity Form on February 7, 2006.
|
Routing - PLANNING Land Div | 1/25/2006 | | 1/27/2006 | | FAIL |
|
|
|
The Ada County Assessor's map still shows a property line approximately where the center line of the vacated Day Vista Street was located. There are still two separate tax parcel numbers for the two parcels between Cassia Street and Day Drive. Must combine these two parcels into one tax parcel number.
|
Routing - PLUMBING | 1/24/2006 | | 1/25/2006 | | FAIL |
|
|
|
resent review from 3/22/05
|
Routing - PLAN CHECK | 1/23/2006 | | 1/24/2006 | | |
|
|
|
Route to plumbing.
|
Routing - FIRE | 1/19/2006 | | 1/23/2006 | | PASS |
|
|
|
Recieved proper United Water documentation. See attached comments.
|
Routing - PLAN CHECK | 12/14/2005 | | 1/19/2006 | | FAIL |
|
|
|
Second review failed, need COMcheck for building "A" for the building envelope.
|
Plan resubmittals received | | | 1/6/2006 | | DONE |
|
|
|
Received 1 response,1 united water sheet,1 project start-up for special inspections,1 revised phase two buildfing a calcs,2 structural calcs,1 comments, & 2 copys of sheets A2.3,A2.4,A4.2 Taken to Mike P.
|
1st review completed | | | 12/13/2005 | | FAIL |
|
|
|
FAILED PLANNING PLAN CHECK PLUMBING FIRE.
|
Routing - FIRE | 11/30/2005 | | 12/13/2005 | | FAIL |
|
|
|
sent to FV 12/8/05
NEW SCOPE OF WORK PLAN SETS.
FAILED PLANNING LAND, PLUMBING AND PLAN CHECK
|
Routing - PLAN CHECK | 3/22/2005 | | 11/30/2005 | | FAIL |
|
|
|
Plan review complete, sent correction report to the architect requesting additional informaiton be submitted for further review prior to issuing permit.
NEW SCOPE OF WORK PLAN SETS.
|
Plan resubmittals received | | | 10/12/2005 | | DONE |
|
|
|
Received 1 certificate of value, & 3 Copys of sheets COVER,C-1,C-2,C-3,C-4,C-5,C-6,C-7,L1.0,L1.1,L1.2,L1.3,L2.0,L2.1,L2.3,L2.4,AS1.1,AS1.2,AS1.4,AS1.5,D1.1,D1.2,A1.1,A1.2,A2.1,A2.3,A2.4,A4.1,A4.2,A5.1,A5.2,A6.1,A6.2,A6.5,A6.6,A7.1,A8.1,A8.2,A8.4,A8.5,A9.1,A9.2,A10.1,A10.2,A10.3,A10.4,S0.1,S0.2,S1.1,S1.2,S1.3,S2.1,S2.2,S2.3,S3.2,S3.3,S3.4,S4.1,S4.2,S4.3,S4.4,S4.5,S4.6,S4.7,S4.8,S4.9,MC1.1,M1.1,M2.1,M2.2,M3.1,M4.1,P1.1,P1.2,E1.1,ED1.1,ED1.2,ED1.3,ES1.1,ES1.2,ES1.3,E2.1,E2.3,E2.4,E4.1,E4.2,E5.1,E5.2,E6.1,E6.2 Taken to Mike P.
|
Routing - PLUMBING | 3/22/2005 | | 3/22/2005 | | FAIL |
|
|
|
NEW SCOPE OF WORK PLAN SETS. provide plans showing roof drainage piping for building A-1 from roof drains to their connections with the site systems.
|
Routing - PLANNING | 3/18/2005 | | 3/22/2005 | | PASS |
|
|
|
NEW SCOPE OF WORK PLAN SETS.
Susan Riggs. CUP03-00095/Mod 1
Ok to approve for Conditional Use.
Marty Santyo. Approved per DRH03-00186.
|
Routing - Erosion and Sediment | 3/17/2005 | | 3/18/2005 | | PASS |
|
|
|
NEW SCOPE OF WORK PLAN SETS. ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 3/10/2005 | | 3/17/2005 | | PASS |
|
|
|
NEW SCOPE OF WORK PLAN SETS.
|
Routing - PLANNING Land Div | 3/9/2005 | | 3/10/2005 | | FAIL |
|
|
|
NEW SCOPE OF WORK PLAN SETS. Property line exists under Building B1. (Property line appears to be old centerline of vacated right-of-way for Day Vista Street). Need to remove property line. Call Paul McDonald on March 10, 2005 and informed him of issue.
|
Plan resubmittals received | | | 3/4/2005 | | DONE |
|
|
|
RESUBMITTED COMPLETE NEW SETS OF ALL PLANS AS SCOPE OF WORK HAS CHANGED. ALL NEW PLANS BEGAN ROUTING CIRCULATION ON 3/9/05. (MSouthard)
|
Routing - PLAN CHECK | 12/14/2004 | | 12/14/2004 | | HOLD |
|
|
|
PLANS PUT ON HOLD. SCOPE OF WORK TO CHANGE.
|
Routing - PLANNING | 11/15/2004 | | 12/14/2004 | | FAIL |
|
|
|
Plans were being held by conditional use and Design Review staff for the resubmittal of revised plans and information. However, there may an additional delay in time due to Forestry's requirements needing to be corrected, and how plan changes may/may not interface with revisions. Therefore, rather than continuing to hold onto the building permit plans in order to wait for revisions, P & Z staff is failing the building permit plans for the review process by other divisions. MGS.
DRH03-00186. Marty Santoyo, CUP03-00087, 88, 89, 95 Susan Riggs
|
Routing - PLUMBING | 11/9/2004 | | 11/15/2004 | | PASS |
|
|
|
1. water services to new buildings will require backflow protection and expansion protection
|
Plan Reviewer's activity | | | 11/9/2004 | | |
|
|
|
Removed from hold, routing to plumbing for their review.
|
Routing - PLAN CHECK | 10/27/2004 | | 11/9/2004 | | |
|
|
|
Removed from hold, plans reflect the removal of Building "C". Routing to resume.
Plan at my desk waiting for new plans to be submitted eliminating building "C" from the plan set.
|
Routing - PLUMBING | 10/26/2004 | | 10/27/2004 | | HOLD |
|
|
|
Plans removed by Mike Phillips. New plans will be resubmitted and then the routing process wil begin again.
|
Routing - PUBLIC WORKS | 10/20/2004 | | 10/26/2004 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 10/26/2004 | | 10/26/2004 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 10/19/2004 | | 10/20/2004 | | FAIL |
|
|
|
Must vacate Day Street and combine parcels. E-mailed Paul Macdonald on 10/20/04.
|
Plans ACCEPTED BY PLAN TECH | | | 10/19/2004 | | DONE |
|
|
|
Mech. compliance cert. not signed and Paul MacDonald will be bring in drainage calcs. kmm Received drainage calcs. and put with plans. kmm
|
Application received | | | 10/19/2004 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/19/2004 | | |
|
|
|
|
BLD-Final | 4/9/2008 | 4/10/2008 | | A | |
Jim Storey
|
|
|
Todd Phone #: ###-####
|
Fee Review-notes | 10/19/2004 | 10/19/2004 | | | |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/19/2004 | | | | |
|
|
|
Contacted PDQ to take plans to outside engineering. kmm
|