BLD-Final | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | PASS |
Tom Arcoraci
|
|
|
nate; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
DOC - Permit Finaled | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | PASS |
Tom Arcoraci
|
|
|
Finaled by inspector at 3/22/2005 1:28:16 PM
|
(F) Reprint permit | | | 2/9/2005 | | DONE |
|
|
|
|
BLD-Energy code compliance | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Tom Arcoraci
|
|
|
NAT; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Framing/Rough-in | 1/14/2005 | 1/18/2005 | 1/18/2005 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/14/2005 at 11:22:21 AM. Contact: ###-####.
|
BLD-Foundation | 11/8/2004 | 11/9/2004 | 11/9/2004 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/8/2004 at 5:31:35 PM. Contact: ###-####.
|
BLD-Footing | 11/7/2004 | 11/8/2004 | 11/8/2004 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 11/7/2004 at 6:46:46 PM. Contact: ###-####.
|
Plan assigned to (DJO) | 11/3/2004 | 11/3/2004 | 11/5/2004 | | PASS |
|
|
|
11/5/2004 08:47:10 DJO - activity updated through activity BLDA022 from case BLD04-02467.
|
Plan Reviewer's activity | | | 11/5/2004 | | DONE |
|
|
|
11/04/2004 designer has red-lined plans and submitted engineering for beam to pick up girder load and the overheight brg. walls. footprint revised to obtain proper garage clearances. ok to issue
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/5/2004 | | DONE |
|
|
|
|
Plan Review Report | | | 11/5/2004 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 11/5/2004 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/5/2004 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/5/2004 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/5/2004 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/3/2004 | | FAIL |
|
|
|
rescheck incorrect, tall wall engineering not addressed, point load from girder to be addressed, garage does not meet minumum dimensions, porch footings not to frost, missing smoke detectors. have informed both contractor and designer.
|
Pending Assignment by DJO | 10/19/2004 | | 11/3/2004 | | DONE |
|
|
|
11/3/2004 16:48:23 DJO - activity updated through activity BLDA169 from case BLD04-02467.
|
Plans ACCEPTED BY PLAN CHECK | | | 11/3/2004 | | |
|
|
|
|
Routing - PUBLIC WORKS | 10/26/2004 | | 10/27/2004 | | PASS |
|
|
|
|
Routing - PLANNING | 10/26/2004 | | 10/26/2004 | | PASS |
|
|
|
Plans redlined - front setback requirement met.
|
Routing - PLANNING | 10/20/2004 | | 10/22/2004 | | FAIL |
|
|
|
hold for setback revision. Applicant to come in next week to solve.
|
Application received | | | 10/19/2004 | | |
|
|
|
|
Routing - PLANNING Land Div | 10/19/2004 | | 10/19/2004 | | PASS |
|
|
|
Approved for one time lot split. ROS 6494.
|
Routing - PLAN CHECK | 10/27/2004 | | | | |
|
|
|
Dan O.
|